| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | ₹2.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.8 LAccepted-Finance | ₹2.8 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | PAULSON.K.T L1 | BENNY K T L2 |
|---|---|---|---|---|---|
| 1.00Rectification work in LBM canal between ch.12/746km to 12/766 km | |||||
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 8 | metre | 1,348 ₹10,784 | 1,545.71 ₹12,365.68 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 1.5 | cum | 1,477 ₹2,215.50 | 1,694.32 ₹2,541.48 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 15.2 | cum | 720 ₹10,944 | 825.69 ₹12,550.49 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10.9 | cum | 244 ₹2,659.60 | 280.81 ₹3,060.83 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 9.12 | cum | 1,630 ₹14,865.60 | 1,870.3 ₹17,057.14 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 13.13 | cum | 3,796 ₹49,841.48 | 4,352.87 ₹57,153.18 |
| 1.01 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 15.4 | cum | 2,820 ₹43,428 | 3,234.23 ₹49,807.14 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 59.35 | sqm | 367 ₹21,781.45 | 420.91 ₹24,981.01 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.15 | cum | 8,780 ₹18,877 | 10,067.2 ₹21,644.48 |
Tender Value
₹2.5 L
EMD Value
₹6,331
Closing Date
4 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer,Irriga Subdiv2
Assistant Executive Engineer,Irriga Subdiv2
Rectification of canal
2026_Irrig_847179_3
IRR/PII/TR/6917/2025_5_1_1/1
Open Tender
Civil Works - Canal
90 days
koratty
Please refer Tender documents.
9 documents required · 9 mandatory
₹560
Yes
₹6,331
Yes
6 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
29 May 2026 - 4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Rectification work in LBM canal between ch.12/746km to 12/766 km | ||||||
| 1.001 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | - | metre | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | - | cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1441931.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
AFFIDAVIT6917.pdf
Tender Documents • 0.50 MB
epayment.pdf
Tender Documents • 0.01 MB
BOQ_1441931.xls
BOQ • 0.31 MB
PRELIMINARYAGREEMENT6917.pdf
Tender Documents • 0.65 MB
formsanddeclarations6917.pdf
Tender Documents • 0.58 MB
integritypact6917.pdf
Tender Documents • 0.48 MB
bid6917.pdf
Tender Documents • 1.66 MB
nit6917.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid