| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.4 LAccepted-AOC PREMISES NO 02 0517 PLOT NO AAIIB 330 ACTION AREA IIB NEWTOWN NORTH 24 PGNS KOLKATA 700157 | 24 PARAGANAS NORTH | WEST BENGAL | 700157 | ₹65.4 L | L1 | Accepted-AOC Lowest offer given by Mukherjee Associates Infra Private Limited |
| 2 | L2₹68.8 LRejected-Finance MATRIMONGAL APARTMENT GROUND FLOOR 16 1 S B SARANI DURGANAGAR KOLKATA 700 065 | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | ₹68.8 L | L2 | Rejected-Finance Higher offer given |
| 3 | L3₹69.5 LRejected-Finance 557 DUM DUM PARK TANK NO 3 KOLKATA 700 055 | KOLKATA | KOLKATA | WEST BENGAL | 700055 | ₹69.5 L | L3 | Rejected-Finance Higher offer given |
| 4 | Not Admitted-Fee/PreQual/Technical VILL CHAYANPUR P O BOROI P S HARISHCHANDRAPUR MALDA | HARISHCHANDRAPUR | MALDA | WEST BENGAL | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹65.5 L
EMD Value
₹1.3 L
Closing Date
13 Feb 2026, 2:00 pmClosed
Addl. General Manager (Engg)-IV
HIDCO BHABAN
Repairing and Restoration of Existing Pedestrian Subway at 6th Rotary in New Town Kolkata.
2026_HIDCO_995325_1
HIDCO/AGM(E)IV/RT/NIT134/25-26
Open Tender
CIVIL WORKS
Percentage
30 days
NEW TOWN
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.3 L
9 Mar 2026
29 Jan 2026
16 Feb 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
Removing old scales, blisters etc. of interior surface of walls,ceiling by scraping etc. and preparing smooth and even surface with rendering or cement mortar (1:2) (as necessary), to make the surface suitable for receiving distemper. (Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge).
Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (a) One Coat ii) Solvent based interior grade Acrylic Primer
Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) : (Two coats) ii) Luxury Quality
(b) Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick)
(b) Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cement is required)
Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials, labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N:300 (longitudinal), 200 (transverse)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Supplying and laying true to line and level vitrified tiles of approved brand (size not less than 600 mm X 600 mm X 10mm thick) in floor, skirting etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry back side of tiles using cement @ 2.91Kg./sqM or using polymerised adhesive (6 mm thick layer applied directly over finished artificial stone floor/Mosaic etc without any backing course) laid after application slurry using 1.75Kg of cement per sqM below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles / epoxy grout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the manufacturer's specification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contractor) (I) With application slurry @1.75 kg/ Sq.m, 20 mm sand cement mortar (1:4) & 2 mm thick cement slurry at back side of tiles, 0.2 kg/Sq.m white cement for joint filling with pigment. (A) Deep Colour & White
Supplying Weather Silicone sealant of approved make and brand for fixing of grove line between the Glasses as per direction of Engineer-in charge. for Structural Glazing/Curtain wall.
(b) Supplying fitting and fixing in position 8 mm. to 12 mm. thick Dholpur slab in wall, dado making suitable arrangement to hold the stone properly with approved polymerised adhesives (6 mm thick) as per ISI specification including pointing with cement mortar (1:2) (1 cement: 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of Engineer-in-charge including cost of all materials, labour, scaffolding, staging, curing complete [using white cement for pointing @ 2.4 kg/Sq.m]. In ground floor
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (a) One Coat
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) b) Premium 100% Acrylic Emulsion
Supply Unskilled labour
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of cracks / porous concrete by injection process through nipples/Grouting complete as per Technical specification. A Cement Grout .
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. as per MORT&H specification (5th revision)
Applying epoxy mortar ( 10 mm nominal thick) over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification
Patching of damaged concrete surface with polymer concrete (25 mm nominal thick) and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Providing and fixing exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats and strainless Steel screws forming groves at the periphery of ACP panel. Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP) (a) 3mm thick (0.25mm Al.+2.5mm LDPE +0.25mm Al. PVDF coating)
Supplying, fitting & fixing of Aluminium fixed partion wall of all aluminium sections viz top, bottom and side member, intermediate member, glazing clip made of Aluminium Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, annodized conforming to IS:1868-1983, fitted with all other accessories viz. EPDM gusket,cleat, angle screws etc. including labour charges for fitting and fixing of aluminium fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge. (Excluding cost of glass/ panel board, 10-12 Micron thickness Annodizing film. Natural white. a) for unsupported length of vertical member upto 1.50m. height of both ends of vertical member restrained but panel with in 0.90 sqm
Suppling, fitting fixing of 350' boring work with all materials, labour and New 2 HP pump set including supply of labour all complete.
Labour for taking out rolling shutter (only shutter portion) dismantling by parts for repair or (replacement of damaged parts only), rehanging and refitting the same in position after necessary repairs (excluding the cost of supply of new parts).
Oiling and greasing of rolling shutter and repair to in side lock.
Add CGST @9% of total amount to Rs.5502481.17
Add SGST @9% of total amount to Rs.5502481.17
Add Construction Cess @1% of total amount to Rs.5502481.17
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_2435683.xls
BOQ • 0.40 MB
SPECIALTERMSANDCONDITION2.pdf
Tender Documents • 0.10 MB
2911_FORM.pdf
Tender Documents • 0.16 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].