Tender Value
₹25.2 L
EMD Value
₹50,480
Closing Date
5 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction of an RCC drain from the rear corner of the pond to the Katha factory in Ward-19, Kanjadaspur.
2026_DOLBU_1196653_1
31/CE/CD/26-27 (1 To 4) Sr No 1 Tender List 34 Date-14.10.2026
Open Tender
Civil Works
Percentage
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
₹50,480
16 Oct 2026
16 Oct 2026
5 Nov 2026
16 Oct 2026
5 Nov 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in foundation in soil mixed with Morrum/ shingle/kanker/ foul requiring the use of special T&P such as pickaxe, subbles etc. (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches, excluding royalty. (S.1. No. 252 | 143 | CUM | 240 | ₹34,320 |
| 1.02 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated carth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches, excluding royalty. (S.I. No.251) | 195 | CUM | 209 | ₹40,755 |
| 1.03 | Cartage upto 5.00km for disposing of malba | 265.2 | CUM | 183.5 | ₹48,664.2 |
| 1.04 | Providing and laying cement concrete in 1:4:8 (1 cement: 4 C sand 8 stone ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/1. | 17.55 | CUM | 7,125 | ₹1,25,043.75 |
| 1.05 | R.C.C. work with cement, approved coarse sand and 4cm gauge stone ballast in proportions of 1:2:4 in raft and foundation excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour ,tools & plants etc required for proper completion of work. Binding wire cost being included in the item, (S.I.No.287) | 27.63 | CUM | 8,173 | ₹2,25,819.99 |
| 1.06 | RCC work with coment.approved course sand and 4cm gange stone ballast proportions of 1:15:3 in wall and olouten excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 KWG 0.1 wine and including necessary contring and shuttering etc and also including supply of all materials labour tools & plants enc required for proper completion completion of work work Binding wire cost being included in the item. (S.L.No. 289) | 58.5 | CUM | 8,976 | ₹5,25,096 |
| 1.07 | RCC 1:2:4 with cement c'xand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284 | 14.92 | CUM | 8,451 | ₹1,26,088.92 |
| 1.08 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 118.99 | QTL | 8,754 | ₹10,41,638.46 |
| 1.09 | Fabrication of Mild steel or iron work of grill and stair case railling (When not included in an overall rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts and wastage etc. and there fixing if required for proper completion of work.(S.I.No.502c) | 4.97 | QTL | 8,450 | ₹41,996.5 |
| 1.1 | Close Tunbering in trenches including struting, shoring and packing cavities (Wherever required) complete (Measurments to be taken of the face of area timbered) | 234 | SQM | 142 | ₹33,228 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.36 MB
BOQ_2260775.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .