Loading…
Loading…
4 results • Latest
Canal embankment service road
Excavation for foundation by mechanical / manual means in all kinds of soil including stoney earth,gravel and moorum etc in both wet / dry and submerged condition as per drawing and specification including rough dressing, levelling the foundation bed including shoring, shuttering & dewatering if required, stoney earth, gravel and moorum etc interspread with boulder upto 1/2 Cum size and disposing the excess earth away from work site with all leads, lifts & delifts including cost of labour, T&P with all cost of incidental charges and Cess etc. complete as per drawing, specification and direction of Engineer-in-Charge.
Canal improvement
Excavation for foundation by mechanical / manual means in all kinds of soil including stoney earth,gravel and moorum etc in both wet / dry and submerged condition as per drawing and specification including rough dressing, levelling the foundation bed including shoring, shuttering & dewatering if required, stoney earth, gravel and moorum etc interspread with boulder upto 1/2 Cum size and disposing the excess earth away from work site with all leads, lifts & delifts including cost of labour, T&P with all cost of incidental charges and Cess etc. complete as per drawing, specification and direction of Engineer-in-Charge.
Canal improvement
Clearing grass and removal of rubbish up to adistance of 50M out side periphery of the area including cost of labour T&P, Cess, with all leads, lifts, delifts etc. complete as per specification and direction of the Engineer-in-Charge.
Replacement of dewatering pipe line of foundation Gallery at Rengali Dam Site
Dismantling MS/CI/GI/PVC pipe including taking out the pipes manually or by mechanical means, breaking joints including stacking of pipes and lead upto within 1Km including all taxes labour T&P cess etc. complete but excluding GST or as per the direction of Engineer in Charge