Loading…
Loading…
Tender Value
₹66.1 L
EMD Value
₹66,100
Closing Date
12 Mar 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
New construction Compound Wall & Waiting Shed Area Shed Work of MPC Building (04 Nos) At.Pipalkuva,Motikhervan,Patharda,Vadibhesrot Ta.Songadh Dist.Tapi
282999
2025-26/159/02
Open
Civil Works - Buildings
Tapi
1 document required · 1 mandatory
₹2,400
Yes
PIU-General Fund A/c 11-114
₹66,100
Yes
5 Mar 2026
5 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Quantitiy Estimated Rates Total Amount
Quantitiy Estimated Rates Total Amount
Estimated Item Of Work Unit may be more or
may be more In Figure In word less
Excavation for foundation up to 1.5 M. Depth including sorting out
and stacking of useful materials and disposing of the excavated Rupees One Hundred Twenty and Zero
stuff up to 50 meter lead (A) Loose or soft soil Paisa Only
Boring holes 3.5m deep in lordinary soil (for cast in situ piles) and
getting out the soil and disposal of the surplus excaated soil as Rupees One Thousand Three Hundred
directed within a lead of 50 metre follwoing diameter of pilses.(iii) Thirty Five and Paisa Sixty Two Only
Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20mm nominal size) and curing Rupees Three Thousand Seven Hundred
complete including cost of form work in (A) Foundation and plinth Eighty Six and Paisa Forty Six Only
Providing and laying ordinary cement concrete 1:2:4 (1 Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
finishing smooth with,curing etc. complete including the cost of Rupees Twelve Thousand Two Hundred
formwork but excluding the cost of reinforcement for R.C.C work in Forty Nine and Paisa Twenty Two Only
(B) COLUMNS: (i) Having cross-sectional area 0.05 to 0.08 Sq.M
Providing and laying ordinary cement concrete 1:2:4 (1 Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
finishing smooth with,curing etc. complete including the cost of Rupees Twelve Thousand Two Hundred
formwork but excluding the cost of reinforcement for R.C.C work in Forty Nine and Paisa Twenty Two Only
(B) COLUMNS: (i) Having
cross-sectional area 0.05 to 0.08 Sq.M
Providing and laying ordinary cement concrete 1:2:4 (1 Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
Rupees Eight Thousand Five Hundred
finishing smooth with,curing etc. complete including the cost of
6 28.00 8593.80 Ninety Three and Paisa Seventy Nine Cumt
formwork but excluding the cost of reinforcement for R.C.C work in
(A) BEAMS :(i) Having cross
sectional area 0.05 to 0.08 Sq.M
Quantitiy Estimated Rates Total Amount
Quantitiy Estimated Rates Total Amount
Estimated Item Of Work Unit may be more or
may be more In Figure In word less
Provdg & laying ordinary cement concerete 1:2:4 (1 cement:
coarse sand : 4 graded stone aggregate 20 mm nominal size) for
RCC lintel incl. finishing smooth with curing etc. complete including Rupees Nine Thousand Ninety Nine and
the cost of form work but excluding the cost of reinforcement up Paisa Thirty Eight Only
to floor two level Lintel/ Coping
Providing T M T. bar FE 500 D reinforcement for R.C.C. work
Rupees Seventy Seven and Paisa
8 16152.00 including bending binding and placing in position complete up to 77.29 Kgs
Twenty Eight Only
floor two level.
Half brick masonry in common burnt clay building bricks having
crushing strength not less than 35 Kg/ Cm2 in cement mortar 1:4
Rupees Six Hundred Fifty Six and Paisa
9 828.00 (1 cement : 4- Coarse sand) with 2 Nos. of 6 mm dia mild steeld 656.34 Cumt
Thirty Three Only
round bar after every three coarse embeded in cement mortar
super structure (for G.F) Conventional.
Steel work, riveted in built up sections framed work including
cutting, hoisting, fixing in position and applying a priming coat of Rupees Six Thousand Seven Hundred
red lead paint. (D) In trussses and trussed purlins, upto 25 M. span Forty Seven and Paisa Eight Only
and 15 M ovarall height.
20mm thick sand faced cement plaster on wall upto height
metres above ground level consisting of 12mm thick backing coat Rupees Three Hundred Thirty Seven
of c.m. 1:3 (1 cement : 3 sand) and 8 mm thick finishing coat of and Paisa Fifty Two Only
c.m. 1:1 (1 cement : 1 sand) etc. complete
Quantitiy Estimated Rates Total Amount
Quantitiy Estimated Rates Total Amount
Estimated Item Of Work Unit may be more or
may be more In Figure In word less
Finishing wall with weather proof exterior emulsion paint on wall
surface (two coats) to give an required shape even shade after
Rupees One Hundred Seventeen and
12 1660.00 thoroughly brushing the surface to remove all dirt, and remains of 117.40 sqmt
Paisa Forty Only
loose powdered materials.etc complete
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse
sand : 4- graded stone aggregates 20 mm nominal size) and curing Rupees Three Thousand Seven Hundred
complete excluding cost of formwork in (A) Foundation and Plinth Eighty Six and Paisa Forty Six Only
Brick work using common burnt clay building bricks having crushing
strength not less than 35 kg./Sq.Cm. in foundation and plinth in Rupees Four Thousand One Hundred
Cement Mortar 1:5. (1- Cement : 5 -fine sand)(B) Conventional Fifty Three and Paisa Six Only
Providing and fixing of Ridge flashing for roof panel shall be made
out of 0.5 mm thick pre coated GI sheet . The Precoated sheet shall
be of minimum 240 mpa steel grade confirming to IS 14246:1995
and shall have zinc coating of minimum 120 gsm as per
IS:277:1992 , 5-7 microns epoxy primer on both side of the sheet
and polyester top coat 15-18 micron. The PPGI Sheet shall have Rupees Eight Hundred Sixty Seven and
plastic protective guard film of minimum 25 microns to avoid Paisa Thirty Eight Only
scratches during transportation. The ridge shall be fixed to the
steel members by pop rivet or self drilling/self stitching fastners @
maximum 450 mm c/c along length of capping/flashing etc
Steel work, riveted in built up sections framed work
including cutting, hoisting, fixing in position and applying a Rupees Six Thousand Seven Hundred
priming coat of red lead paint. (D) In trussses and trussed Forty Seven and Paisa Eight Only
purlins, upto 25 M. span and 15 M ovarall height.
Quantitiy Estimated Rates Total Amount
Quantitiy Estimated Rates Total Amount
Estimated Item Of Work Unit may be more or
may be more In Figure In word less
Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as per
Rupees Seven Hundred Four and Paisa
17 628.00 approved design Confirming to IS 15658 : 2006 704.07 Sq.mt
including 35 mm Sand layer for levelling and filling the
joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete.
In Words :- Rupees Forty Nine Lakhs Twenty Three Thousand Four Hundred Eleven Only.
I/we am/are willing to carry out the work at………………………………………………….% above/below percent (should be written in figures and words) of the
estimated rates mentioned above. Amount of my/our tender works out as under :
Estimated amount put to tender
Add / deduct…………….% above / below
In words (Rupees………………………………..
All works shall be carried out as per Public Work Department Handbook and other specification of Division or as directed.
All the columns in Schedules should be filled in ink and the total of the entries ink last column should be struck by the contractor under his signature.
Rates quoted include clearance of site ( prior commencement of work and at its close ). In all respect and hold good for work under all condition, site,
Serviceable material available ( if any ) after Demolishing / Dismentalling any item should be hand over to the concerned PIU Site Engineer In Charge
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the costof difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender. Input rate is Rs. _____________ MT.
5 GST extra applicable in case of work based on SOR 2024-25 only.
Dy. Executive Engineer Divisional Accountant Executive Engineer
PIU Zone-7 Tapi PIU Zone-7 Surat PIU Zone-7 Tapi
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condition for cement.pdf
GR RnB Revise.pdf
GR-TMT-Lap Length.pdf
INSTRUCTIONS TO PERSON TENDERING.jpg
JPG
Performance Bond and SD-Paripatra-2023.pdf
PIU SPECIAL CONDITIONS.pdf
Inclusion of Insurance clause as per new SBD.pdf
6372 Make List HO 15.10.2025.pdf
Specification.pdf
Schedule B.pdf
SBD.pdf
Tender Document.pdf
Download all tender documents and submit your bid