Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹3.5 L Quoted ₹4.3 L | L1 | Accepted-AOC Work awarded |
| 2 | L2₹4.5 LRejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹4.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.7 LRejected-Finance V P O MILLAH TEHSIL SHILLAI DISTT SIRMOUR 173029 | SIRMAUR | HIMACHAL PRADESH | 173029 | ₹4.7 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT Conditions |
| Sl No | Description | Qty | Unit | Manohar Lal L1 | Kuldeep Singh L3 | Manoj Kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition above G.L upto floor two level including disposal of unserviceable materials within 20 mtrs lead and including cutting the necessary reinforcement and separating out from RCC/RB works AE residance and type-Il quaertrer Chajja | 1.3 | Cum | 6,500 ₹8,450 | 6,700 ₹8,710 | 6,600 ₹8,580 |
| 2.00 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | - | - | - | - | - |
| 2.01 | Flat surfaces such as soffits of suspended floor landings and the like up to 200mm thickness and to the entire satisfaction of the Engineer-in-charge. | 31.17 | Sqmt | 600 ₹18,702 | 650 ₹20,260.50 | 630 ₹19,637.10 |
| 2.02 | Edges of slabs and breaks in floors walls under 20 cmt wide and to the entire satisfaction of the Engineer-in-charge. (AE resideance and tyhpe-Il qtr Chajja) | 5.2 | Sqmt | 135 ₹702 | 140 ₹728 | 150 ₹780 |
| 3.00 | Providing and laying cement concrete 1:2:4 (1cement:2sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | - | - | - | - | - |
| 3.01 | Suspended floor roofs landing shelves and their supports balconies, beams girders bressumers and cantilevers up to floor two level | 7.89 | Cum | 11,000 ₹86,790 | 12,000 ₹94,680 | 11,500 ₹90,735 |
| 4.00 | Providing laying of tor steel reinforcement for RCC work including bending binding cutting and placing in position complete in all depths and heights and to the entire satisfaction of the Engineer-in-charge. | 471.6 | P/Kg | 110 ₹51,876 | 130 ₹61,308 | 120 ₹56,592 |
| 5.00 | Repair to paster in patches of 2.50 sqm and under and 10 to 15mm thick including cutting the patch in proper shape and replastering the surface of the wall including disposal of rubbish to the dumping ground with in a lead of 20 mtrs with cement mortar 1:4 (1cement: 4sand). | 219.36 | Sqmt | 440 ₹96,518.40 | 450 ₹98,712 | 450 ₹98,712 |
| 6.00 | Removing dry or oil bound distemper by washing and scraping and sand papering the wall surfaces smooth including necessasry repair to scratches complete | 573.04 | Sqmt | 25 ₹14,326 | 35 ₹20,056.40 | 30 ₹17,191.20 |
| 7.00 | Distempering (two coats) with oil bound washable distemper of approved brand and manufacture and of required shade on undercoated wall surfaces to give an even shade over and including a priming coat with distemper primer of approved brand and manufacture after throughly brushing the surface free from mortar dropping tnd other foreign matter and also including preparing the surface even and sand papered smooth | 573.04 | Sqmt | 165 ₹94,551.60 | 170 ₹97,416.80 | 170 ₹97,416.80 |
Tender Value
₹3.7 L
EMD Value
₹7,430
Closing Date
13 Apr 2026, 3:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH Repair and distempering and painting including removing old paint/distemper etc. of staff quarter building under Sub-Division Swarghat under PDNA)
2026_HPIPH_133303_1
NIT 636-735 Dated 02-04-2026
Open Tender
Repair and Maintenance Works
Shri Naina Devi Ji Distt Bilaspur HP
Please refer Tender documents.
3 documents required · 3 mandatory
₹350
Yes
₹7,430
Yes
25 Jun 2026
4 Apr 2026
13 Apr 2026
4 Apr 2026
13 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolition above G.L upto floor two level including disposal of unserviceable materials within 20 mtrs lead and including cutting the necessary reinforcement and separating out from RCC/RB works AE residance and type-Il quaertrer Chajja | |||||
| 2Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | |||||
| 2.01 | Flat surfaces such as soffits of suspended floor landings and the like up to 200mm thickness and to the entire satisfaction of the Engineer-in-charge. | - | Sqmt | - | - |
| 2.02 | Edges of slabs and breaks in floors walls under 20 cmt wide and to the entire satisfaction of the Engineer-in-charge. (AE resideance and tyhpe-Il qtr Chajja) | - | Sqmt | - | - |
| 3Providing and laying cement concrete 1:2:4 (1cement:2sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | |||||
| 3.01 | Suspended floor roofs landing shelves and their supports balconies, beams girders bressumers and cantilevers up to floor two level | - | Cum | - | - |
| 4Providing laying of tor steel reinforcement for RCC work including bending binding cutting and placing in position complete in all depths and heights and to the entire satisfaction of the Engineer-in-charge. | |||||
| 5Repair to paster in patches of 2.50 sqm and under and 10 to 15mm thick including cutting the patch in proper shape and replastering the surface of the wall including disposal of rubbish to the dumping ground with in a lead of 20 mtrs with cement mortar 1:4 (1cement: 4sand). | |||||
| 6Removing dry or oil bound distemper by washing and scraping and sand papering the wall surfaces smooth including necessasry repair to scratches complete | |||||
| 7Distempering (two coats) with oil bound washable distemper of approved brand and manufacture and of required shade on undercoated wall surfaces to give an even shade over and including a priming coat with distemper primer of approved brand and manufacture after throughly brushing the surface free from mortar dropping tnd other foreign matter and also including preparing the surface even and sand papered smooth | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
PWD6.pdf
Tender Documents • 0.68 MB
PWD8.pdf
Tender Documents • 1.32 MB
TC.pdf
Tender Documents • 0.39 MB
BOQ_197127.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid