Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-Finance | ₹9.5 L | L1 | Accepted-Finance As per L1 basis |
| 2 | L2₹11.6 LRejected-Finance | ₹11.6 L | L2 | Rejected-Finance As per L1 basis |
| Sl No | Description | Qty | Unit | M/S GAONKAR CONSTRUCTIONS L1 | DNYANESHWAR S. PARAB L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excvacated soil as directed within a lead of 50m.
a) All kinds of soil | 1,427 | cum | 232.8 ₹3.3 L | 320 ₹4.6 L |
| 2.00 | Transportation & carriage of materials by Tipper Truck including laoding unloading stacking at site etc.
(ii) Earth upto 5 KM | 1,244 | cum | 201.8 ₹2.5 L | 250 ₹3.1 L |
| 3.00 | Providing & Laying cement concrete 1:2:4 (1 cement: 2 Coarse Sand: 4 graded granitic or basaltic stone aggrt. 20mm nominal size) excluding cost of centering, shuttering and finishing in:
a) All works upto plinth level | 39 | cum | 5,448.06 ₹2.1 L | 6,200 ₹2.4 L |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
a) Foundations, footings, bases for columns and mass concrete. | 60 | sqm | 325.47 ₹19,528.20 | 320 ₹19,200 |
| 5.00 | Laterite boulder masonary in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate of 40mm nominal size) in foundation | 45 | cum | 3,045.14 ₹1.4 L | 3,000 ₹1.4 L |
Tender Value
₹14.0 L
EMD Value
₹28,092
Closing Date
16 Oct 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Construction of Protection Wall and Improvement of nallah at Kelawade V.P. Querim of Poriem Constituency in Sattari Taluka. II Call
2025_WRD_24995_1
No.WRD/WDVI/PB/F.30/TN e 27/2025-26/501 Line 15 Dated 24 /09 /
Open Tender
Civil Works - Water Works
30 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹28,092
19 May 2026
7 Oct 2025
17 Oct 2025
7 Oct 2025
16 Oct 2025
7 Oct 2025
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excvacated soil as directed within a lead of 50m. a) All kinds of soil
Transportation & carriage of materials by Tipper Truck including laoding unloading stacking at site etc. (ii) Earth upto 5 KM
Providing & Laying cement concrete 1:2:4 (1 cement: 2 Coarse Sand: 4 graded granitic or basaltic stone aggrt. 20mm nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formworks for: a) Foundations, footings, bases for columns and mass concrete.
Laterite boulder masonary in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate of 40mm nominal size) in foundation
DNYANESHWAR S. PARAB (BID ID -53921)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.86 MB
BOQ_25421.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid