Tender Value
₹8.3 L
EMD Value
₹8,304.58
Closing Date
16 Jun 2026, 6:00 pm
DY.CITY ENGINEER (SOUTH ZONE)
Work to construct CC pavements on frequently used pavements on different main roads in Isanpur ward, South Zone
312121
Tender Notice No.02 / 2026-27
Open
Civil - All
Ahmedabad
5 documents required · 5 mandatory
₹900
municipal commissioner
₹8,304.58
6 Jun 2026
6 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
7 45.00 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse 2,339.59 Cmt
sand : 6- Hand broken stone aggregates 40mm nominal size) and
curing complete.(R & B SOR Item code 05003A, NBO 5.3.2 Page 73)
Road Zonal tender 2022-23
8 - Providing, laying, spreading and compacting graded stone -
aggregate to wet mix macadam specification including premixing
the Material with water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in uniform layers in sub-
base / base course on well prepared surface and compacting with
vibratory roller to achieve the desired density as per Codal
Provision.(RA Approved St.Com.Res No.189,Dt.19/05/2022)Road
Zonal tender 2022-23
a 40.00 Production & Supply of WMM 1,708.13 Cmt
b 40.00 Laying of WMM 31.25 Cmt
9 3.00 Providing and Casting in situ ordinary cement concrete M200 for 3,672.30 Cmt
R.C.C. Raft and cutt off walls including necessary shuttering laying,
vibrating, ramming and curing complete.(B) Walls, fom top of
foundation level upto floor two level (upto 10ton). (As Per Auda
10 40.00 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb 350.89 Rmt
block for Footpath in M-20 grade using 20 mm nominal size black
trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork , mould with well
equipped with vibratory system for kerb stones of approved
design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and level on 5 cm
thick sand bedding with necessary equipments and materials. The
rate shall also include the flush pointing in CM (1:3) for all joints of
the kerbstones. Filling of zari alone the sides of the kerb stone
fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed for
production. (AMC approved Rate )a) Laying on 5 cm thick Sand
11 30.00 Providing and Laying of Rubber Moulded Paver Block 501.60 Smt
Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape
(Usually Bricks/ Uni-Paver Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath, parking areas,
service lanes and other areas as mentioned in the drawing /
instruction of engineer in charge. Cost includes formworks using
rubber mould, Rate providing and laying paver blocks as per
required grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall be
executed in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the paver block
to be necessary. if cutting of paver block necessary then it should
be cut by machine only and carting. The finished surface of the
paver block shall have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if necessary. Gravel or such
type of materials shall not be allowed for production. Laying on
5cms thick sand beddding.(AMC approved Rate )
12 25.00 Providing & Supplying JCB Machine on rental basis in case of 535.71 hr
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg.incharge, rate
includes all nece. shifting, fuel and operating charges and stacking
of useful & non-useful materials separately up to store. (No
payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work) (Based
on Previously approved rate by CE sir ) (AMC Drainage SOR-Jan-
13 15.00 Hiring of tractor with trolly considering 8 hours as working day 2,104.09 Shift
hours incl.driver (Based on GWSSB SOR 2022-23)
14 - Supplying, labour for break down repairing work for activities like -
excavation, disliting, removing debris from trench back filling etc.
comp. as directed by Eng.in charge.(As per Labour skill
devlopment & Employment Department Government of Gujarat,
Circular Dated 01-04-2023 Annexure Sr.No.6)
a 60.00 Mazdoor at day /Night 452.00 NO
B 20.00 Makadam/ supervision at day / Night 462.00 NO
15 70.00 Cement Concrete Pavement (Construction of M40 grade un- 6,050.00 cmt
reinforced, dowel jointed at construction joint, plain cement
concrete pavement over a prepared sub base with 43 grade
cement, coarse and fine aggregate conforming to IS 383, maximum
size of coarse aggregate not exceeding 25 mm, mixed in a batching
and mixing plant as per approved mix design, transported to site,
laid with a fixed form or slip form paver, spread, compacted and
finished in a continuous operation including providing of
construction joints, separation membrane (where DLC is done),
admixtures, tie bar, fibre mesh, curing compound, finishing to lines
and grades as per drawing. The White topping without fibre mesh
shall not be accepted. Item does not includes cost of dowel bars,
fibre mesh (PSFR) & cost of groove cutting & filling. It should be
paid separately. (A.M.C. SOR Rate Excluding GST)
16 575.00 Conveyance Charge of earth, lime, murrum, building rubbish, 78.54 Cmt
manure, garbage, sludge, excavated rock, fly ash, aggregates of
any kind executed outside the road site. Rate also includes
spreading & levelling etc complete. Internal conveyance above
mt done within the work site is not payable. 5 km to 10 km lead
17 190.00 Labour charge of Cutting in bituminous pavement Cutting to be 125.00 Rmt
done with heavy duty tandom cutting machine consist of diamond
blade. Minimum cutting depth shall be 75mm from the finished
level. Cutting shall be perfecty in line. The width and depth of the
removal of asphalt towards kerb stone shall be as per the drawing.
Bitumen shall be carefully removed so that the the cutting edge
towards the road should no be disturbed. The work of removal of
the asphalt will be considered in this item as running meter of the
cutting done by achine. One cutting line will be considered per
length of the kerb stone
Contractor’s Quoted Rate: -
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl. City Engineer
Date: (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
(107) CC Foot Path Tech Bid 17.03.26.pdf
(107) CC Foot Path Price Bid 17.03.26.pdf
Download all tender documents and submit your bid