Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
29 Jul 2026, 6:00 pm3d left
EXEN REW BARAMULLA
Baramulla
C/o 02 no. of Latrines Bathrooms near Immambada Jadeed at w-6 Daslipora,Under ADP/PRI, FY-2026-27,Halqa -Duslipora,Block- Singhpora
2026_RDPR_315905_35
105/Xen/Rew/Bla/2026-27 Dated 14/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,000
14 Jul 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes,
cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed | 1 | Cum | 1 | ₹1 |
| 2 | P/L of dry Stone soling duely hand packed hand rammed incl all carraiges incl 100m headload | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excl. the cost of centring and shuttering. all work upto plinth level with 1:4:8(1 cement :4 coarse sand : 8 graded stone aggregate 20 mm nominal size) all complete | - | Cum | 1 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excl. the cost of centring and shuttering. all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) all complete | - | Cum | - | - |
| 5 | Brick work with FPS bricks of class designation 75 in super structure in cement Mortar 1:6 | - | Cum | - | - |
| 6 | Extra for brick work in super structure above plinth lavel upto floor v level | - | Cum | - | - |
| 7 | Centering and shuttering incl. strutting propping etc including removal of formwork, all carriages complete | - | Sqm | - | - |
| 8 | Centering and shuttering incl. strutting propping etc including removal of formwork, all carriages complete | 1 | Sqm | - | - |
| 9 | Providing and laying in position reinformced cement concrete of specified grade including curing but excl. the cost of centring and shuttering. all work upto plinth level with 1:1/2:3(1 cement : 1/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) all complete | - | Cum | - | - |
| 10 | Steel Reinformcemnet for RCC worl Including Cutting, Bending, Biding Complete Job | - | qntls | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1027207.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].