Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.3 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹72.8 L+₹3.5 L (5.02%)Rejected-AOC | L2 | Rejected-AOC Second | |
| 3 | L3₹73.5 L+₹4.2 L (6.03%)Rejected-Finance | L3 | Rejected-Finance Third | |
| 4 | L4₹76.3 L+₹7.0 L (10.1%)Rejected-Finance | L4 | Rejected-Finance Fourth |
| Sl No | Description | Qty | Unit | Pradeepkumar.K L1 | M S HARIHARAKUMAR L3 | N VIJAYAN L4 | SEETHALAKSHMI V L2 |
|---|---|---|---|---|---|---|---|
| 1.00CIVIL | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 201.4 | cum | 320 ₹64,448 | 300 ₹60,420 Lowest | 350 ₹70,490 | 324 ₹65,253.6 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 140.98 | cum | 270 ₹38,064.6 | 250 ₹35,245 Lowest | 300 ₹42,294 | 287 ₹40,461.26 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 35.5 | cum | 7,100 ₹2,52,042.9 Lowest | 7,150 ₹2,53,817.85 | 7,800 ₹2,76,892.2 | 7,144 ₹2,53,604.86 |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 136.74 | cum | 650 ₹88,877.75 Lowest | 700 ₹95,714.5 | 700 ₹95,714.5 | 657 ₹89,834.9 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.01 | cum | 7,700 ₹77,069.3 Lowest | 7,750 ₹77,569.75 | 8,500 ₹85,076.5 | 7,717 ₹77,239.45 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 141.87 | sqm | 340 ₹48,234.44 Lowest | 350 ₹49,653.1 | 350 ₹49,653.1 | 348 ₹49,369.37 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 221.64 | sqm | 900 ₹1,99,476 Lowest | 950 ₹2,10,558 | 1,000 ₹2,21,640 | 908 ₹2,01,249.12 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 446.72 | sqm | 680 ₹3,03,769.6 Lowest | 685 ₹3,06,003.2 | 700 ₹3,12,704 | 687 ₹3,06,896.64 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 309.67 | sqm | 860 ₹2,66,313.62 Lowest | 900 ₹2,78,700.3 | 900 ₹2,78,700.3 | 866 ₹2,68,171.62 |
Tender Value
₹80.7 L
EMD Value
₹50,000
Closing Date
16 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Buildings Division, Alappuzha
GENERAL-Budget Work 2024-25 TTI Mavelikara-Budget work 2024-25 Construction of New Building for Govt. TTI Mavelikara - Phase 1-General Civil Work
2026_PWD_845825_1
PWD/BLDG/TR/16136/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
450 days
Alappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
25 Jun 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 201.4 | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 140.98 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 35.5 | cum | - | - |
| 1.004 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 136.74 | cum | - | - |
| 1.005 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.01 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 141.87 | sqm | - | - |
| 1.007 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 221.64 | sqm | - | - |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 446.72 | sqm | - | - |
| 1.009 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 309.67 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1428697.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
affi.pdf
Tender Documents • 0.02 MB
bis.pdf
Tender Documents • 0.56 MB
epay1.pdf
Tender Documents • 0.06 MB
PRI.pdf
Tender Documents • 0.26 MB
viewsbd.pdf
Tender Documents • 6.55 MB
BOQ_1428697.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .