| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L Quoted ₹9.2 L | L1 | Accepted-AOC Allotment Issued on 16-06-2026 vide alltoment No. EE/PMGSY/1387-91. |
| 2 | L2₹9.2 L+₹3,697.06 (0.40%)Rejected-Finance | ₹9.2 L+₹3,697.06 (0.40%) | L2 | Rejected-Finance Higher Bid |
Tender Value
₹10.9 L
EMD Value
₹22,000
Closing Date
25 May 2026, 6:55 pmClosed
Executive Engineer PMGSY Divison Ganderbal
Duderhama Ganderbal
Restoration of road Saidpora to Sangam via Shunglipora Package No JK13-136 damaged due to construction of Deep Drain by UEED Department.
2026_KSRRD_147683_1
NIT No. 03/EE/PMGSY/GBL/E-Tendering of 2026-27 Dated 18/05/2026
Open Tender
Civil Works - Roads
Percentage
20 days
Ganderbal
Please refer Tender documents.
7 documents required · 7 mandatory
₹600
Executive Engineer PMGSY Ganderbal
₹22,000
25 Jun 2026
18 May 2026
26 May 2026
19 May 2026
25 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches (not exceeding 1.5 m in width)including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of excavated material to the dumping site as designated by the Engineer- in Charge (complete Job) including loading,unloaduing,Haulages & all types of carriages of materials involved | 660.8 | CuM | 225 | ₹1,48,680 |
| 2 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (using naturally occuring gravel) including loading,unloaduing,Haulages & all types of carriages of materials involved, finished work to be measured | 216 | CuM | 817.34 | ₹1,76,545.44 |
| 3 | Stone Boulders:- providing /Laying of stone boulders of uniform size including all carriages from approved sources to the site of work , stacking, ramming etc loading, unloading and octori (finished work to be measured). | 460.8 | CuM | 1,300 | ₹5,99,040 |
| 4 | Total Construction cost without GST | 1 | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_230503.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .