Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 888 TVS TOLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
10 Oct 2022, 4:00 pmClosed
Block Development Office VP Manikandam
Block Development Office VP Manikandam
Formation of baby pond andInlet ,Outlet Channel with Cement Bench at Vaiyathan kuttai in N.Kuttapattu Panchayat in Manikandam Block in Tiruchirappalli District under AGAMT II Scheme 2021-2022
2022_RDTN_252974_1
A4/0811/2022 Dated 22.09.2022
Open Tender
Civil Works - Others
Item Rate
90 days
Manikandam
Refer Tender Document
5 documents required · 5 mandatory
₹0
₹17,000
Yes
13 Oct 2022
22 Sept 2022
10 Oct 2022
22 Sept 2022
10 Oct 2022
22 Sept 2022
Amount
Formation of baby pond andInlet ,Outlet Channel with Cement Bench at Vaiyathan kuttai in N.Kuttapattu Panchayat Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B
Construction of Bathing Ghat Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Supplying and filling Sand in foundation and basement with Excavated earth complete complying to standard specification
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Cement concrete in C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Construction of Baby Pond Lining wall Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Supplying and filling Sand in foundation and basement with Excavated earth complete complying to standard specification
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Cement concrete in C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Cement concrete in C M 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Construction of Inlet Channal Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Supplying and filling Sand in foundation and basement with Excavated earth complete complying to standard specification
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Cement concrete in C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Sitting Bench Arrangement
Provison For Steel Street Light Pole 3 Meter Heigth & LED Light With Wiring with2*1.5 mm2 (22/.3) pvc insulated unsheathed sc Cu . Conductor of 1100 v grade in suitable PVC ridged pipe & Fixing Labour Charges Ect..,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R VELLAISAMY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .