Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹31.8 L
EMD Value
₹31,900
Closing Date
1 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
O/o Superintending Engineer ,Rengali dam Division
Black Toping to Dam Approach Road from NH to Sambalpur Chhak at Rengali Dam Site
2026_CEBBS_146904_7
SE-RDD-07/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
SE, RDD, Rengali Dam Site
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹31,900
Yes
21 Nov 2026
21 Nov 2026
2 Dec 2026
21 Nov 2026
1 Dec 2026
21 Nov 2026
21 Nov 2026 - 26 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the existing black topped surface with removal of foreign materials with broom or soft brushes and finally dusting with old gunny bags and/ or compressed air to receive bituminous treatment including cost of all materials required for the work etc. complete as per the direction of the Engineer in-charge. | 7,425.04 | Sqm | 5.7 | ₹42,322.73 |
| 2 | Providing and Laying spreading and compacting stone aggregates of specific size to WBM specification including spreading in uniform thicknees and hand packing rolling with three wheeled steel roller 8-10ton in stage to proper grade and camber,applying and brooming requisite type of screening/ binding materials to fillup the interstices of coarse aggregates, watering and compacting to the required density as per Clause 404 of MoSRTH Specification for road and bridge work (4th revision) including cost of all materials labour T&P taxes royalty cess etc complete as per the direction of Engineer-in- Charge. | 1.23 | Cum | 2,971.14 | ₹3,654.5 |
| 3 | Cleaning the existing granular base surface including removal of binding materials and other foreign materials with wire brushes and small picks,sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous. | 12.08 | Sqm | 20.5 | ₹247.64 |
| 4 | Providing and laying all material,labour,T&P for surface dressing with 12kg penetration grade of bitumen and 0.15cum of 12mm nominal size chips per 10sqm and rolling with PRR including hire and running charges of PRR including all materials,conveyance royatl cess etc complete as per the direction of the Engineer-in-Charge.(To bring finishing area and undulsation surface over which primix carpet will be provided) | 12.08 | Sqm | 198.1 | ₹2,393.05 |
| 5 | Providing, laying 20mm thick premix carpet using 0.27cum of 13.2mm to 5.6mm size crused stone chipping and 14.6kg. penetration grade for 10 sqm including hand packing to proper camber and consolidation with PRR, hot mix plant, tar boilers and all other T & P articles including cost and conveyance of chips and bitumen complete as per specification and direction of Engineer-in-charge. | 7,437.12 | Sqm | 271.1 | ₹20,16,203.23 |
| 6 | Providing, laying 6mm thick precoted seal coat Type-B using 0.06cum of 6.7mm size chips as per sieve analysis and 6.8kg. of bitumen per 10 sqm including hire and running charges of PRR, hot mix plant, tar boilers and all other T & P articles including cost and conveyance of chips and bitumen complete as per specification and direction of Engineer-in-charge. | 7,437.12 | Sqm | 115.3 | ₹8,57,499.94 |
| 7 | Binding road surface with sand 6mm thick sand including cost and conveyance of sand etc. complete as per specification and direction of Engineer-in-charge for 100Sqm. | 7,437.12 | Sqm | 4.7 | ₹34,954.46 |
| 8 | Providing and laying tack coat on normal bituminous base @ 0.2Kg/sqm including cost conveyance, royalty, taxes of all materials etc complete. | 7,437.12 | Sqm | 30.5 | ₹2,26,832.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
DTCNroad.pdf
Tender Documents • 14.47 MB
BOQ_622755.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .