Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
6 Oct 2026, 5:30 pm
MS PRIYANKA SHARMA(DFLT)
CHIEF ENGINEER ( TENDER CELL)
NIT 1198 Construction& Maintenanc Road Under MMGSVY PKG No MMGSY-BSP-18, District-Bilaspur
199805
NIT 1198 Construction& Maintenanc Road Under MMGSVY PKG No MMGSY-BSP-18, District-Bilaspur
RESTRICTED TENDER
WORKS
PERCENTAGE
12 days
CHIEF ENGINEER ( TENDER CELL)
Required Past Technical Experience: As per Tender document
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Panchayat and Rural Development (PARD)
WORKS
MS PRIYANKA SHARMA(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B
CHIEF ENGINEER ( TENDER CELL)
TENDER CELL
CGRRDA RAIPUR
120
12
No
1
199805
6 Oct, 2026 5:30:00 PM IST
9 Oct, 2026 5:40:46 PM IST
21 Sep, 2026 5:30:00 PM IST
NIT 1198 Construction& Maintenanc Road Under MMGSVY PKG No MMGSY-BSP-18, District-Bilaspur
NIT 1198 Construction& Maintenanc Road Under MMGSVY PKG No MMGSY-BSP-18, District-Bilaspur
451000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
45074000.00
2
9 Oct, 2026 5:30:54 PM IST
45074000
AS PER NIT
AS PER NIT
As per Tender document
5000.00 INR
15d 1h 21m
15 documents required · 15 mandatory
₹5,000
₹4.5 L
21 Sept 2026
21 Sept 2026
9 Oct 2026
21 Sept 2026
9 Oct 2026
Name of road :- #REF! T05 To Lohadiya
Length of road:- #REF! Km
District :- #REF!
Sakari Pendri road
Kathakoni Sagar Road
Chhattisgarh Rural Road Devlopment Agency
Project Implimentation Unit - Bilaspur
District - Bilaspur (C.G.)
Detailed Project Report
Road Proposed in PMGSY-III Year 2019-20
1. Name of Road - Rajpur Sidhbaba road
2. Block - Thakatpur
3. Length of Road - Km
4. Cost of Project - Lakhs
Consultant Executive Engineer
NAME OF ROAD Bansjor Gwarghotri To Semipali khurd
LENGTH OF ROAD 1.86 Km BT(Km) 1.02 CC(Km) 0.84
BLOCK :- Dharamjaygarh DISTRICT:- Raigarh
Flexible Cost 48.13 Lakhs
Rigid Pavement Cost 50.10 Lakhs
Cost Of CD Work 6.93 Lakhs
Protection Works 0.00 Lakhs
Total construction Cost 105.16 Lakhs 431.000
Total Maintenance. Cost 7.63 Lakhs
GST Cost (18%) 16.21 Lakhs
1% Contengency 0.82 Lakhs 510.42
MGNREGA Cost 0.00 Lakhs
DPR Preparation & other work 0.00 Lakhs
Grand total Cost 129.82 Lakhs
GRAND TOTAL COST (Rs.) #VALUE! Lakhs
Executive Engineer
Rural Development Division,
CGRRDA , Raigarh
GENERAL ABSTRACT
Name Of Road :- Bansjor Gwarghotri To Semipali khurd
Vidhan Sabha :- B.T. 1.02 K.M.
Block:- Dharamjaygarh C.C 0.84 K.M.
Total Length:- 1.86KM Existing Road Length K.M.
S.No. Particular Of Work Quantity Unit Amount Per Km Cost (in lakhs) Remark
Part A MGNREGA Work cost 0.00
Part B Construction
1 Site Clearance & Setting Out 0.54
3 Profile Correction CUM
4 Subgrade 0.00 CUM 0.00
5 Other earth work item 0.00
6 Flexible Pavement (Crust & Shoulder) 1.02 KM 24.84
7 Rigid Pavement (Crust & Shoulder) 0.84 KM 36.37
8 Drain along with Flexible Pavement 0.27 KM 2.32
9 CC Drain along with Rigid Pavement 0.7 KM 6.00
Protection Cost
10 Retaining Wall 0.00 KM 0.00
11 Toe Wall 0.00 KM 0.00
12 Pitching ,etc 0.00 KM 0.00
13 Field Crossing 6 NO 1.80
14 Road Furniture 3.63
15 Speed Breakers
16 C.D. Work NO
I HPC 1 x 1000 mm dia 0 NO 0.00
II 1.50 mt Span Slab Culvert 1 NO 6.93
III 2.00 mt Span Slab Culvert 0 NO 0.00
IV 3.00 mt Span Slab Culvert 0 NO 0.00
V 4.00 mt Span Slab Culvert 0 NO 0.00
VI 5.00 mt Span Slab Culvert 0 NO 0.00
VII 6.00 mt Span Slab Culvert 0 NO 0.00
VIII 2x6.00 mt Span Slab Culvert 0 NO
Total-Cost of CD 6.93
(A) Cost of Part B 82.42
(B) 18 % GST On Cost of Part B 14.84
(C) Total Cost Part B 97.26
Part C Maintenance Part
(D) Maintenance For Five Year @ 4.10 lacs/km 7.63
(E) 18 % GST On Maintenance 1.37
(F) Maintenance Cost Including GST 9.00
Total Cost [Construction+Maintenance{ (C)+(F)}] 106.26
Part D DPR Consultancy charges,utility shifting & other Non SOR Item 0.00
Part E 1% Contigency only on cost part B(excluding GST) 0.82
Total Cost Of DPR {Part A+Part B+Part C+PartD+PartE} 107.08 57.57 Lakhs 533.16
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , CGRRDA , Raigarh CGRRDA , Raigarh Traffic Design Traffic Design
MUKHAYA MANTRI GRAM SADAK YOJANA
DETAILED COST ESTIMATE
Name of Road - Bansjor Gwarghotri To Semipali khurd
Length of Road:- 1.86 Km Dist. :- Raigarh
Block :- Dharamjaygarh
Sr. no SSR I.No. Description of Item No. Length Width Thicknes Qnty. Unit Rate(Rs) Amount
(A) Flexible Pavement
1 2.1 Setting out :- Setting out work complete wiyh construction of bench mark ( min 1 / km ), working bench mark ( min 4/km ) and near all bridges & CD works made of bricks/ stone masonary or concrete and reference pillars made of Precast concrete poles/ concrete filled 100 mmdia AC pipe @ 100 m interval of as required on both sides of the formation width , marking on central line , setting out curves and recording of central line levels and other required levels and distance etc. including setting out of CD & bridges with required reference pillars and marking etc. as directed by Engineer - in - charge 1 1.860 1.860 km 14968.00 27840.48
2 2.3 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(A) In area of non throny jungle 2 1860.00 1.00 3720.00 sqm 5.00 18600.00
3 2.2 Clearing Grass and Removal of Rubbish: Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. 2 1860.00 2.00 7440.00 sqm 1.00 7440.00
2 2.14 Removal of Telephone/Electric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202. 0 0.00 Nos 20125.00 0.00
3.1 Scarifying Existing Granular Surface to a Depth of 50 mm Scarifying existing granular/bituminous surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. ( Rd 2100 to 4100 m ) 2000 2.8 0 sqm 15.00 0.00
2 3.2 Compacting original ground / Existing Embankement (i)Compacting original ground supporting embankement/subgrade Loosing , levelling and compacting original ground supporting embankement / subgrade to facilitate placement of first layer of embankement , scarified to a depth of 150 mm mixed with water at OMC and then compacted by compacted by rolling to achieve minimum dry density as given in table 300.1 and 300.2 for embankement construction as per Technical Specification Clause 301.4.1 1020 8.78 0.15 0.00 Cum 21.00 0.00 2460
3 2.10(A) Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202 (A) Upto 600 mm dia Hume pipe - 7.5 0.0 Rmt 164.00 0.00
4 2.10 (B) (B) above 600 mm to 900 mm dia Hume pipe 7.5 0.0 Rmt 222.00 0.00
4 2.10 (C ) Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202(C) above 900 mm dia Hume pipe - Rd 203 , 371 7.5 0.0 Rmt 380.00 0.00
8 2.6 ( A) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202
(A )Lime Concrete
2.6 (B) (B)Cement Concrete
2.6 (C) (C))Reinforced Cement Concrete
6 2.8(A) Dismentling of Stone masonary as per Technical Specification clause 202 Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of stone masonry i/c of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A) Rubble Stone masonary in lime / cement/ mud mortar
Abutment 5.0 0.40 1.8 0.00
Abutment 7.5 0.80 3.0 0.00
Abutment 7.5 0.80 2.9 0.00
7 2.11 Dismantling of Cement Concrete Pavements Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202 Rd 0 to 200 m & 2365 to 2600 435 3.5 0.15 0.00 cum 1680.00 0.00
3 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3
as per earth work calculation statement 0.00
For Field crossing - 300 mm dia. 10.00 0.80 0.8 0.00
For Field crossing - 600 mm dia. 10.00 1.10 1.2 0.00
8.3(iv) Earthwork in Hill Road
(iv) Excavation in Hilly Areas in Ordinary Rock by mechanicalmeans not requiring blasting Excavation in hilly area in ordinary rock not requiring blasting bymechanical means including cutting and trimming of slopes anddisposal of cut material with a lift upto 1.5 m and lead upto 20 mas per Clause 1603.2.( as per earth work calculation statement ) Cu.m 133.00 0.00
11 8.3(iv) Earthwork in Hill Road
(v) Excavation in Hilly Areas in Hard Rock requiring blasting A) Excavation in hilly areas in hard rock requiring blasting, bymechanical means, lift upto 1.5 m and disposal ofexcavated rock upto a lead of 20 m as per Clause 1603.2.( as per earth work calculation statement ) 0.00 cum 758.00 0.00
4 3.3(i) Construction of embankment with material obtained from roadway cutting:--a.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 ( as per earth work calculation statement ) Cu.m 55.00
9 3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 ( As per eartwork calculation sheet ) As Per Earth Work Calculation ( - 0) 0.000 Cu.m 170.00 0.00 985.88
5 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR not less than 10%) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
For Exi. CC Road Rd 2430 to 2540 m 0 0.9 0.2 0
6 3.12(a) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. 1020 0 0.00
Qty required in CC road section ( as per calculation sheet)
Earthen Shoulders side of GSB - avg width (2.365+2.065)/2= 2.215 m 2 1020 2.215 0.150 677.79
7 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Side of WMM & BT (170 mm) - avg width ( 1.875+2.215)/2= 2.045 m 2 1020 2.045 0.170 709.206 Cu.m 200.00 141841.20
6 3.8(i) Surface drain in soil- Construction of unlined surface drains of average cross section 0.4 sqm in soil to specified lines , grades , levels and dimension . Excavated material to be used in embankement with a lift upto 3 m and lead of 50 m ( average lead 25 m ) as per Technical Specification Clause 307 Rd 1320 to 1710 L/S & 1520 to 1860 R/S 1 730 730.00 Rmt 63.00 45990.00
7 4.1 (a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Deduct Exisisting WBM Rd 2100 to 4100 2000 2.8 0.15 0.00
Camber Correction 1660 1.5 0.05 0.00
Extra widening at Junction Rd 0 1 10 3.75 0.15 5.63
Extra widening at Junction Rd 1260m( 50 mt) 50 3.75 0.15 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 150 3.75 0.15 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 15 3.75 0.15 0.00
Extra Widining at Structure 1 6.15 2.95 0.150 2.72
For CC Road - Rd 1770 to 2120 m
Extra Widining ( As per Curve design ) 1 0.00 0.15 0.00
19 4.8 Wet Mix Macadam :- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Deduct Exisisting WBM Rd 2100 to 4100 0.15 0.000
Camber Correction 0.15 0.000
Extra widening at Junction Rd 0 1 10 3.75 0.15 5.625
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.15 0.000
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.15 0.000
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.15 0.000
Extra Widining at Structure 1 6 2.95 0.15 2.721
Extra Widining ( As per Curve design ) 1 0.00 0.15 0.000
8 4.7(2) WBM Grading 2:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.Rd 0 to 1700 m 1 1020 3.85 0.00
Extra Widining at Structure 1 6.15 2.95 0.00
Extra widening at Junction Rd 0 1 10 3.75 0.00
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( As per Curve design ) 1 0.00 0 0.00
9 4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) Rd 0 to 1700 m
Grading No. 3 material 53mm To 22.4mm 1 1020 3.75 0.00
Extra Widining at Structure 1 6.15 2.95 0.00
Extra widening at Junction Rd 0 1 10.0 3.75 0.00
Extra widening at Junction Rd 1260m( 50 mt) 0 50.0 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150.0 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15.0 3.75 0.00
Extra Widining ( As per Curve design ) 1 0.00 0.00
10 5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502Rd 1 1020 3.75 3825.00
Extra Widining at Structure 1 6.15 2.95 18.14
Extra widening at Junction Rd 0 1 10.0 3.75 37.50
Extra widening at Junction Rd 1260m( 50 mt) 0 50.0 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150.0 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15.0 3.75 0.00
Extra Widining ( As per Curve design ) 1 0.00 0.00
11 5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 1 1020 3.75 3825.00
Rd 200 to 320 m (over ext. CC Road ) 120 3.75 0.00
Extra Widining at Structure 1 6.15 2.95 18.14
Extra widening at Junction Rd 0 1 10 3.75 37.50
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( As per Curve design ) 1 0.00 0.00
12 5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006
Rd 200 to 320 m (over ext. CC Road ) 0 120 3.75 0.00
Extra Widining at Structure 1 6.15 2.95 18.14
Extra widening at Junction Rd 0 1 10 3.75 37.50
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( As per Curve design ) 1 0.00 0.00
13 5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B
Rd 200 to 320 m (over ext. CC Road ) 0 120 3.75 0.00
Extra Widining at Structure 1 6.15 2.95 18.14
Extra widening at Junction Rd 0 1 10 3.75 37.50
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( As per Curve design ) 1 0.00 0.00
16 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge.
For CC Drain along with Flexiable pavement (Rd 1050 to 1200 L/S & 1080 to 1200 R/S) 1 270 0.70 0.15 28.35
For CC Drain along with Flexiable pavement (Rd 1050 to 1200 L/S & 1080 to 1200 R/S) 2 270 0.40 0.15 32.40
Casing around pipe at Rd 1310 , 1428 , 1575 6.5 1.53 1.38 0.00
Deduction for pipe 6.5 0.785 1.5129 0.00
For Speed Breaker ( Detail estimate attech seperately ) Rd 520 , 580 m 0 no 22547.00 0.00
Total of (A) Flexible Pavement 2769217.11
( B) Rigid Pavement
1 4.1 (a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Approach at Rd1540 m 150 3.00 0.15 0.00
6.7 Cement Concrete cell fill Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 Rd 2600 to 2770 170 3.75 0.10 0.00 cum 5836 0.00
13 6.1(ii) Cement Concrete Pavement (ii) Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Widening at junction at Rd 0 1 10 3.000 0.2 6.00
7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
Side of CC road
14 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR not less than 10%) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
15 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge.
For CC Drain along with Rigid pavement Rd 100 to 200 R/S & 300 to 600 both side 1 700 0.70 0.15 73.50
For CC Drain along with Rigid pavement Rd 100 to 200 R/S & 300 to 600 both side 2 700 0.40 0.15 84.00
Casing around pipe at Rd 1310 , 1428 , 1575 6.5 1.53 1.38 0.00
Deduction for pipe 6.5 0.785 1.5129 0.00
Total of ( B) Rigid Pavement 4237459.50
(C) Protection Work
14 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .
Oridanary soil (i) upto 3 m depth
Retaining Wall ( 2425 to 2500 LHS & 2770 to 3000 LHS) 1 0.00 1.70 1.2 0.00
15 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Side of retaning Retaining Wall (0.15+1.15)/2 = 0.65 m 1 0 0.650 3.00 0.00 Cum 732.00 0.00
16 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (i). P.C.C grade M 10 (Nominal mix 1:3:6)
Retaining Wall ( 2425 to 2500 LHS & 2770 to 3000 LHS) 1 0 1.70 0.20 0.00
17 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
Retaining Wall ( 2425 to 2500 LHS & 2770 to 3000 LHS)
Retaining Wall ( 2425 to 2500 LHS & 2770 to 3000 LHS) 1 0 0.90 3.0 0.00
Toe Wall (Rd 2180 to 2240m LHS )
Widening of Existing CC road from 3.0 m width to 3.75 m width Rd 200 to 320 m 0 0.375 0.2 0.00
2 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
28 7.31 Providing and laying cement concrete wearing courese M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 ( Rd 0 to 320 = 320 m ) 1 0.00 3.75 0.075 0.00 Cum 9091.00 0.00
6 7.41 (ii) Filler Joint II) Providing and fixing 20 mm thick premoulded joint filler in expansion joint complete as per drawing and technical specifications 0 8.10 0.00 Rmt 308.00 0.00
7 7.36 (i) P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) Nominal mix (1:2.5:5) 2 0.00 6.70 0.15 0.00 Cum 3498.00 0.00
8 7.37 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 2 0.00 6.70 0.2 0.00 Cum 10416.00 0.00
10 For Apron in existing CD ( Detail estimate attech seperately ) no 0.00
Total of (C) Protection Work 0.00
(D) Field Crossing
18 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3
For Field crossing - 300 mm dia. 0 7.50 0.80 0.8 0.00
for provided field crossing pipes(450 mm Dia) - 0 10 0.80 0.90 0.00
for provided field crossing pipes(600 mm Dia) 6 10 1.00 1.00 60.00
23 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105
for field crossing pipes (300 mm Dia) 0 7.50 0.70 0.15 0.00
for field crossing pipes (450 mm Dia) - 0 10.00 0.80 0.15 0.00
19 7.6(A) Providing and laying reinforced cement concrete pipe NP3 for culverts/Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
for field crossing pipes (300 mm Dia) 0 7.50 0.00 Rmt 1129.00 0.00
for field crossing pipes (450 mm Dia) - 0 10.00 0.00 Rmt 1961.00 0.00
Total of (D) Field Crossing 179580.00
(D) TRAFFIC SIGNS AND OTHER APPURTENANCES
20 9.2(A) Cautionary, mandatory, informatory direction and place identification sign boards. (A)Semi-Reflective Traffic signs upto 0.90 sqm Direction and place indentification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 18 0.90 0.90 14.58 sqm 4729.00 68948.82
26 9.16 Providing and fixing LOGO BOARD Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 0.00 Each 6626.00 0.00
21 9.2(B) Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 (Nabard Board) 4 1.20 1.00 4.80 sqm 4667.00 22401.60
18 9.8 Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) 5th Kilometre Stone (precast) 0 0 Each 3700.00 0.00
(ii) Ordinary Kilometer Stone (Precast) 2 2 Each 2194.00 4388.00
(iii) 200 m stone (precast) 7 7 Each 463.00 3241.00
19 9.17 Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 180 180 Each 472.00 84960.00
20 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project (B) Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 2 2 Each 13749.00 27498.00
21 9.15 (A) 10.15(A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 2 2 Each 14015.00 28030.00
22 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) At Bell mouth and curve portion ( total BT length ) 2 1020.00 0.10 204.00 sqm 604.00 123216.00
8.23 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Providing & Fixing tree studs in Square/ Round shape of 4” side/diameter made of 2 mm aluminum substrate (Confirming to IS:736-Material Designation 24345 or 1900) end reflective surface of High Intensity grade as specified in section 800.1.3 of MORT&H duly treated with HLVA and fixing the same with four Nos. high strength nails confirming to 1S:1367 on trees at site each 1500.00 0 each 67.00 0.00
Total of (D) TRAFFIC SIGNS 362683.42
(E) LAY BY PLATFORM ESTIMATE
3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 ( 1No./KM) 0 50.00 8.10 0.3 0.00 Cu.m 170.00 0.00
4.1 A(iii) Grainular subbase with well graded material (table 400.1):---- Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (A)Having CBR value more than 20% , by mix in Place Method (iii) For Grading - III Material ( 1No./KM) 0 50.00 3.75 0.15 0.00
Triangular portion 0 15.00 3.75 0.15 0.00
3.12 Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. 0 50.00 3.75 0 0.00
Triangular portion 0 15.00 3.75 0.150 0.00
4.7(2) WBM Grading 2:--Providing, laying, spreading and compacting Mechanically crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 50.00 3.75 0.075 0.00
Triangular portion 0 15.00 3.75 0.075 0.00
4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 50.00 3.75 0.075 0.00
Triangular portion 0 15.00 3.75 0.075 0.00
4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401.
Side of WBM G-III 0 50 2.05 0.170 0.00
Side of WBM G-II 0 50 2.09 0.075 0.00
Triangular portion 0 15 1.97 0.095 0.00
5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
Tota of (E) LAY BY PLATFORM ESTIMATE 0.00
(F) APPROACH RAMP ESTIMATE
3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 ( 4 No./KM) 0 50.00 7.50 0.6 0.00 Cu.m 170.00 0.00
4.1 A(iii) Grainular subbase with well graded material (table 400.1):---- Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (A)Having CBR value more than 20% , by mix in Place Method (iii) For Grading - III Material ( 4 No./KM) 0 20.00 4.05 0.15 0.00 Cu.m 650.00 0.00
3.12 Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Earthen Shoulder 0 20.00 2.22 0.15 0.00
4.8(2) WBM Grading 2:--Providing, laying, spreading and compacting Mechanically crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 20.00 3.85 0.075 0.00 Cu.m 1415.00 0.00
4.8(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 20.00 3.75 0.075 0.00 Cu.m 1513.00 0.00
4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401.
Side of WBM G-III 0 20 2.05 0.075 0.00
Side of WBM G-II 0 20 2.09 0.075 0.00
5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 0 20.00 3.75 0.00 Sq.m 43.00 0.00
5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 0 20.00 3.75 0.00 Sq.m 13.00 0.00
5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006 0 20.00 3.75 0.00 Sq.m 122.00 0.00
5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B 0 20.00 3.75 0.00 Sq.m 43.00 0.00
Tota of (F) APPROACH RAMP ESTIMATE 0.00
(E) DPR Preperation
23 Preperation of DPR with survey 1.86 0.00 km 11250.0 0.00
Total of (E) DPR Preperation 0.00
As demanded by Forest departement vide letter No.1938 , date 25.04.2023 , for tree cutting and plantation
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Raigarh CGRRDA , Raigarh CGRRDA , Raigarh
PRADHAN MANTRI GRAM SADAK YOJANA
Name of Road :-From Bansjor Gwarghotri To Semipali khurd
Length (Km. ) :- 1.860 Km. Block :- Dharamjaygarh District:- Raigarh
Upgrade Dharamjaygarh
New 1.860 Road No Consultant Anand Vibhor
CBR Value Length CBR CH
1 2.43 514 Embankment Filling Qnty
2 1860 Total Length ( M ) 730 Drain Ord
3 Hilly Cutting length Speed Breaker
4 Embankment Cutting Qnty Retaining Wall
5 840 C.C Road Length (m) 270 Drain(BT) 6 No of Field Crossings 600 mm Toe Wall
6 Scarifying of WBM Road (m) 700 Drain(CC) No of Field Crossings 450 mm Pitching Length ( M )
7 Exiting ( if any ) ( M ) No of Field Crossings 300 mm
8 Dismantle of CC Road (m) Road Furniture Cautionary, Mandatory 18 No 180 Boundery
9 Pavement Length:- 1020
Thickness Quick Accesses
0.320 Total Crust Thickness General Abstract Wearing Course (m)
0.150 G.S.B. Thickness Drain. Layer Pavement Estimate Filler Joint (Nos)
if provide both fill twice if provide CC Estimate M-15 Approch Slab (m)
0.000 Sub Grade/Modified Soil RCC M-25 Approch Slab (m)
0.000 Traffic Design Electric pole shifting
S.T. A Chick List Distances 25
Quarry Stone Mungeli Moorum Dhapai
No. Culvert Details Location Distances 27 1
1 1x 1.5 m Slab Culverts 466
1x 2.0 m Slab Culverts Result of Road Cost
1x 3.0 m Slab Culverts 1072
1x5.0 m Slab Culverts
1x6.0 m Slab Culverts Cost Per Km
2x6.0 m Slab Culverts CD Cost 11.3 6.075 Lakha
3x5.0 m Slab Culverts CC Road 0 #DIV/0! Lakha
Total Cost 25.40 13.654 Lakha
No of Existing Culverts All
Village Area From To Unconnected Habitation
Koliha 1020 1230 210 Koliha Popula 469
Bill of Quantity
Road from - Bansjor Gwarghotri To Semipali khurd SOR - FEB 2018
Length of Road:- 1.86 Km
Sr. no SSR I.No. Description of Item Qty Unit Rate Amount
1 2.1 Setting out :- Setting out work complete wiyh construction of bench mark ( min 1 / km ), working bench mark ( min 4/km ) and near all bridges & CD works made of bricks/ stone masonary or concrete and reference pillars made of Precast concrete poles/ concrete filled 100 mmdia AC pipe @ 100 m interval of as required on both sides of the formation width , marking on central line , setting out curves and recording of central line levels and other required levels and distance etc. including setting out of CD & bridges with required reference pillars and marking etc. as directed by Engineer - in - charge 1.86 km 14968.00 27840 27840.48
2 2.3 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. 3720.00 sqm 5.00 18600 18600.00
3 2.2 Clearing Grass and Removal of Rubbish: Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. 7440.00 sqm 1.00 7440 7440.00
4 2.14 Removal of Telephone/Electric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202. 0.00 Nos 20125.00 0 0.00
5 3.1 Scarifying Existing Granular Surface to a Depth of 50 mm Scarifying existing granular/bituminous surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. ( Rd 1004 to1480 = 476m ) 0.00 sqm 15.00 0 0.00
6 3.2 Compacting original ground / Existing Embankement (i)Compacting original ground supporting embankement/subgrade Loosing , levelling and compacting original ground supporting embankement / subgrade to facilitate placement of first layer of embankement , scarified to a depth of 150 mm mixed with water at OMC and then compacted by compacted by rolling to achieve minimum dry density as given in table 300.1 and 300.2 for embankement construction as per Technical Specification Clause 301.4.1 ( Rd 700 to 850 m ) 0.00 Cum 21.00 0 0.00
7 2.10 Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202 (A) Upto 600 mm dia Hume pipe - 0.00 Rmt 164.00 0 0.00
8 2.10 (B) (B) above 600 mm to 900 mm dia Hume pipe - Rd 1084 0.00 Rmt 222.00 0 0.00
9 2.10 (C ) (C) Above 900 mm dia Hume pipe - 0.00 Rmt 380.00 0 0.00
10 3.8(i) Surface drain in soil- Construction of unlined surface drains of average cross section 0.4 sqm in soil to specified lines , grades , levels and dimension . Excavated material to be used in embankement with a lift upto 3 m and lead of 50 m ( average lead 25 m ) as per Technical Specification Clause 307 730.00 Rmt 63.00 45990 45990.00
11 2.6 ( A) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A)Lime Concrete 0.00 Cum 351.00 0 0.00
12 2.6 (B) (B)Cement Concrete 0.00 Cum 414.00 0 0.00
13 2.6 © (C))Reinforced Cement Concrete 0.00 Cum 1045.00 0 0.00
14 2.8(A) Dismentling of Stone masonary as per Technical Specification clause 202. Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of stone masonry i/c of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A) Rubble Stone masonary in lime / cement/ mud mortar 0.00 Cum 250.00 0 0.00
15 2.11 Dismantling of Cement Concrete Pavements Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202 0.00 cum 1680.00 0
16 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3 758.40 Cu.m 65.00 49296 49296.00
17 8.3(iv) Excavation in hilly areas (iv) Excavation in Hilly Areas in Ordinary Rock by mechanicalmeans not requiring blasting Excavation in hilly area in ordinary rock not requiring blasting bymechanical means including cutting and trimming of slopes anddisposal of cut material with a lift upto 1.5 m and lead upto 20 mas per Clause 1603.2.( as per earth work calculation statement ) 0.00 cum 133.00 0 0.00
18 3.3(i) Construction of embankment with material obtained from roadway cutting:--a.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 0.00 Cu.m 55.00 0 0.00
19 3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 0.00 Cu.m 170.00 0 0.00
20 3.12(a) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. 677.79 Cu.m 180.00 122002 122002.20
21 3.12 (b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. 709.21 Cu.m 200.00 141841 141841.20
22 4.1 (a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III) 1138.97 Cu.m 650.00 740331 740331.39
23 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR not less than 10%) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. 319.20 Cu.m 200.00 63840 63840.00
24 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 For Field Crossing 0.00 Cum 911.00 0 0.00
25 4.8 Wet Mix Macadam :- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. 582.77 Cu.m 1478.00 861336 861336.09
26 4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405..(Work executed with WBM G3 grade but payement made with WBM G2 ) 0.00 Cu.m 1415.00 0 0.00
27 4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to prope 0.00 Cu.m 1513.00 0 0.00
28 5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 3885.14 Sq.m 43.00 167061 167061.13
29 5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 3885.14 Sq.m 13.00 50507 50506.85
30 5.8 (B) (ii) MPM Construction of penetration macadam over prepared base by providing a layer of compacted crushed course aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achieve the desired degree of compaction as per technical specification clouse 506 , Viscocity grade (VG) Bitumen specification as per IS73:2006 (B) 75 mm thick (ii)Bitumen(VG-30) 0 0.00
31 5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006(ii) Bitumen (VG-30) 3885.14 Sq.m 122.00 473987 473987.39
32 5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B(ii) Bitumen (VG-30) 3885.14 Sq.m 43.00 167061 167061.13
33 7.4(B) Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(B)1000 mm dia 0.00 Rmt 5468.00 0 0.00
34 7.6 (A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106 (A) 600 mm dia 60.00 Rmt 2928.00 175680 175680.00
6.7 Cement Concrete cell fill Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 Rd 2600 to 2770 0.00 cum 5836.00 0
37 6.1(ii) Cement Concrete Pavement (ii) Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. 636.00 Cum. 5097.00 3241692 3241692.00
38 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge. 218.25 Cum 3811.00 831751 831750.75
39 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material . 102.32 Cum 253.00 25887 25886.96
40 7.1(II) Ordanary Rock 0.00 Cum 493.00 0 0.00
7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 10.23 Cum 4614.00 47210
41 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 59.25 Cum 3731.00 221062 221061.75
42 7.18(I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C grade M 15 (Nominal mix (1:2.5:5) 42.35 Cum 3848.00 162978 162978.19
43 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix) 6.67 Cum 5223.00 34824 34824.35
44 7.27(I) (i) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20 (i) For nominal mix 1:2:4 0 0.00
45 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.40 MT 54560.00 21706 21706.24
46 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 10.00 No 239.00 2390 2390.00
47 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 Cum 1291.00 0 0.00
48 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 No. 1511.00 0 0.00
49 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 15.00 m 308.00 4620 4620.00
50 7.31 Providing and laying cement concrete wearing courese M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 ( Rd 3528 to 3702 = 174 m ) Cum 9091.00 0 0.00
51 7.41 (ii) Filler Joint III) Providing and fixing 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications Cum 308.00 0 0.00
52 7.36 (i) P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) Nominal mix (1:2.5:5) Cum 3498.00 0 0.00
53 7.37 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 Cum 10416.00 0 0.00
54 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material 46.44 Cum 732.00 33994 33994.08
55 10.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301 Cum 1440.00 0 0.00
56 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 0.00 Cum 1440.00 0 0.00
57 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 0.00 Cum 1660.00 0 0.00
58 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 Rm 2688.00 0 0.00
59 9.2(A) Cautionary, mandatory, informatory direction and place identification sign boards. (A)Semi-Reflective Traffic signs upto 0.90 sqm Direction and place indentification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 14.58 sqm 4729.00 68949 68948.82
60 9.16 Providing and fixing LOGO BOARD Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 0.00 Each 6626.00 0 0.00
61 9.2(B) Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 4.80 sqm 4667.00 22402 22401.60
62 9.8 (I) Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (i) 5th Kilometre Stone (precast) 0.00 Each 3700.00 0 0.00
63 9.8 (II) Ordinary Kilometer Stone (Precast) 2.00 Each 2194.00 4388 4388.00
64 9.8 (III) 200 m stone (precast) 7.00 Each 463.00 3241 3241.00
65 9.17 Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 180.00 Each 472.00 84960 84960.00
66 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project (B) Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 2.00 Each 13749.00 27498 27498.00
67 9.15 (A) 10.15(A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 2.00 Each 14015.00 28030 28030.00
68 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) 204.00 Sq.m 627.00 127908 127908.00
8.23 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Providing & Fixing tree studs in Square/ Round shape of 4” side/diameter made of 2 mm aluminum substrate (Confirming to IS:736-Material Designation 24345 or 1900) end reflective surface of High Intensity grade as specified in section 800.1.3 of MORT&H duly treated with HLVA and fixing the same with four Nos. high strength nails confirming to 1S:1367 on trees at site each 0.00 each 67.00 0
Total Construction 8108304 0.00 -133977
Add 18 % GST 1459495
Add 1 % Contingency 81083
69 DPR Preperation 0.00 km 11250.00 0 0.00
As demanded by Forest departement vide letter No.1938 , date 25.04.2023 , for tree cutting and plantation 0
70 Maintenance of Road for Ist Year after Construction 1.86 per km 30000.00 55800 55800.00
71 Maintenance of Road for IInd Year after Construction 1.86 per km 40000.00 74400 74400.00
72 Maintenance of Road for IIIrd Year after Construction 1.86 per km 70000.00 130200 130200.00
73 Maintenance of Road for IVth Year after Construction 1.86 per km 110000.00 204600 204600.00
74 Maintenance of Road for Vth Year after Construction 1.86 per km 160000.00 297600 297600.00
Total cost of Maintenance TOTAL 762600
GRAND TOTAL 10411482 8674527.13
Add 18 % GST 137268
Total cost incluiding 18 % GST 10548750
Sub. Engineer Asst. Engineer Executive Engineer #REF!
Rural Development Division, Rural Development Division,
CGRRDA , Raigarh CGRRDA ,
MUKHYA MANTRI GRAM SADAK YOJNA (MMGSY)
DETAIL ESTIMATE FOR 1 X 1.50M SPAN SLAB CULVERT
Name of Road:- Bansjor Gwarghotri To Semipali khurd RD:- 466
1.5M Slab Culvert
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth #REF! #REF!
i) Upto 3m depth below av. GL #REF! #REF!
Ordanary Soil #REF! #REF!
Abutments 2 8.9 2.20 2.00 78.320 #REF! #REF!
Wingwalls 4 1.50 2.00 2.00 24.000 #REF! #REF!
2 II Ordanary Rock ( Not Requiring Blasting) 0 #REF! #REF!
Abutments Cum 0 #REF! #REF!
Wingwalls 0 #REF! #REF!
0.00 Cum 202 0 #REF! #REF!
2 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments- Foundation PCC 2 8.9 2.2 0.20 7.832 #REF! #REF!
Wingwalls - Foundation PCC 4 1.5 2 0.20 2.400 #REF! #REF!
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments- Foundation PCC 8.7 2.00 0.20 0.000 #REF! #REF!
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.7)/2 (1.50+2.00)/2 1.50 43.050
Wingwalls - Foundation PCC 1.50 1.8 0.20 0.000 #REF! #REF!
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.50 (1.30+1.80)/2 1.50 13.950
Bed protection 1 7.50 1.50 0.20 2.250
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments #REF! #REF!
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.30)/2 1.80 27.000
Top Block ( From NBL to Wing wall cap ) 4 (1.7+2.3)/2 (0.40+1.10)/2 2.06 12.360
5 7.27 (II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
(II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.100
6 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.40 MT 54,560 21,706
For Cap beam & dirt wall 161.80
Main bar - 12 mm dia@120 mm c/c 1 63 2.09 0.89 117.19
Distribution bar -8 mm dia@160 mm c/c 1 14 7.42 0.395 41.03
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 8 7.42 0.617 36.63
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 2.02 0.617 31.16
For chair - 12mm dia 1 12 0.94 0.89 10.04
(a) for surface reiinforcement @8kg/cum of PCC content
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 10 10.00 No 239 2,390
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 0
Behind Abutments 0.60 4.91 1.00 0.00 0
Behind Returns 0.60 1.00 0.00 0
8 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 308 4,620
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2.00 0.00 No. 1,511 0
9 7.23 (I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (4.0+5.2)/2 (1.7+2.3)/2 1.80 33.12
10 10.5 (I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 1.50 1.50 0.23 Cum 1,440 0
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 1.50 1.50 0.10 Cum 1,660 0
TOTAL Rs. 554,672
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Raigarh CGRRDA , Raigarh CGRRDA , Raigarh
NAME OF ROAD :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
DISTRICT :- Bilaspur
BLOCK :- Thakatpur
LENGTH :- 2.130 km
Rd 66 pro. 1x 1000 mm dia HPC Rd 786 pro. 1x 1000 mm dia HPC Rd 1020 pro. 1x 1000 mm dia HPC Rd 1110 pro. 1x 1000 mm dia HPC Rd 1245 pro. 1x 1000 mm dia HPC
Road start Rd 2130
Latitude - 22.197558 Latitude - 22.214398
Longitude - 81.950629 Longitude - 81.945712
Pro.BT Road ( Rd 00 to 2130 )
Pro. CC road Nil
Ext. CC road ( Rd 700 to 1000 m )
Retaning Wall Rd 1580 to 1650
Toe Wall Rd 1245 to 1315
S.No. Details Page No.
1 Chapter - 1 :- Introduction
2 Chapter - 2 :- Alignment Design
3 Chapter - 3 :- Land Acquisition
4 Chapter - 4 :- Geometric Design Standards
5 Chapter - 5 :- Topographic Survey
6 Chapter - 6 :- Soil and Materials Survey
7 Chapter - 7 :- Traffic Survey
8 Chapter - 8 :- Pavement Design
9 Chapter - 9 :- Hydrological Survey
10 Chapter - 10 :- Design of Cross Drainage structure
11 Chapter - 11 :- Protective Works
12 Chapter - 12 :- Specification
13 Chapter - 13 :- Environmental Issues and Mitigation measures
14 Chapter - 14 :- Analysis of Rates
15 Chapter - 15 :- Cost Estimate
16 Chapter - 16 :- Construction Program
17 Chapter - 17 :- Undertaking for future Maintenance
Chapter 1. Introduction
1.1 Objectives of Mukhya Mantri Gram Sadak Evam Vikas Yojana (MMGSVY)
1 It was on year 2011 that Hon’ble Chief Minister of Chhatisgarh announced the Rural Road connectivity programme under a scheme named “Objectives of Mukhya Mantri Gram Sadak Evam Vikas Yojana”. The scheme has the objective of connecting all the villages by all weather road .Under this scheme folling works are executed .
(i) The unconnected village to be connected by All Weather Road from minimun one side . Exceptionaly it may be constructed by other side also where length is minimum .
(ii) 3.75 m Carriageway width for Rigid / Flexiable pavement with total 7.50 m ROW ( including Shoulder )
(iii) For proposed road Culvert should be constructed in 7.50 m width , but having medium height .
(vii) At some interval provision of Approach ramp is provided so that tractor can easily reach to farm .
(iv) Where sufficent land width is not available , road and culvert is constructed in 6.0 m width instead of 7.50 m width .
(v) In this scheme , road is constructed after complition of Earth work which is constructed under MANERGA .
2 Under this scheme a village (having population less than 500 in non triable and less than 250 in triable block ) which are not came in Pradhan Mantri Gram sadak Yojana scheme is constructed with All Weather Road .In addition some villages which are allready connected from one side but due to construction from other side having less length it is connected to bazar , govt. building also taking in consideration for construction .
3 Under this scheme a road is taken , in which work of Earthwork is construced or in progress under MANERAGA . Balance work of road is constructed under Mukhya Mantri Gram Sadak Evam Vikas Yojana . For this required fund is provided in State Budget for which loan is also granted from Nabard if required .
As Criteria of construction Road under Mukhya Mantri Gram Sadak Yojana is , a village having population less than 500 and which are not came in Pradhan Mantri Gram sadak Yojana scheme . As population of proposed road i.e. Main Road to Khaparakhol is 268 of Bilha block of Bilaspur (C.G.) district, it is suitable to construct in MMGSY scheme.
1.2 All Weather Road
The primary focus of the MMGSY is to provide All-weather road connectivity to the eligible unconnected Habitations. An All-weather road is one which is negotiable in all seasons of the year. This implies that the road-bed is drained effectively (by adequate cross-drainage structures such as culverts, minor bridges and causeways), but this does not necessarily imply that it should be paved or surfaced or black-topped. Interruptions to traffic as per permitted frequency and duration may be allowed.
As the proposed road is constructed in MMGSY scheme , the proposed habitation As the proposed road is constructed in MMGSY scheme , the proposed habitation is connected with all weather road
Bija Belpan Road is connected with all weather road
1.3 Name of work its status vis-à-vis master plan
The name of proposed road is Rajpur Sidhbaba road To Bijaghora Pahuch marg
having earthen surface in poor condition .
The rural road network required for providing the ‘basic access’ to all villages/ habitations is termed as the Core Network. Basic access is defined as one all-weather road access from each village/ habitation to the nearby Market Centre or Rural Business Hub (RBH) and essential social and economic services.
A Core Network comprises of Through Routes and Link Routes. Through routes are the ones which collect traffic from several link roads or a long chain of habitations and lead it to a market centre or a higher category road, i.e. the District Roads or the State or National Highways. Link Routes are the roads connecting a single habitation or a group of habitations to Through Roads or District Roads leading to Market Centers. Link Routes generally have dead ends terminating on habitations, while Through Routes arise from the confluence of two or more Link Routes and emerge on to a major road or to a Market Centre.
The Core Network may not represent the most convenient or economic route for all purposes. However, since studies show 85-90% of rural trips are to market centers, the Core Network is likely to be a cost-effective conceptual frame work for investment and management purposes, particularly in the context of scarce resources.
The Sub-project road Rajpur Sidhbaba road To Bijaghora Pahuch marg Chakarbhata Bilha Main Road se To Indrapuri hote hue NH tak, Bilha Bilaspur
is a link road in Thakatpur block of Bilaspur district.
This road directly connects the habitation of Bija Belpan Road
As the proposed road Rajpur Sidhbaba road To Bijaghora Pahuch marg
is in Thakatpur block of Bilaspur district, having topography same as Bilaspur.
Bilaspur is located at 21º47' and 23º8' North latitudes and 81º14' and 83º15' East latitudes. The north side of this beautiful region is surrounded by profuse green forests and to the east side of the region near Hasdeo valley you will see coal mines. The location of Bilaspur is unique.
Once a princely state, Raigarh is now a major district in Chhattisgarh well known for its coal reserves and power generation in the country. They are also growing in the tourism sector as well. Raigarh has seen a growth in the number of sightseeing tours offered by the local tourist board and the travel agencies. Like other states in Chhattisgarh, the climate of Raigarh district is mostly dry. You can expect the summer season to be mostly warm and dry while the winter season to be cool and pleasant. The temperature ranges from 29.5 - 49 °C in summer, and 8 - 25 °C in winter hence the perfect time to visit Raigarh is during the autumn and winter season. The city of Raigarh is located at 21.9°N 83.4°E and the main water source in the city is from the Kilo river which flows through the city.
1.5 Climatic Condition
The climate of Bilaspur district is sub-tropical, semi arid, continental and monsoon type. Thus, it has hot summers, cool winters and small rainy season. The winter season starts towards the later half of november and extends till about the middle of march followed by summer, which continues till about the end of june when maximum temperature reaches up to 45 degree celsius and dust cyclones are common. After it, southwest monsoon arrives. The rainy season remains between July to September. The post monsoon months October and November constitute a transitional period from monsoon to winter season.The climate is ideal for agriculture development, particularly for wheat, rice, sugarcane and cotton crops. Limited rainy season, good and healthy climate is suitable for industrial development also.
Annual rainfall of the district is about 58 centimeter. Rainfall is unevenly distributed and decreases form south cast to southwest. Rainy season starts from july to september. About 80 percent of the total rainfall is received during this period. Some amount of rainfall is received from western disturbances during winter season. Due to less rainfall and its short duration the agricultural activity is mostly dependent upon canal irrigation and tubewells.
1.6 The Sub-Project Road
The road passes through plain terrain( Rd0 to 2340 & hilly terrain from Rd 2340 to 4700. The road start from Lalpur to Salheghori road , in RHS of road . The proposed road directely connect the village Chhirhutti & Jamkachhar . The proposed road is earthen road in poor condition
1.7 History & Discussion with the villagers of Sub Project Road :-
The proposed road is WBM ( from Rd 0 to 1440 m) and earthen from ( Rd 1440 to 1840 and 2260 to 2550 m ) in poor condition details are as under :-
(i) From Rd 0 to 150 m Forest departement says to change alingement . There is existing structure is present constructed by forest , damage in every year during reany season .
(i) WBM road from Rd 0 to 1440 m, which is in poor condition . It is required to raise the road to avoied water logging .
(ii) Earthen road from Rd 1440 to 1840 and 2260 to 2550 m, which is in poor condition . It is required to raise the road to avoied water logging .
(iii) CC road from Rd 1840 to 2260 m out of which from Rd 1840 to 2196 m is in very poor condition , hence required to reconstruction
(iv)From Rd 660 to 840 m earthen road , having CBR 2%.
(iv) WBM road from rd 5450 to 6000 m, which is in poor condition . It is required to raise the road to avoied water logging .
(a) Ch 30 - 1x 600 mm dia field crossing - Poor condition
(b) Ch 309 - 5x6.0 m span slab culvert - Good condition
(c) Ch 228 - 1x 600 mm dia field crossing - Poor condition
(d) Ch 275 - 1x 300 mm dia field crossing - Poor condition
(e) Ch 720 - 1x 600 mm dia HPC - Good condition
(f) Ch 1738 - 1x 600 mm dia HPC - Good condition
(g) Ch 1860 - 1x 600 mm dia field crossing - Poor condition
(h) Ch 2441 - 1x 600 mm dia field crossing - Poor condition
(i) Ch 5756 - 2x 900 mm dia field crossing - Poor condition
Brief description of road
District: Bilaspur
Block: Thakatpur
Vidhansabha: Thakatpur
Road Name: Rajpur Sidhbaba road To Bijaghora Pahuch marg
Road Proposed by:
Road Length: 2.13 Km
Start Point: Latitude :- 2208' 2.17" N
Longitude :- 81030' 57.63" E
End Point: Latitude :- 2208' 54.10" N
Longitude :- 81031' 22.89" E
2 Dharrabhata 473 1800 2520
3 Dumardihkala 3530 3660
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 2. Alignment Design
The basic aim of highway design is to identify technically sound, environment-friendly and economically feasible highway alignment. The ensuing sections deals with obligatory points, which control highway alignment, design of cross-section, highway geometric design & methodology, design of miscellaneous items.
The main components included in the highway design are:
Ø Cross-sectional elements
Ø Horizontal alignment
Ø Vertical profile
Ø Junctions and/or Interchanges
Ø Road furniture
Ø Miscellaneous items
2.2 Horizontal alignment
Table 2.1 – Features of Horizontal Alignment
Chainage Length Description Reason for deviation from existing alignment, if necessary
From (km) To (km) (km)
0 0 0 Builtup area ( Jhaliapur) N.R.
0 0.00 0 Hilly terrain N.R. Improve the geometric of road so as to straight the alingement , that minimise the curve .
0.00 0 0 Forest N.R.
0 0.1 0.1 Builtup area N.R.
0.1 2.13 2.03 Govt land N.R.
2.13 2.5 0.37 Builtup area N.R.
2.5 3.8 1.3 Agri . Land N.R.
2.4 2.7 0.3 Govt. land N.R.
a) Centre line of the existing and proposed horizontal alignment coincide YES
b) Centre line of the existing and proposed horizontal alignment deviate at certain sections NO
Figure 2.1Schematic diagram showing location and offsets from existing alignment
Chainage LHS Existing alignment RHS Chainage shift Approx land required (m)
6.4 The centre line coincide with the existing alingement
5.7 The centre line coincide with the existing alingement
3.6 The centre line coincide with the existing alingement
2.99 The centre line coincide with the existing alingement
2.6 The centre line coincide with the existing alingement
1.6 The centre line coincide with the existing alingement
Sub Engineer Asst. Engineer Executive Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Details of Horizontal Curve , vertical curve and junction
1 Horizontal Curve
Curve No. IP Chainage Radius Ls Speed Extra widening Def Angle Lc Ltotal Hand of Curve Ara of Extra widening
(m) (m) (Kmph) D M S (m) (m)
2 Vertical Curve
Sl. NO. Chainage (m) Level of pvi Length of curve Type of curve Grade in (%) Grade out (%) Grade difference (%) Chainage Level
St. of Curve End of Curve St. of Curve End of Curve
3 Junction Details.
Sl. Type of intersection Location (km) Exiting condition Proposed modification Remark
1 T - junction 0 earthen Bell mouth joint provide
2 Y - junction 0.18 earthen Bell mouth joint provide
3 Y - junction 0.21 earthen Bell mouth joint provide
4 Y - junction 0.51 earthen Bell mouth joint provide
5 Y - junction 0.755 earthen Bell mouth joint provide
6 Y - junction 1.28 earthen Bell mouth joint provide
7 T - junction 2.13 BT Bell mouth joint provide
Table 2.16 . Minimum length of Transition Curve for Different Speeds and Curve Radii
Plain and Rolling Terain Mountainous and Steep Terrain
Curve Radius (m) Design Speed (km/h) Curve Radius (m) Design Speed (km/h)
Transition length (m) Transition length (m)
NA - Not Applicable NR - Transition Not required
Table 2.17 Widening of Pavement at Curve
Radius of Curve (m) Upto 20 21 - 60 Above 60
Extra widening for 3.75 m Wide single Lane Carriageway , (m) 0.9 0.6 Nil
Table 2.18 Recommended Set - back Distance for Single Lane Carriagway
Radius of Circular Curve(m) Set - Back Distance (m)
S=20m ( V=20km/h) S=25m ( V=25km/h) S=30m ( V=30km/h) S=45m ( V=40km/h) S=60m ( V=50km/h)
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 3. Land Acquisition
The existing road is poor earthen surface ( Rd 0 to 4700 m in poor condition . Thus the project road is a new connectivity road. The existing Right of Way (ROW) is varying from 5.5 m to7.5 m. Detail of ROW are atteched in chaptr 2.5
3.2 Proposed ROW
The width of carriageway has been considered as 3.75 m in accordance with the IRC-SP 20: 2002. The total roadway width is limited to 7.50 m with 1.875 m earthen shoulder on either side of carriage way. The proposed ROW generally varies from 12 m – 15 m depending upon the embankment height and the proposed ROW is even less than 10 m in some stretches of habitation area and in areas having tree plantation.
3.3 Additional Land
Local administration and local panchayat need to apprise the villagers about requirement of minor areas in places for development of the road. Villagers are generally highly enthusiastic during site visits for selection of the road. Table 3.1 provides the chainage-wise additional land required.
Table 3.1 Additional Land Required
Sl. No. Chainage Width of Land available in m Width of Land Required in m Comments
1 100 5.9 2.05 2.05 Sufficent land width is available to construct flexiable pavement . Hence proposed
3 300 5.6 2.2 2.2 Due to habitation in both side , CC road is proposed .
10 1000 5.5 2.25 2.25 Sufficent land width is available to construct flexiable pavement . Hence proposed
14 1400 6.1 1.95 1.95 Sufficent land width is available to construct flexiable pavement . Hence proposed
22 2200 4.8 - - Due to Habitation , rigid pavement proposed
28 2600 4.8 - - Due to habitation area good to propose Rigid pavement . Hence proposed
30 2800 6.5 - - Sufficent land width is available to construct flexiable pavement . Hence proposed
43 4100 5 - - Habitation area good to propose Rigid pavement . Hence proposed
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 4. Geometric Design Standards
Design standards for detailed design of the project roads were adopted after review of IRC : SP - 72 2015 - Rural Roads Manual and discussion with PIU, MMGSY. For the purpose of the present project, the design standards mentioned below are for general application with relaxation at difficult or restricted locations
The classification of terrain was selected from plain/rolling/hilly/steep classification for which following criteria will be applicable.
Terrain classification Cross slope of the country
Plain 0-10% More than 1 in 10
Rolling 10-25% 1 in 10 to 1 in 4
Mountainous 25-60% 1 in 4 to 1 in 1.67
Steep Greater than 60% Less than 1 in 1.67
4.3 Design Speed
The proposed design speed along this project road will be selected from the following table
Terrain Design Speed (kmph)
Mountainous / Steep 25 20
4.4 Right of Way (ROW)
The requirement of ROW for this road is as follows (as specified in IRC-SP 20:2002):
Road classification Plain and Rolling Terrain
Open Area Built-up Area
Normal Range Normal Range
Rural roads (ODR and VR) 15 15-25 15 15-20
4.5 Roadway Width
Roadway width for this road is given below:
Terrain Classification Roadway Width (m)
Plain and Rolling 6.0
4.6 Carriageway Width
The width of carriageway for this project road is 3.75m,
It is proposed to have {1.875 m } wide shoulder on both sides of road.
4.8 Roadway width at cross-drainage structures
The roadway width at culvert locations for this road is 7.50 m in plain terrain . Road way width at the Hume pipe culvert is adopted as 7.50 m . Roadway width at bridges will be 4.25m on link routes in plain-area .
4.9 Sight Distance
The safe stopping sight distance is applicable in the geometric design. The sight distance values for this road as per IRC recommendations are presented below :
Design Speed (km/hr) Safe Stopping Sight Distance (m)
4.10 Radius of Horizontal Curve
According to IRC recommendations/standards, the minimum radius of horizontal curve for this project road is given below:
Terrain Category Radius of Horizontal Curve (m)
Ruling Minimum Absolute Minimum
4.11 Camber & Super elevation
A camber adopted on this road section is given below. The maximum super elevation is 7.0 % for this project road.
Surface type Camber (%)
Low rainfall High rainfall
(Annual rainfall <1000mm) (Annual rainfall >1000mm)
WBM Gravel Road 3.5 4
Thin bituminous Road 3 3.5
Rigid Pavement 2 2.5
4.12 Vertical Alignment
The present road is in plain terrain and vertical alignment has been designed well within ruling gradient.
Generally, minimum gradient of 0.3% for drainage purpose is considered for designing the vertical alignment of this road. Vertical curves are not required when grade change is less than 1%, however a minimum vertical curve is provided to avoid vertical kink.
4.13 Vertical Curves
For satisfactory appearance, the minimum length of vertical curve for different design speed is given in IRC-SP 20:2002. Vertical curves will be designed to provide the visibility at least corresponding to the safe stopping sight distance. Valley curves will be designed for headlight sight distance.
4.14 Side slope
Side slope for this rural road where embankment height is less than 3.0m is given in the table below.
Condition Slope (H:V)
Embankment in silty/sandy/gravel soil 2.0:1
Embankment in clay or clayey silt or inundated condition 2.5:1 to 3:1
Cutting in silty/sandy/gravelly soil 1:1 to 0.5:1
Radius of Curve (m) Upto 20 21 - 60 Above 60
Cutting in disintegrated rock or conglomerate 0.5:1 to 0.25:1
Cutting in soft rock like shale 0.25:1 to 0.125:1
Cutting in medium rock like sandstone, phyllite 0.083:1 to 0.0625:1
4.15 Extra Widening of Pavement
The Extra Widening of Pavement at Curve as per IRC guideline is given below:
Radius of Curve (m) Upto 20 21 - 60 Above 60
Extra Widening for 3.75 m wide single lane carriageway, (m) 0.9 0.6 Nil
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , 0
Chapter 5. Topographic Survey
Topographic survey true to ground realties have been done using compass and auto levels, record the data in computer and find the details using softwares.
The in-house standards, work procedures and quality plan prepared with reference to IRC: SP 19-2001, IRC: SP 20, IRC: SP 13 (in respect of surveys for rivers/streams) and current international practices have been followed during the above survey.
Traversing has been done by compass having angular measurement accuracy ±20 sec.
Survey compass is a survey testing equipment used for survey or mapping. In compass survey, chain or tape or odometer is used for linear measurements and compass is used for fixing direction. The freely suspended magnetic needle in a compass directs to north- south and the bearing of line is obtained by line of sight. Apart from prismatic compass.Traversing has been carried out for proposed raod .
The primary reference at water-level recording stations is a set of stable bench-marks, installed in locations where their level should not change. Upon initial set-up of a station, the levels of the relevant parts of the installation are established and recorded by means of accurate levelling.
Precise levelling is a particularly accurate method of differential levelling which uses highly accurate levels and with a more rigorous observing procedure than general engineering levelling. It aims to achieve high orders of accuracy such as 1 mm per 1 km traverse. A level surface is a surface which is everywhere perpendicular to the direction of the force of gravity. An example is the surface of a completely still lake. For ordinary levelling, level surfaces at different elevations can be considered to be parallel.
A level datum is an arbitrary level surface to which elevations are referred. The most common surveying datum is mean sea-level (MSL), but as hydrological work is usually just concerned with levels in a local area, we often use: An assumed datum, which is established by giving a benchmark an assumed value (e.g. 100.000 m) to which all levels in the local area will be reduced. It is not good practice to assume a level which is close to the actual MSL value, as it creates potential for confusion.
A reduced level is the vertical distance between a survey point and the adopted level datum.
A bench mark (BM) is the term given to a definite, permanent accessible point of known height above a datum to which the height of other points can be referred. It is usually a stainless steel pin embedded in a substantial concrete block cast into the ground. At hydrological stations rock bolts driven into bedrock or concrete structures can be used, but structures should be used warily as they themselves are subject to settlement. The locations of benchmarks shall be marked with BM marker posts and/or paint, and recorded on the Station History Form.List of TBM atteched in 3.6
A set-up refers the position of a level or other instrument at the time in which a number of observations are made without mooring the instrument.
The first observation is made to the known point and is termed a backsight; the last observation is to the final point or the next to be measured on the run, and all other points are intermediates
A run is the levelling between two or more points measured in one direction only. The outward run is from known to unknown points and the return run is the check levelling in the opposite direction.
A close is the difference between the starting level of the initial point for the outward run and that determined at the end of the return run. If the levels have been reduced correctly this value should be the same as the difference between the sum of the rises and falls and also the difference between the sum of the backsights and foresights.
Height of Collimation is the elevation of the optical axis of the telescope at the time of the setup.
The line of collimation is the imaginary line at the elevation.
5.4 Cross Section & Detailing
Cross sections were taken at 30 m interval and at closer interval in curved portion of the existing road. All physical features of the road were recorded. Details and design for cross drainage structures given in hydraulic design.Detail Cross Section are atteched in Volume II
5.5 Data Processing
All data from topographic survey recorded by total station/ auto level & compass were downloaded/feeded and final alignment, plan, profile were prepared and presented in AutoCAD Format
5.6 TBM and Refrence Piller
Atteched seperately
S.No. Rd Location R.L.
TBM-1 BACK SIDE COMPUND WALL 100.000
TBM-2 R.H.S. SLAB CULVERT TOP 95.275
TBM-3 R.H.S. CULVERT WALL TOP 95.005
TBM-4 L.H.S. E.P. 95.295
TBM-5 R.H.S. E.P. 104.050
TBM-6 R.H.S. ROCK STONE 133.430
TBM-7 R.H.S. ROCK STONE 165.875
TBM-8 R.H.S. ROCK STONE 214.805
TBM-9 R.H.S. ROCK STONE 228.560
TBM-10 R.H.S. ROCK STONE 255.620
TBM-11 L.H.S. ROCK STONE 256.920
TBM-12 LHS on Electric pole
TBM-13 LHS on Electric pole
TBM-14 LHS on Narega Board
14.2 TBM-15 RHS on Hand pump top
TBM-16 LHS on Electric pole
14.3 TBM-17 RHS on Hand pump top
Refrence Piller
S.No. Rd Location Distance from center (m)
1 30 LHS Electric pole 8.50
2 1595 LHS Electric pole 6.50
3 2128 LHS Electric pole 7.50
4 3120 LHS Electric pole 8.00
5 4100 RHS Hand pump 7.40
5 1600 LHS Transformer 4.00
6 1825 LHS Electric pole 2.00
7 1910 LHS Electric pole 3.70
8 1952 LHS Electric pole 2.90
9 RHS Panchyat pillar
10 RHS Electric pole
11 LHS Electric pole
12 RHS Electric pole
13 RHS Electric pole
14 LHS Electric pole
15 RHS Electric pole
16 RHS Electric pole
17 RHS Electric pole
18 LHS Electric pole
19 LHS Electric pole
20 LHS Electric pole
21 LHS Electric pole
Reference pillars given Yes No
TBM given Yes No
Traverse survey carried out Yes No
Cross section and detailing carried out Yes No
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 2. Planning and Basic Design Consideration
Figure - 1 :- Road map of India and State
Figure - 2 :- District Map
Figure - 3 :- Block Maps showing all existing connectivity like District/block HQ, new townships, National and State highway network, mandis, hospitals, colleges, schools etc.
2.2 Preliminary alignment investigation
2.3 Site Photographs
2.4 Road Design Brief
Table 2.1 Road Design Brief
S. No. Location length Issues Design Solution
1 0 To 100 100 Road start from Tilaikundi To Jalke Road . In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
2 100 To 500 400 In this section Existing earthen Road in poor condition .Road passes from habitation As sufficent land width is available hence proposed flexiable pavement
3 500 To 1000 500 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design . Due to habitation area , good to provide pannel concrete
4 1000 To 2000 1000 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
5 2000 To 3000 1000 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
6 3000 To 3240 240 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
7 3240 To 2300 -940 In this section Existing earthen Road in poor condition . due to steep gradian good to provide pannelled concrete , hence proposed
8 2300 To 2500 200 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design . In this section Existing CC Road in poor condition . Dismental Ext CC road then provide new pannelled concrete
9 2500 To 4230 1730 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
10 4230 To 5270 1040 In this section Existing CC Road in average condition with 3.0 m width . Widening of Ext CC from 3.0 to 3.75 m width with PCC M15 then overlay proposed with cell fill concrete
11 5270 To 5440 170 In this section Existing earthen Road in poor condition . Due to habitation area , good to provide Rigid pavement ( Panal concrete )
12 5440 To 5780 340 In this section Existing CC Road in poor condition . Dismental Ext CC road then provide new pannelled concrete
13 5780 To 6100 320 In this section Existing earthen Road in poor condition . Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
2.5 Transect Walk Summary
Atteched seprately
Table 2.2 Transect Walk Summary
Chainage Existing Land Width Additional Land Required Type of Loss Village Remark/ Suggestions
LHS RHS LHS RHS
10 6.9 1.2 1.9 Agri& Govt land Agri& Govt land
200 7.8 0.2 2 Agri& Govt land Agri& Govt land proper culvert proposed
400 7.2 0.8 2 Agri& Govt land Agri& Govt land
600 7 1.8 1.2 Agri& Govt land Agri& Govt land
800 7.3 1.3 1.4 Agri& Govt land Agri& Govt land proper culvert proposed
1000 7 1.4 1.6 Agri& Govt land Agri& Govt land
1200 7.3 1.2 1.5 Agri& Govt land Agri& Govt land
1400 7.4 0.9 1.7 Agri& Govt land Agri& Govt land
1600 6.9 1.2 1.9 Agri& Govt land Agri& Govt land
1800 7 1.5 1.5 Agri& Govt land Agri& Govt land
2000 6.5 1.9 1.6 Agri& Govt land Agri& Govt land
2200 6.8 1.5 1.7 Agri& Govt land Agri& Govt land
2400 7.2 1.4 1.4 Agri& Govt land Agri& Govt land
2600 7 1.5 1.5 B/up B/up Bhada ext rigid pavement
2800 7.3 1.1 1.6 B/up B/up ext rigid pavement
3000 7.1 1.5 1.4 Agri& Govt land Agri& Govt land
3200 7 1.4 1.6 Agri& Govt land Agri& Govt land
3400 7.4 1.2 1.4 Agri& Govt land Agri& Govt land
3600 7 1.5 1.5 Agri& Govt land Agri& Govt land
3800 7.2 1.2 1.6 Agri& Govt land Agri& Govt land
4000 7.6 0.7 1.7 Agri& Govt land Agri& Govt land
4200 7.1 1.1 1.8 Agri& Govt land Agri& Govt land
4400 6.9 1.2 1.6 Agri& Govt land Agri& Govt land
4600 6.8 1.2 1.6 Agri& Govt land Agri& Govt land
4800 6.4 1.2 1.6 B/up B/up Lohadiya
5400 7.2 1.2 1.4 Agri& Govt land Agri& Govt land
5600 7.6 1.2 1.2 Agri& Govt land Agri& Govt land ext rigid pavement
5800 7.5 1.2 1.3 Agri& Govt land Agri& Govt land ext rigid pavement
5900 7.5 1.2 1.3 Agri& Govt land Agri& Govt land
6200 8 1.2 2 Agri& Govt land Agri& Govt land
6400 8 1.2 2 B/up B/up Barbhatha
7000 7.4 2.3 2.3 Agri& Govt land Agri& Govt land
7200 7 2.5 2.5 Agri& Govt land Agri& Govt land
7400 7.4 2.3 2.3 Agri& Govt land Agri& Govt land
7600 7 2.5 2.5 Agri& Govt land Agri& Govt land
7800 7.5 2.2 2.3 Agri& Govt land Agri& Govt land
8000 8 2 2 Agri& Govt land Agri& Govt land
10800 7 2.5 2.5 Agriculture land Agriculture land
11000 7.8 2.1 2.1 Agriculture land Agriculture land
11200 7.6 2.2 2.2 Agriculture land Agriculture land
11400 7 2.5 2.5 Agriculture land Agriculture land
12400 8.2 1.9 1.9 Agriculture land Agriculture land
12600 7.6 2.2 2.2 Agriculture land Agriculture land
12800 7 2.4 2.6 Agriculture land Agriculture land
13000 7.8 2.2 2 Agriculture land Agriculture land
13200 7.4 2.3 2.3 Agriculture land Agriculture land
13400 7.4 2.3 2.3 Agriculture land Agriculture land
13600 8 2 2 Agriculture land Agriculture land
13800 7.4 2.3 2.3 Agriculture land Agriculture land
14000 8 2 2 Agriculture land Agriculture land
14200 8.3 1.8 1.9 Agriculture land Agriculture land
14400 8.2 1.9 1.9 Agriculture land Agriculture land
14600 7.1 2.5 2.4 Agriculture land Agriculture land
14800 7 2.5 2.5 Agriculture land Agriculture land
15000 6.1 3 2.9 Agriculture land Agriculture land
15200 7 2.5 2.5 Agriculture land Agriculture land
15400 8.1 2 1.9 Agriculture land Agriculture land
15600 8 2 2 Agriculture land Agriculture land
15800 8.2 1.9 1.9 Agriculture land Agriculture land
16000 7.8 2.1 2.1 Agriculture land Agriculture land
16200 8 2 2 Agriculture land Agriculture land
9600 7.8 2.1 2.1 Agriculture land Agriculture land
9800 7.7 2.1 2.2 Agriculture land Agriculture land
10000 7.9 2 2.1 Agriculture land Agriculture land
10500 7.8 2.1 2.1 Agriculture land Agriculture land
10600 8.2 1.9 1.9 Agriculture land Agriculture land
9200 1 8 B/up B/up
{Tick the relevant box}
Transect walk done yes No
Photographs of Transect walk attached yes No
Transect walk summary table included yes No
Minutes of Transect walk attached yes No
Photographs at 100 m intervals taken yes No
Major changes in alignment perceived yes No
Design brief provided yes No
Photographs of Grama Sabha attached yes No
Consultant Asst. Engineer E.E. Cum Member Secretary
Anand Vibhor PIU, PMGSY, Bilaspur PIU, PMGSY, Bilaspur
{Tick the relevant box}
Transect walk done Yes No
Photographs of Transect walk attached Yes No
Transect walk summary table included Yes No
Minutes of Transect walk attached Yes No
Photographs at 100 m intervals taken Yes No
Major changes in alignment perceived Yes No
Design brief provided Yes No
Photographs of Grama Sabha attached Yes No
Consultant Sub. Engineer Asst. Engineer #REF!
Anand Vibhor #REF! #REF! #REF! Bilaspur
PRADHAN MANTRI GRAM SADAK YOJNA -IV
CHHATTISGARH RURAL ROAD DEVELOPMENT AGENCY
INVENTORY OF ROAD
Dist. :- Bilaspur Block :- Thakatpur
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Length :- 2.13 Km
Chainage in Mt. Existing Road Details Proposal / Treatment Remarks
Pavement Shoulder Total Road Top Width
From To Type Condition Width Type Condition Width
0.00 0.00 CC poor 3.750 EARTHEN DAMAGED 1.500 6.750 Widening with PCC M15 for making proper width. Then provide 200 mm CC M30 over it in 5.50 m width . 1900.000 Ex. BT Road Top surface are good contion , ony both side widening and MPM+BM take in full width 5.50m on ex. Road
0 100 earthen poor 3.500 earthen damaged 1.000 5.500 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
100 500 earthen poor 3.700 earthen damaged 0.900 5.500 As sufficent land width is available hence proposed flexiable pavement
500 1000 earthen poor 3.400 earthen damaged 0.850 5.100 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design . 500.000
1000 2000 earthen poor 3.500 earthen damaged 1.200 5.900 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
2000 3000 earthen poor 3.600 earthen damaged 1.000 5.600 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design . -4050.000 Camber Corection by 20% MPM and Design as per Upgradation road treetment.
3000 3240 earthen poor 3.700 earthen damaged 1.500 6.700 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design . 0.000
3240 2300 earthen poor 3.300 earthen damaged 0.900 5.100 due to steep gradian good to provide pannelled concrete , hence proposed
2300 2500 earthen poor 3.500 earthen damaged 1.700 6.900 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
2500 4230 earthen poor 3.000 earthen damaged 0.800 4.600 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design .
4230 5270 CC average 3.000 earthen damaged 0.500 4.000 Widening of Ext CC from 3.0 to 3.75 m width with PCC M15 then overlay proposed with cell fill concrete 0.000
5270 5440 earthen poor 3.000 earthen damaged 0.800 4.600 Due to habitation area , good to provide Rigid pavement ( Panal concrete ) 0.000
5440 5780 CC poor 3.000 earthen damaged 0.500 4.000 Dismental Ext CC road then provide new pannelled concrete 0.000
5780 6100 earthen poor 3.00 earthen damaged 2.800 8.600 Proposed proper embankement by Cutting and filling , then provide GSB, WMM & BT as per design . -1650.000
Consultant Sub. Engineer Asst. Engineer #REF!
Anand Vibhor #REF! #REF! #REF! #REF!
Chapter 3 .Topographic Survey
Topographic survey true to ground realties have been done using compass and auto levels, record the data in computer and find the details using softwares.
The in-house standards, work procedures and quality plan prepared with reference to IRC: SP 19-2001, IRC: SP 20, IRC: SP 13 (in respect of surveys for rivers/streams) and current international practices have been followed during the above survey.
Traversing has been done by compass having angular measurement accuracy ±20 sec.
Survey compass is a survey testing equipment used for survey or mapping. In compass survey, chain or tape or odometer is used for linear measurements and compass is used for fixing direction. The freely suspended magnetic needle in a compass directs to north- south and the bearing of line is obtained by line of sight. Apart from prismatic compass.Traversing has been carried out for proposed raod .
The primary reference at water-level recording stations is a set of stable bench-marks, installed in locations where their level should not change. Upon initial set-up of a station, the levels of the relevant parts of the installation are established and recorded by means of accurate levelling.
Precise levelling is a particularly accurate method of differential levelling which uses highly accurate levels and with a more rigorous observing procedure than general engineering levelling. It aims to achieve high orders of accuracy such as 1 mm per 1 km traverse. A level surface is a surface which is everywhere perpendicular to the direction of the force of gravity. An example is the surface of a completely still lake. For ordinary levelling, level surfaces at different elevations can be considered to be parallel.
A level datum is an arbitrary level surface to which elevations are referred. The most common surveying datum is mean sea-level (MSL), but as hydrological work is usually just concerned with levels in a local area, we often use: An assumed datum, which is established by giving a benchmark an assumed value (e.g. 100.000 m) to which all levels in the local area will be reduced. It is not good practice to assume a level which is close to the actual MSL value, as it creates potential for confusion.
A reduced level is the vertical distance between a survey point and the adopted level datum.
A bench mark (BM) is the term given to a definite, permanent accessible point of known height above a datum to which the height of other points can be referred. It is usually a stainless steel pin embedded in a substantial concrete block cast into the ground. At hydrological stations rock bolts driven into bedrock or concrete structures can be used, but structures should be used warily as they themselves are subject to settlement. The locations of benchmarks shall be marked with BM marker posts and/or paint, and recorded on the Station History Form.List of TBM atteched in 3.6
A set-up refers the position of a level or other instrument at the time in which a number of observations are made without mooring the instrument.
The first observation is made to the known point and is termed a backsight; the last observation is to the final point or the next to be measured on the run, and all other points are intermediates
A run is the levelling between two or more points measured in one direction only. The outward run is from known to unknown points and the return run is the check levelling in the opposite direction.
A close is the difference between the starting level of the initial point for the outward run and that determined at the end of the return run. If the levels have been reduced correctly this value should be the same as the difference between the sum of the rises and falls and also the difference between the sum of the backsights and foresights.
Height of Collimation is the elevation of the optical axis of the telescope at the time of the setup.
The line of collimation is the imaginary line at the elevation.
3.4 Cross Section & Detailing
Cross sections were taken at 30 m interval and at closer interval in curved portion of the existing road. All physical features of the road were recorded. Details and design for cross drainage structures given in hydraulic design.Detail Cross Section are atteched in Volume II
3.5 Data Processing
All data from topographic survey recorded by total station/ auto level & compass were downloaded/feeded and final alignment, plan, profile were prepared and presented in AutoCAD Format
3.6 TBM and Refrence Piller
S.No. Rd Location R.L.
TBM-20 RHS on Electric pole
TBM-21 RHS on Electric pole
Refrence Piller
S.No. Rd Location Distance from center (m)
1 0 Welcome gatele 6.95
2 0 LHS Electric pole 4.00
3 0 LHS on Electric pole 3.20
4 0 LHS on Electric pole 3.20
5 0 LHS on Hand pump top 8.30
6 0 RHS on Hand pump top 7.30
6 RHS Electric pole
7 RHS Electric pole
8 LHS Electric pole
9 LHS Electric pole
10 LHS Transformer
11 LHS Electric pole
12 RHS Electric pole
13 RHS Electric pole
14 LHS Electric pole
15 RHS Electric pole
16 RHS Electric pole
17 RHS Electric pole
18 LHS Electric pole
19 LHS Electric pole
20 LHS Electric pole
21 LHS Electric pole
Reference pillars given Yes No
TBM with northing-easting given Yes No
Traverse survey carried out Yes No
Cross section and detailing carried out Yes No
Consultant Asst. Engineer E.E. Cum Member Secretary
Anand Vibhor PIU, PMGSY, Bilaspur PIU, PMGSY, Bilaspur
BM/TBM with northing-easting given Yes No
Traverse survey carried out Yes No
Cross section and detailing carried out Yes No
L section details attached with the
Part II of the DPR Yes No
Consultant Sub. Engineer #REF! #REF!
Anand Vibhor #REF! #REF! #REF! #REF!
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :-
Location:- Rd 4300
Sample No: Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4410
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.676
Optimum moisture content 11.3 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :-
Location:- Rd 5800
Sample No: Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4400
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.684
Optimum moisture content 11.3 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :-
Location:- Rd 1700 m
Sample No: 2 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4235
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.694
Optimum moisture content 11.4 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 500 Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.13 %
Av. C.B.R. at 5.0 mm penetration: 4.11 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 1500 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.39 %
Av. C.B.R. at 5.0 mm penetration: 4.21 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 2200 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.12 %
Av. C.B.R. at 5.0 mm penetration: 3.75 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 3300 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.34 %
Av. C.B.R. at 5.0 mm penetration: 4.07 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 4600 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.25 %
Av. C.B.R. at 5.0 mm penetration: 4.02 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 5250 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.18 %
Av. C.B.R. at 5.0 mm penetration: 3.97 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 4500 Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.03 %
Av. C.B.R. at 5.0 mm penetration: 4.03 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 5500 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.15 %
Av. C.B.R. at 5.0 mm penetration: 4.01 %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 6500 m Proving Ring Factor 3.500
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 4.97 %
Av. C.B.R. at 5.0 mm penetration: 3.64 %
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 500
Sample No: 1 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4410
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.645
Optimum moisture content 10.30 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 1500 m
Sample No: 2 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4335
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.696
Optimum moisture content 9.90 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 2200 m
Sample No: 3 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4140
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.638
Optimum moisture content 10.37 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 3300 m
Sample No: 4 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4060
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.685
Optimum moisture content 11.0 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Main Road To Bhulasidih
Location:- Rd 4600 m
Sample No: Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4410
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.678
Optimum moisture content 10.64 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 5250 m
Sample No: 6 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4125
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.671
Optimum moisture content 10.77 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 4500
Sample No: 7 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4426
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.630
Optimum moisture content 10.6 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 5500 m
Sample No: 7 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4333
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.659
Optimum moisture content 10.9 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Location:- Rd 6500 m
Sample No: 7 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4152
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.616
Optimum moisture content 10.9 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Chapter 6. Soil and Materials Survey
The soil and material investigations were done following the guidelines of IRC: SP: 20-2002 and IRC: SP: 72-2007 and other relevant IS codes. The potential sources of borrow areas for soil and quarry sites will be identified
6.2 Soil sample collection and Testing
Soil samples will be collected along and around the road alignment at one location per km, from the adjoining borrow areas, as well as one sample is collected from the existing road. Soil Classification tests like grain size analysis and Atterberg’s limit were conducted for all the samples collected. Standard Proctor test and the corresponding 4 day soaked CBR test were conducted either for a minimum of one test per km for soil samples of same group or more tests due to variation of soil type. The following tests were conducted as detailed below:
• Grain size analysis as per IS : 2720 (Part 4) – 1985
• Atterberg’s limit as per IS : 2720 (Part 5) – 1985
• Standard Proctor density test as per IS : 2720 (Part 7) – 1980
• 4 day soaked CBR test as per IS : 2720 (Part 16) – 1985
Summary of Test
S.No. Location CBR (%) MDD gm/cc OMC (%) L.L. (%) P.I. (%) Sieve Analysis Sand content
% passing against I.S.Sieve
10mm 4.75mm 2mm 425u 75u
As the soil of CBR in between 5% to 6% available and having MDD more than 1.52 gm/cc , it is suitable for embankement construction.
6.3 Analysis of Test Results
The laboratory soaked CBR value ranges from 5% to 6% The soil laboratory test results will be summarized in Table 4.2
Table 4.1 CBR values for different stretches
Sl.No. Section CBR (%)
6.4 Coarse and Fine Aggregates
Information regarding the source of aggregate and sand will be gathered. The source and the lead distance from the quarry to project site will be finalized in discussion with the PIU. The aggregates and sand where available and acceptable shall be used for bituminous work, concrete works, other pavement works.
For the proposed Road construction material is Available as follows.
1 Sand Arpa river 25 Km
2 Moorum Local 2 Km
3 Aggregate Daija 10 Km
4 Earth for embankment construction Local 1 Km
Figure-3 Quarry Map - attech in chapter C figure 5
6.5 Sub-soil investigation for bridges
Where the rock or some firm undisturbed soil stratum is not likely to be far below the alluvial bed of the stream , a trail pit should be dug down to such rock or firm soil . But if there is no rock or undisturbed firm soil for a great depth below the stream bed level , then the trail pit may be taken down roughly 2 to 3 meter below the lowest bed level . The location of each trail pit should be shown in the cross section of the proposed site . The trail pit section should be plotted to show the kind of soil passed through . However depth of trail pit in soil shall minimum 2 m for culverts and 3 m for small bridges .
Borrow pit suitable Yes No
SSI for existing ground Yes No
Investigation for coarse/fine aggregate Yes No
Quarry map Yes No
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
CBR Test of Soil
Location:- Rd 3400 Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Location:- Rd 4400 Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Location:- Rd 5400 Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Location:- Rd 6200 m Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 4300 Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 5800 Proving Ring Factor 2.200
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.34 %
Av. C.B.R. at 5.0 mm penetration: 3.96 %
CBR Test of Soil
Name of Road :-
Location:- Rd 1700 m Proving Ring Factor 2.200
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.34 %
Av. C.B.R. at 5.0 mm penetration: 3.83 %
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 5800
Sample No: 6 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4335
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.683
Optimum moisture content 11.3 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :-
Location:- Rd 6200 m
Sample No: 7 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4340
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.741
Optimum moisture content 11.6 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- #REF!
Sample No: 4 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4064
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.672
Optimum moisture content 11.1 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
CBR Test of Soil
Location:- Rd 1500 m Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Location:- Rd 2250 m Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 3400 m Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 4550 Proving Ring Factor #REF!
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: #REF! %
Av. C.B.R. at 5.0 mm penetration: #REF! %
CBR Test of Soil
Name of Road :- #REF!
Location:- Rd 5500 Proving Ring Factor 2.200
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.34 %
Av. C.B.R. at 5.0 mm penetration: 3.96 %
CBR Test of Soil
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 400 Proving Ring Factor 2.240
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.46 %
Av. C.B.R. at 5.0 mm penetration: 3.95 %
Rural Development Division,
CGRRDA , Bilaspur
CBR Test of Soil
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 1500 m Proving Ring Factor 2.240
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.49 %
Av. C.B.R. at 5.0 mm penetration: 3.92 %
Rural Development Division,
CGRRDA , Bilaspur
CBR Test of Soil
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 2100 m Proving Ring Factor 2.240
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.28 %
Av. C.B.R. at 5.0 mm penetration: 3.87 %
Rural Development Division,
CGRRDA , Bilaspur
CBR Test of Soil
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 3900 m Proving Ring Factor 2.240
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.15 %
Av. C.B.R. at 5.0 mm penetration: 3.90 %
Rural Development Division,
CGRRDA , Bilaspur
CBR Test of Soil
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 4100 Proving Ring Factor 2.240
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Load Intensity (kg/cm2) (A) x One divn. Value Area of Plunger Corrected Load Intensity (kg/cm2) standard load Intensity (kg/cm2) Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%)
Min - Sec. (mm) (mm) I I I Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.30 %
Av. C.B.R. at 5.0 mm penetration: 3.91 %
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 400
Sample No: Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4320
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.716
Optimum moisture content 10.0 %
Rural Development Division,
CGRRDA , Bilaspur
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 1500 m
Sample No: 2 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4270
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.722
Optimum moisture content 10.7 %
Rural Development Division,
CGRRDA , Bilaspur
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 2100 m
Sample No: 3 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4120
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Name of Road :- Wt of Mould( W1) 4450 gm
Item :- Volume of Mould Vm 1000 gm/cc
S.No. Wt of mould + compacted soil W2 Wt of wet soil( W2-W1) Wet density Moisture content determination Dry density
Cont No Wt of con Wt of con+wet soil Wt of con+dry soil Wt of water(Ww) Wt of dry soil(Ws) M.C.(%)
Maximum dry density 1.700
Optimum moisture content 10.6 %
Rural Development Division,
CGRRDA , Bilaspur
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 3900 m
Sample No: 4 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4358
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.682
Optimum moisture content 10.8 %
Rural Development Division,
CGRRDA , Bilaspur
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 4100
Sample No: 5 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4465
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.713
Optimum moisture content 11.2 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Location:- Rd 4100
Sample No: 5 Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4470
Type of test ;- Modify Proctor Standard Proctor
Volume of mould (cc) : CC 1113
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.707
Optimum moisture content 11.3 %
Rural Development Division,
CGRRDA , Bilaspur
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Block :- Thakatpur
Distt. :- Bilaspur
To Proposed Road
Daija To Rajpur
1 Moorum quarry - Local 2 km
2 Aggregate quarry - Daija 10 km
3 Sand quarry - Arpa river 25 km
Certified that the quarry and leads shown above are tentative
Rural Development Division,
CGRRDA , Bilaspur
Chapter 7. Traffic Survey
In the present scenario of new connectivity/upgradation road, 3 day, 24 hr traffic volume count has been conducted on the already completed or similar type of road in the vicinity of the project road. The Classified Volume Count survey has been carried out in accordance with the requirements of the TOR and relevant codes (IRC: SP: 19-2001, IRC: SP:72 - 2015).The surveys have been carried out by trained enumerators manually under the monitoring of Engineering Supervisor.
Traffic count done on allready completed B.T. road , which is near by the proposed road .
7.2 Traffic Data and Analysis
The traffic count done was classified into different vehicle category as given below:
Motorized vehicle comprising of light commercial vehicle, medium commercial vehicle, heavy commercial vehicle, trucks, buses, agricultural tractors with trailers, car, jeep, two wheelers etc.
Non- motorized vehicles comprising of cycle, rickshaw, cycle van, animal drawn vehicle etc.
The number of laden and un-laden commercial vehicles was recorded during the traffic counts. Traffic volume count for this project road was done during Harvesting season. It is assumed that peak harvesting season traffic is double of non harvesting season
Average of 7day traffic data is presented in Table 5.1.
Table 5.1 Average daily Traffic data at both directions for three days
Sl. No. Type of Vehicle Day-1 Day-2 Day-3 Average
1 Car, Jeep, Van #REF! #REF! #REF! #REF!
2 Agriculture Tractor (LCV) #REF! #REF! #REF! #REF!
3 Scooters/Motorbikes #REF! #REF! #REF! #REF!
4 Bus / Minibus #REF! #REF! #REF! #REF!
5 Trucks #REF! #REF! #REF! #REF!
6 Truck - Trailor ,Agriculture Tractor - Trailor #REF! #REF! #REF! #REF!
7 Tractor without trailer 0 0 0 0
8 Cycles #REF! #REF! #REF! #REF!
9 Cycle Rickshaw / Hand Cart 0 0 0 0
10 Horse cart / Bullock Cart #REF! #REF! #REF! #REF!
11 Pedestrian 0 0 0 0
Total commercial vehicle per day (cvpd) #REF!
Total motorised vehicle per day #REF!
Total non-motorised vehicle per day #REF!
{Tick the relevant box}
a) Traffic volume and mix do not vary along the road
b) Traffic volume and mix vary along the road
c) Traffic volume and mix will vary along the road in the future
d) There is a potential for through traffic using the road
e) % of loaded vehicles #REF!
5.3 Traffic Growth Rate and Forecast
We adopted here an average annual growth rate of 7.5% over the design life as set out in IRC: SP 72-2007
Table 5.2 Average Annual Daily Traffic at Road
S. No. HCV MCV LCV CAR/JEEP M/CYCLES CARTS CYCLES
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0 #REF!
1 TOTAL MOTORISED VEHICLE #REF!
2 TOTAL NON MOTORISED VEHICLE #REF!
3 AVERAGE DAILY TRFFIC ADT #REF!
4 ANNUAL AVERAGE DAILY TRAFFIC AADT (During Non Harvesting Season) #REF!
5 PROJECTED ANNUAL AVERAGE DAILY TRAFFIC AADT( FOR 2 YEAR PERIOD) #REF!
6 PROPORTION FACTOR #REF!
7 PROJECTED TRAFFIC
#REF! #REF! #REF! #REF!
8 VEHICLE DAMAGE FACTOR VDF
#REF! #REF! #REF! #REF! #REF!
9 TOTAL ESAL ( EQUIVALENT STANDARD AXLE LOAD)PER DAY #REF!
10 CUMULATIVE ESAL OVER 10 YEARS @ 7.5% GROWTH RATE #REF!
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
TRAFFIC CENSUS DATA SHEET
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
S.No. From To Jeep/Car/van etc. Three wheel Vehicle Agriculture Tractor Bus Truck Motor Cycle Total Slow Moving Remark Note :- PCU
Date Time (AM) Date Time (AM) Animal Drawn Bycycle Total 0 to 2500 single lane
conversiation Factor 1 1 4.5 3 3 0.5 8 0.5 184
Total P.C.U. of Vehicle 752.83 1056
Commercial vehicle per day 147.67 188.2083333
PCU for Lane Design 0-2000-Single Lane, 2000-6000 Intermediate Lane, 6000-15000 Two Lane(for bothway traffic) and above Four Lane / Six Lane
Lane and width as per PCU Single Lane
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
MUKHYA MANTRI GRAM SADAK YOJNA (MMGSVY)
DESIGN OF FLEXIBLE PAVEMENT
As per IRC: SP:72-2015
Road Name: Rajpur Sidhbaba road To Bijaghora Pahuch marg
Block: Thakatpur Distcict: Bilaspur Package No.:
Average Daily Traffic in non Harvesting Season
HCV -Truck (Lodad) 7 MCV -Agricultural Tractor-trailor (Unlodad)) 40
HCV -Truck (Unlodad) 5 MCV -Agricultural Tractor-trailor (Overloded) 9
HCV -Truck (Overloded) 5 LCV - Cars/ Vans/ Jeeps/Three Wheelers 42
hcv - Bus (Lodad)) 0 Two Wheelers 189
hcv - Bus (Unlodad) 0 Cycles 261
hcv - Bus (Overloded) 0 Animal Drawn Cart 4
MCV -Agricultural Tractor-trailor (Lodad) 40 Pedestrian 242
Total Traffic: 602 Duration of Harvesting Season in Days ( From Local Enquiry) t = 75
Total Motorized: 337 Average Traffic During Non Harvesting Season (Considered half of the total Traffic in peak Season ) T= 301
Total Non Motorized: 265 Average Increase in Traffic During Harvesting Season nT= 301
Pedestrian : 242 Avg. Annual Daily Traffic AADT = T+((1.2 x nT x t)/365) AADT= 375
It is presumed that road will open for traffic after 2 yrs. - -
therefore ADT after 2 yrs by considering 6.0% growth rate ADT = AADT x (1+0.060)n ADT 422
For Pavement Design consider the Propotionate value of HCV, MCV & SWC out of ADT
Sr. No. Vehicle Type Propotionate Numbers = T. Count/T. Traffic x ADT VDF Value ESAL Per Day (T0) ESAL = (vdf x No.) Cumulative ESAL N = T0 x 365 x L x [ ((1+ 0.06)n - 1)/0.06] N = T0 x 5164 x
1 HCV -Truck (Lodad) 5 2.58 12.29 63448
2 HCV -Truck (Unlodad) 4 0.31 1.11 5718
3 HCV -Truck (Overloded) 4 5.35 19.11 98676
4 hcv - Bus (Lodad)) 0 2.58 0.00 0
5 hcv - Bus (Unlodad) 0 0.31 0.00 0
6 hcv - Bus (Overloded) 0 5.35 0.00 0
7 MCV -Agricultural Tractor-trailor (Lodad) 28 0.31 8.69 44900
8 MCV -Agricultural Tractor-trailor (Unlodad)) 28 0.02 0.56 2897
9 MCV -Agricultural Tractor-trailor (Overloded) 6 0.65 4.05 20921
As there is Significant Traffic of Solid Wheel Bullock Cart, Multiply Cumulative ESAL with correction Factor for SWC Trafffic AADT Correction Factor For SWC Traffic
For AADT : 2643 100 1.7
Correction Factor : 1.0615 150 1.25
FINAL Cumulative ESAL : 1856396 200 1.2
Traffic Category : T-3 400 1.1
The traffic parameter has been categorized into 7 to categories as under :- 60,000 to 1,00,000 500 1.07
The traffic parameter has been categorized into 7 to categories as under:- Subgrade Strength Classes ( according to SP:72 - 2007 )
T1 : 10,000 to 30000 ESAL applications Quality of Subgrade Class Range (CBR%)
T2 : 30,000 to 60,000 ESAL applications Very Poor S1 2
T3: 60,000 to 1,00,000 ESAL applications Poor S2 3 - 4
T4: 1,00,000 to 2,00,000 ESAL applications Fair S3 4 - 6
T5: 2,00,000 to 3,00,000 ESAL applications Good S4 6 - 9
T6: 3,00,000 to 6,00,000 ESAL applications Very Good S5 9 - 15
T7: 6,00,000 to 10,00,000 ESAL applications
From the Soil Test Result Design CBR of Subgrade
CBR RESULT OF TEST - I : 5.58
CBR RESULT OF TEST - II : 5.49
CBR RESULT OF TEST - III : 5.54
CBR RESULT OF TEST - IV : 5.36
AVG. CBR / DESIGN CBR (%) : 5.49
From the Soil Surveys the Subgrade Strength Class : S-2
From the Trffice survey the Traffic Category : T-3
Design Pavement thickness as per Fig 4 of IRC-SP - 72 - 2007
OGPC : 20 MM Bituminous Surface Treated WBM
Thickness of Grade III : 75 MM Base of Gravel / CRMB/ WBM
Thickness of Grade II : 75 MM
Thickness of G.S.B. : 175 MM Granular Sub - Base
Thickness Modified Soil : 0 MM
Total Crust Thickness : 325 MM
Provide 20 mm Thick Premix carpet with seal Coat Type "B" as wearing course
TRAFFIC CENSUS DATA SHEET
Name of Road :- #REF!
S.No. Month January Year 2017 Jeep/Car Three wheel Vehicle Tractor Agriculture Tractor with Trailer LCV Bus Truck Truck / Trailer Motor Cycle Total Slow Moving Remark
Date Time (AM) Date Time (AM) Animal Drawn Bycycle Total
Total P.C.U. of Vehicle 2812
Commercial vehicle per day 176
PCU for Lane Design 0-2000-Single Lane, 2000-6000 Intermediate Lane, 6000-15000 Two Lane(for bothway traffic) and above Four Lane / Six Lane
Lane and width as per PCU Intermediate Lane
Consultant Sub Engineer Asst. Engineer 0
Anand Vibhor 0 0
Sl. No. AverageTraffic Data Mainly Consider Appendix A,B to check your ESAL count. As per Appendix-B % increase in Length for the Proposals
Motorised AADT Correction factor for SWC Traffic Pro 15 1.025 1 4.8 7.25 4.30 4.20 11.50
1 Pkg. Cars, jeeps, vans, 3 wheelers 21 ADT 294 100 1.70 Ori 2.6 0.75 0.75 3.5 3.3 1.50 2.00 6.00
Name of Road Motorised two wheelers 25 ADT lean 294 150 1.25 12.4 0.275 0.25 1.3 3.95 2.8 2.2 5.5
Trucks laden 5 300 1.15
0 Period : Trucks unladen 5 AADT=(T+1.2nTt/365) 366 400 1.10
Enter if Peak = 1, Lean = 0 Trucks overloded 18 AADT*1.06*1.06 411.2376 500 1.07
0.06 Growth rate adopted(%) Agri Tractor Tr laden 19 Factor=AADT*1.06*1.06/ADT 1.398767347
10 Design life in years Agri Tractor Tr unladen 4 Overloaded HCV*factor*2.86 92.01091608 100 1.7
2 No. of Harvesting seasons Agri Tractor Tr over loaded 23 Loaded HCV*factor*2.58 36.08819755 101 1.691
75 No. of days in each Harvesting season Bus laden 5 Unloaded HCV*factor*0.31 2.168089388 102 1.682
Bus unladen 0 Overloaded MCV*factor*0.65 20.91157184 103 1.673
Bus over loaded 5 Loaded MCV*factor*0.31 8.238739673 104 1.664
38 53.15315918 Non-motorised 0 Unloaded MCV*factor*0.02 0.1119013878 105 1.655
10 13.98767347 Cycle rickshaws 24 ESAL=To*4811 767496 107 1.637
Total CVPD Animal driven Solid wheeled 0 1.117 857293.032 108 1.628 1116087 586079.08
94 131.4841306 Animal driven pneumatic tyred 0 109 1.619 279021.75
Design as per IRC-37(2001) ROAD DESIGN
Data- N = 365 x [(1+r)n-1] x A x D x F
(i) Lane= Two lane and Single Carrigeway r
(ii) Average Daily Traffic A = 98 (both direction) Where N = Number of Comercial Vehicle to be catered on the pavement
(iii) Traffic Growth Rate per Anum r = 7.50% As per page no.11( IRC 37-2001) P = Commercial Vehicle per day = 176
(iv) Design Life= 15 Years A = P(1+r )x = 176 (1+0.05)2 = 193.73
(v) Vehicle Damage Factor F = 1.5 As per page no.12( IRC 37-2001) r = Groth Rate - 5% = 0.05 ( as per IRC:37-2012 , clause No. 4.2.2 )
(vi) Design CBR of Subgrade Soil 3% D = Lane Distribution factor = 0.75 ( as per IRC:37-2012 , clause No. 4.5.1 )
Design Calculation F = Vehicle damage factor = 3.5 ( as per IRC:37-2012 , Table No. 4.2 )
n = Design life of road = 10 years
(i) Distribution Factor D = 0.075 (As per para 3.3.5)
(ii) Cummulative no. of standard axels to be created for in the design N = 365 x [(1+r)n-1] x A x D x F
N= 365 x [(1+r)n-1] x A x D x F r
(iii) Total pavement thickness for CBR 3% and Traffic 2.0 msa = 610 mm from figure 1 (IRC 37-2001) Road design for CBR 10% and Traffic- 2 msa
As Per IRC 37 -2012 plate 7 page no 28
(iv) Pavement Composition- as per IRC 37-2001 page No. 24 (a) Bituminous Surfacing Total Pavement Thickness = 445 mm
i) SDBC = 25 mm Where
ii) BM = 50 mm Granular Sub Base (GSB) = 150 mm
(b) Granular Base 225 mm Granular Base (WMM) = 225 mm
(c) Granular Sub Base 310 mm DBM = 50 mm
Provided this crust as per following layers thickness Total 445 mm
i) Wearing Course 25 mm Semi Dense Bituminous Course
ii) Binder Course 50 mm Dense Bituminous Macadam (DBM)
iii)Granular Base 225 mm WBM in three layer
vi) Granular Sub Base 310 mm Granular Sub Base(GSB)
Consultant Asst. Engineer EXECUTIVE ENGINEER
Anand Vibhor CGRRDA CGRRDA
VDF :- Vehicle damage factor
AADT:- Average Annual Daily Traffic
HCV :- Heavy commercial Vehicle
MCV :- Medium - Heavy commercial Vehicle
CVPD :- Commercial Vehicle per day
msa :- Million Standard Axles
ESAL :- Equivalent Standard Axle Load
WBM :- Wet Mix Macadam
Chapter 8. Pavement Design
Considering the sub-grade strength, projected traffic and the design life, the pavement design for low volume PMGSY roads was carried out as per guidelines of IRC: SP: 72 – 2015 or IRC:37:2012 or IRC SP:77 “Design of Gravel Road” and IRC SP:62-2004 “Cement Concrete roads”. In built up area for hygienic and safety reasons, C.C. pavement was used with a hard shoulder and drain appropriate line drain.
8.2 Pavement Design Approach
8.2.1 Design Life
A design life of 10 years was considered for the purpose of pavement design of flexible and granular pavements.
8.2.2 Design Traffic
The average annual daily traffic (AADT) for the opening year as well as the total commercial vehicle per day (CVPD) was presented in Table 5.2.
8.2.3 Determination of ESAL applications
Only commercial vehicles with a gross laden weight of 3 tonnes or more are considered. The design traffic was considered in terms of cumulative number of standard axles to be carried during the design life of the road. The numbers of commercial vehicles of different axle loads are converted to number of standard axle repetitions by a multiplier called the Vehicle Damage Factor (VDF). An indicative VDF value was considered as the traffic volume of rural road does not warrant axle load survey.
For calculating the VDF, the following categories of vehicles was considered as suggested in paragraph 3.4.4 of IRC:SP72-2015
• Laden heavy/medium commercial vehicles
• Un-laden /partially loaded heavy/medium commercial vehicles
• Over loaded heavy/medium commercial vehicles
Indicative VDF values considered 10% of laden MCV and 10% laden HCV as overloaded & given below:
Vehicle type Laden Un-laden /Partially laden
Lane distribution factor (L) for Single lane road = 1.0 Cumulative ESAL application = To x 4811 x L, where To = ESAL application per day. The Cumulative ESAL application for the project road as per paragraph 3.5 of IRC:SP72-2015 is presented in Annexure
8.2.4 Subgrade CBR
The subgrade CBR range of 5% to 6% was considered and the traffic falls in the T5 category.
8.3 Design Alternatives
Design alternatives considered
Chainage Design alternatives considered Specify design alternative selected Justification
From To Pavement Shoulder
Flexible Rigid Earthen full width Hard Full width Hard shoulder 0.875 m each side Soil stabilization and use of locally available marginal materials.
0 0 yes yes back water of Mati nalla
0 0 yes yes Habitation
0 0 yes yes Hilly terrain
2130 2500 yes yes Habitation
2500 1800 Yes yes
1800 2300 yes yes Steep gradiant
2300 2500 Yes yes
2500 1700 Yes yes
1700 6000 yes yes Habitation
8.4 Pavement composition
i Flexible Pavement :- Rd 0 to 2130
ii The designed pavement thickness and composition was calculated by referring Figure 4 (Pavement design catalogue) of IRC:37:2012. The ratio between heavy commercial vehicles and medium commercial vehicles as given in Chapter 5 should be maintained as far as possible.
The pavement layers provided are given below:
Table 5.2 Average Annual Daily Traffic at Road
S. No. HCV MCV LCV Car/Jeep Mcycles Carts Cycles
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1 Total Motorised Vehicle #REF!
2 Total Non Motorised Vehicle #REF!
3 Average Daily Traffic ADT #REF!
4 Annual Average Daily Traffic AADT (During Non Harvesting Season) #REF!
5 Projected Annual Average Daily Traffic AADT( For 2 Year Period) #REF!
6 Proportion Factor #REF!
7 Projected Traffic
#REF! #REF! #REF! #REF!
8 Vehicle Damage Factor VDF
#REF! #REF! #REF! #REF! #REF!
9 Total ESAL ( Equivalent Standard Axle Load )Per Day #REF!
10 Cumulative ESAL Over 10 Years @ 6% Growth Rate #REF!
Evaluation of Subgrade Strength
i)Existing CBR = 4 to 5 %
i) Design CBR = 5 to 6 %
CBR of existing soil is 4 to 5 . Provision of cuting and spreading of existing road is made in estimate , we got a 100 mm layer of 10 to 15% CBR . for design purpose we have to made 300 mm th layer . So in order to acieve desired CBR a layer of 200 mm(CBR not less than 10) is provided in full width .
PAVEMENT THICKNESS AND COMPOSITION
For commulative ESAL applications of 236560 reffering to to the Traffic category in the
range 200000 to 300000 and the subgrade category of CBR 5 % to 6%, Fig 4, IRC:SP:72-2015
As per IRC SP:72-2015 (crust required)
GSB (CBR not less than 20%) 175 mm
Base of grawel /CRMB/WBM(CBR not< 100) 150 mm
OGPC with seal coat 20 mm
Total Crust 345 mm
Layers Items Thickness for pavement
Top Layer/Surface course OGPC with seal coat 20 mm
Bituminous layer Bituminous Macadem 50 mm
Base Layer Base of grawel /CRMB/WBM ( CBR not< 100) 225 mm
Sub – Base Layer GSB (CBR not less than 20%) 125 mm
Total Crust 420 mm
Top layer of WBM will be treated with bituminous surface of PMC & Seal Coat
iii Rigid Pavement :- 0
Note :- From Rd 640 to 1335 Existing CC Road in average conditionwith 3.0 m width .Widening with M15 from 3.0 to 3.75 m width then Overlay with Cell fill concrete proposed .
CC pavement design as per IRC:SP:62-2015
Top Layer Pavement Quality Concrete 200 mm
Sub – Base Layer Granular Sub-base 150 mm
Total thickness 350 mm
Total thickness 325 mm
8.5 Embankment Design
As there is no high embankement in proposed road , hence Need not required to design embankement
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
a) Traffic volume and mix do not vary along the road
b) Traffic volume and mix vary along the road
c) Traffic volume and mix will vary along the road in the future
d) There is a potential for through traffic using the road
e) % of loaded vehicles
Consultant Sub. Engineer Asst. Engineer Rural Development Division,
Anand Vibhor #REF! #REF! #REF! Bilaspur
TYPICAL CROSS SECTION OF PROPOSED ROAD
7.50 m Formate : F-3A
Earthen Shoulder (CBR 10%)
PMC+Seal - 20 mm th(3.75 m width)
WMM -150 mm th (3.75 m width)
GSB - 150 mm th ( 405 m width)
GSB -Gr III 200 mm th (4.05 m width)
Earthen Shoulder (CBR 7%)
Existing embankement
TYPICAL CROSS SECTION OF FLEXIBLE PAVEMENT
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur Bilaspur
TYPICAL CROSS SECTION OF PROPOSED ROAD
7.50 m Formate : F-3A
Earthen Shoulder (CBR 10%)
BM+PMC+Seal - 70 mm th(3.75 m width)
WMM -225 mm th (3.75 m width)
GSB - 200 mm th ( 405 m width)
GSB -Gr III 200 mm th (4.05 m width)
Earthen Shoulder (CBR 7%)
Existing embankement
TYPICAL CROSS SECTION OF FLEXIBLE PAVEMENT
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Sub. Engineer Asst. Engineer Executive Engineer 0
Rural Development Division, 0 0
CGRRDA , Bilaspur
CC M30 - 200 mm th Shoulder -200 mm th
GSB -150 mm th ( 4.05 m width) Earth embankement
GSB -Gr III 200 mm th (4.05 m width)
Earthen Shoulder (CBR 7%)
Existing embankement
TYPICAL CROSS SECTION OF RIGID PAVEMENT :- 0
Cell fill concrete - 100 mm th Hard Shoulder -100 mm th
Existing Rigid pavement Earth embankement
TYPICAL CROSS SECTION OF RIGID PAVEMENT ( CELL FILL CONCRETE ):- 0
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
TYPICAL CROSS SECTION OF RIGID PAVEMENT ( PANAL CONCRETE )
Chapter 9 .Hydrological Survey
Construction of a road embankment may sometime block the natural drainage paths and cause a heading up on the water on upstream side. In finalizing the HFL, due allowance for the possible afflux in such circumstances must be made. Adequate number of openings shall be provided.
Hydrological survey is necessary for design of adequate and safe Cross Drainage Structures so that the rain water can pass as per natural slope. The hydrological and hydraulic studies are to be conducted in accordance with IRC: SP: 13-2004 and IRC: 5-2015. Hydrological survey of the proposed road is based on the following observations:
• Rainfall Data
• Catchments Area
• Time of Concentration
• Existing Cross Drainage Structures
Drainage of road refers to the satisfactory disposal of surplus water within the road limits. The water involved may be precipitation falling on the road, surface runoff form the adjacent land, seepage water moving through sub-terrain channels, or moisture rising by capillary action. Adequate information about drainage patterns is necessary to devise an effective drainage system, which brings into focus the need for requisite studies and investigations
• Drainage studies have the following principal objectives
1. fixing the grade line of the road
2. design of pavement and
3. design of the surface/sub-surface drainage system
• Main components of drainage investigation are determination of HFL and ponded water level, depth of water table, range of tidal levels and amount of surface runoff. Besides this, for cut sections in rolling and hilly areas, it would be necessary to carry out special investigations for sub-terrain flows and seepage of irrigation water from fields situated above the road.
• Extent of studies and the data to be collected will depend on the type and scope of the project. Usually good deal of information could be collected through site inspection, simple measurements and local enquiry. Most appropriate time for such enquiries is during the stage of preliminarysurvey so that the information gathered can be of use in fixing the alignment and finalizing the broad strategy for improving the drainage. Detailed investigations could continue till the final location survey when any adjustment in the light of further data could still be made before the projects in finally ready. In the case of cut sections, investigations for seepage and sub-terrain flows may generally have to be done again at the stage of formation cut when new features may come to light warranting modifications in design or the need for special measures.
9.2 Rainfall Data
Rainfall Data as applicable for the project road were collected with maximum rainfall occurring in the months of year or taken average rainfall of area. Five year rainfall data chart enclosed
9.3 Catchment Area
The Catchments area is calculated by gathering local information and topographical survey data as it was not possible to calculate from topographical sheets due to their unavailability
9.4 Time of Concentration
Time of concentration (tc) in hours is calculated from the formula of (0.87 x L3/H)0.385, where L is distance from the critical point to the structure site in km and H is the difference in elevation between the critical point and the structure site in meters.
9.5 Existing Cross Drainage Structures
no field crossing are present on proposed road :
Table-9.1 List and condition of existing culverts
S.No. Chainage (m) Description of Existing Structure Repair/Reconstruction Required
Type Span/ Dia. (m) Condition
1 66 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
2 786 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
3 1020 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
4 1100 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
5 1245 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
6 1583 HPC 1x600 mm Good Canal crossing
7 0 HPC 4Rx1000 mm Good 0
8 0 HPC 1x600 mm poor ( pipe Choke) 0
9 0 Field crossing 3Rx1000 mm poor 1x 3.00 m slab culvert
10 0 HPC 1Rx600 mm Good 0
11 0 HPC 1x600 mm poor ( pipe Choke) 1x1000 mm dia HPC
12 0 VCW 6Rx600 mm Good 0
13 0 HPC 2Rx1200 mm Poor 1x 6.00 m slab culvert
14 0 HPC 1x600 mm Poor 1x1000 mm dia HPC
15 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
16 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
17 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC Replace by 1x0.60 m Dia HPC
18 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
19 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
20 0 HPC 1x600 mm Poor 1x1000 mm dia HPC
21 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
22 0 Slab culvert 1x1.00 m Poor 1x2.0 m slab culvert
23 0 HPC 1x1000 mm Poor 1x2.0 m slab culvert
24 0 FCW 20 m Poor 3x5.0 m slab culvert
25 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
26 0 HPC 1x600 mm Poor 1x2.0 m slab culvert
27 0 Slab culvert 1x1.00 m Poor 1x2.0 m slab culvert
28 0 FCW 30 m Poor 2x6.0 m slab culvert
29 0 FCW 20 m Poor 2x6.0 m slab culvert
30 #REF! #REF! #REF! #REF! #REF!
31 #REF! #REF! #REF! #REF! #REF!
32 #REF! #REF! #REF! #REF! #REF!
33 #REF! #REF! #REF! #REF! #REF!
34 #REF! #REF! #REF! #REF! #REF!
35 #REF! #REF! #REF! #REF! #REF!
36 #REF! #REF! #REF! #REF! #REF!
37 #REF! #REF! #REF! #REF! #REF!
38 #REF! #REF! #REF! #REF! #REF!
39 #REF! #REF! #REF! #REF! #REF!
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , CGRRDA ,
Chapter 7. Adopted Geometric Design Standards
Design standards for detailed design of the project roads were adopted after review of IRC : SP - 72 2015 - Rural Roads Manual and discussion with PIU, PMGSY. For the purpose of the present project, the design standards mentioned below are for general application with relaxation at difficult or restricted locations
The classification of terrain was selected from plain/rolling/hilly/steep classification for which following criteria will be applicable.
Terrain classification Cross slope of the country
Plain 0-10% More than 1 in 10
Rolling 10-25% 1 in 10 to 1 in 4
Mountainous 25-60% 1 in 4 to 1 in 1.67
Steep Greater than 60% Less than 1 in 1.67
7.3 Design Speed
The proposed design speed along this project road will be selected from the following table
Terrain Design Speed (kmph)
Mountainous / Steep 25 20
7.4 Right of Way (ROW)
The requirement of ROW for this road is as follows (as specified in IRC-SP 20:2002):
Road classification Plain and Rolling Terrain
Open Area Built-up Area
Normal Range Normal Range
Rural roads (ODR and VR) 8 8 -10 6 6 -7
7.5 Roadway Width
Roadway width for this road is given below:
Terrain Classification Roadway Width (m)
Plain and Rolling 6.0
7.6 Carriageway Width
The width of carriageway for this project road is 3.75m.
It is proposed to have {1.875 m } wide shoulder as the case may be on both sides .
7.8 Roadway width at cross-drainage structures
The roadway width at culvert locations for this road is 7.50 m in plain terrain . Road way width at the Hume pipe culvert is adopted as 7.50 m .
7.9 Sight Distance
The safe stopping sight distance is applicable in the geometric design. The sight distance values for this road as per IRC recommendations are presented below :
Design Speed (km/hr) Safe Stopping Sight Distance (m)
7.10 Radius of Horizontal Curve
According to IRC recommendations/standards, the minimum radius of horizontal curve for this project road is given below:
Terrain Category Radius of Horizontal Curve (m)
Ruling Minimum Absolute Minimum
7.11 Camber & Super elevation
A camber adopted on this road section is given below. The maximum super elevation is 7.0 % for this project road.
Surface type Camber (%)
Low rainfall High rainfall
(Annual rainfall <1000mm) (Annual rainfall >1000mm)
WBM Gravel Road 3.5 4
Thin bituminous Road 3 3.5
Rigid Pavement 2 2.5
7.12 Vertical Alignment
The present road is in plain terrain and vertical alignment has been designed well within ruling gradient.
Generally, minimum gradient of 0.3% for drainage purpose is considered for designing the vertical alignment of this road. Vertical curves are not required when grade change is less than 1%, however a minimum vertical curve is provided to avoid vertical kink.
7.13 Vertical Curves
For satisfactory appearance, the minimum length of vertical curve for different design speed is given in IRC-SP 20:2002. Vertical curves will be designed to provide the visibility at least corresponding to the safe stopping sight distance. Valley curves will be designed for headlight sight distance.
7.14 Side slope
Side slope for this rural road where embankment height is less than 3.0m is given in the table below.
Condition Slope (H:V)
Embankment in silty/sandy/gravel soil 2.0:1
Embankment in clay or clayey silt or inundated condition 2.5:1 to 3:1
Cutting in silty/sandy/gravelly soil 1:1 to 0.5:1
Radius of Curve (m) Upto 20 21 - 60 Above 60
Cutting in disintegrated rock or conglomerate 0.5:1 to 0.25:1
Cutting in soft rock like shale 0.25:1 to 0.125:1
Cutting in medium rock like sandstone, phyllite 0.083:1 to 0.0625:1
7.15 Extra Widening of Pavement
The Extra Widening of Pavement at Curve as per IRC guideline is given below:
Radius of Curve (m) Upto 20 21 - 60 Above 60
Extra Widening for 3.75 m wide single lane carriageway, (m) 0.9 0.6 Nil
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor 0 Rural Development Division, 0 0
Chapter 8. Alignment Design
The basic aim of highway design is to identify technically sound, environment-friendly and economically feasible highway alignment. The ensuing sections deals with obligatory points, which control highway alignment, design of cross-section, highway geometric design & methodology, design of miscellaneous items.
The main components included in the highway design are:
Ø Cross-sectional elements
Ø Horizontal alignment
Ø Vertical profile
Ø Junctions and/or Interchanges
Ø Road furniture
Ø Miscellaneous items
8.2 Horizontal alignment
Table 8.1 – Features of Horizontal Alignment
Chainage Length Description Reason for deviation from existing alignment, if necessary
From (km) To (km) (km)
0.00 0.00 0.00 Built up N.R. Bhada 2600 2900
0.00 0.00 0.00 Agri. & govt. Land N.R. Improve the geometric of road so as to straight the alingement , that minimise the curve . Lohadiya 4800 5200
0.00 0.50 0.50 Built up N.R. Barbhatha 6400 6800
0.50 1.59 1.09 Agri. & govt. Land N.R.
1.59 3.00 1.41 Built up N.R.
3.000 2.700 -0.30 Agri. & govt. Land N.R.
2.700 3.240 0.54 Built up N.R.
3.240 3.500 0.26 Agri. & govt. Land N.R.
3.500 4.000 0.50 Built up N.R.
4.000 2.900 -1.10 Agri. & govt. Land N.R.
2.900 6.100 3.20 Built up N.R.
0 Agri. & govt. Land N.R.
0 Built up N.R.
0 Agri. & govt. Land N.R.
0 Built up N.R.
a) Centre line of the existing and proposed horizontal alignment coincide YES
b) Centre line of the existing and proposed horizontal alignment deviate at certain sections NO
Figure 8.1Schematic diagram showing location and offsets from existing alignment
Chainage LHS Existing alignment RHS Chainage shift Approx land required (m)
3.6 The centre line coincide with the existing alingement
2.4 The centre line coincide with the existing alingement
0.8 The centre line coincide with the existing alingement
Table 8.2 – Horizontal Curve details
Curve No. IP Chainage Radius Ls Speed Extra widening Def Angle Lc Ltotal Hand of Curve Ara of Extra widening
(m) (m) (Kmph) D M S (m) (m)
Table 2.16 . Minimum length of Transition Curve for Different Speeds and Curve Radii
Plain and Rolling Terain Mountainous and Steep Terrain
Curve Radius (m) Design Speed (km/h) Curve Radius (m) Design Speed (km/h)
Transition length (m) Transition length (m)
NA - Not Applicable NR - Transition Not required
Table 2.17 Widening of Pavement at Curve
Radius of Curve (m) Upto 20 21 - 60 Above 60
Extra widening for 3.75 m Wide single Lane Carriageway , (m) 0.9 0.6 Nil
Table 2.18 Recommended Set - back Distance for Single Lane Carriagway
Radius of Circular Curve(m) Set - Back Distance (m)
S=20m (V=20km/h) S=25m (V=25km/h) S=30m (V=30km/h) S=45m (V=40 km/h) S=60m (V=50km/h)
8.3 Vertical alignment
Table 8.3 – Vertical Curve Details
Sl. NO. Chainage (m) Level of pvi Length of curve Type of curve Grade in (%) Grade out (%) Grade difference (%) Chainage Level
St. of Curve End of Curve St. of Curve End of Curve
8.4 Design of Junctions
The proposed alignment intersects cross roads and forms junctions. The locations of junctions are given below:
Table 8.4 – List intersections, type and proposed modifications
Sl. Type of intersection Location (km) Exiting condition Proposed modification
1 T - junction 0.000 earthen Bell mouth joint provide
2 Y - junction 0.200 earthen Bell mouth joint provide
3 Y - junction 0.460 earthen Bell mouth joint provide
4 Y - junction 0.550 earthen Bell mouth joint provide
5 Y - junction 0.650 earthen Bell mouth joint provide
6 Y - junction 1.200 earthen Bell mouth joint provide
7 Y - junction 1.850 earthen Bell mouth joint provide
8 Y - junction 2.600 earthen Bell mouth joint provide
9 Y - junction 2.700 earthen Bell mouth joint provide
10 Y - junction 5.845 earthen Bell mouth joint provide
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor 0 Rural Development Division, 0 0
Chapter 10. Design of Cross Drainage Works
On the basis of hydrological survey, 5 no. culvert & 6 no. of field crossing on approach are proposed for the project road as listed below.
10.2 Hydrological Design
no field crossing are present on proposed road :
Agricultural conduits, which basically act as balancers, have also been provided as listed below in Table 10.2.
Table 10.2 ( Details of Agricultural conduits )
S.No. Chainage Dia (mm)
10.3 Design Feature
Design Standards for culverts has been prepared based on standard codes and guidelines of IRC: SP: 20: 2002 and similar type of ongoing projects. General features of the designed cross drainage structures are given below:
For hume pipe culvert, minimum road width has been taken as 7.50 m,
Width of culvert : 7.50 m with parapet.
Width of Bridge: 8.40 m with parapet
10.4 Justification for retaining/widening and replacement of culverts
no field crossing are present on proposed road :
S.No. Chainage Description of Existing Structure Provision
Type Span/ Dia. (m) Condition
1 66 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
2 786 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
3 1020 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
4 1100 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
5 1245 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
6 1583 HPC 1x600 mm Good Canal crossing
7 0 HPC 4Rx1000 mm Good 0
8 0 HPC 1x600 mm poor ( pipe Choke) 0
9 0 Field crossing 3Rx1000 mm poor 1x 3.00 m slab culvert
10 0 HPC 1Rx600 mm Good 0
11 0 HPC 1x600 mm poor ( pipe Choke) 1x1000 mm dia HPC
12 0 VCW 6Rx600 mm Good 0
13 0 HPC 2Rx1200 mm Poor 1x 6.00 m slab culvert
14 0 HPC 1x600 mm Poor 1x1000 mm dia HPC
15 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
16 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
17 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
18 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
19 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
20 0 HPC 1x600 mm Poor 1x1000 mm dia HPC
21 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
22 0 Slab culvert 1x1.00 m Poor 1x2.0 m slab culvert
23 0 HPC 1x1000 mm Poor 1x2.0 m slab culvert
24 0 FCW 20 m Poor 3x5.0 m slab culvert
25 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
26 0 HPC 1x600 mm Poor 1x2.0 m slab culvert
27 0 Slab culvert 1x1.00 m Poor 1x2.0 m slab culvert
28 0 FCW 30 m Poor 2x6.0 m slab culvert
29 0 FCW 20 m Poor 2x6.0 m slab culvert
30 #REF! #REF! #REF! #REF! #REF!
31 #REF! #REF! #REF! #REF! #REF!
32 #REF! #REF! #REF! #REF! #REF!
33 #REF! #REF! #REF! #REF! #REF!
34 #REF! #REF! #REF! #REF! #REF!
35 #REF! #REF! #REF! #REF! #REF!
36 #REF! #REF! #REF! #REF! #REF!
37 #REF! #REF! #REF! #REF! #REF!
38 #REF! #REF! #REF! #REF! #REF!
39 #REF! #REF! #REF! #REF! #REF!
Sub Engineer 0 VCW 6Rx600 mm Good 0
Rural Development Division, 0 HPC 2Rx1200 mm Poor 1x 6.00 m slab culvert
CGRRDA , 0 HPC 1x600 mm Poor 1x1000 mm dia HPC
0 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
0 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
0 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
18 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
19 0 Field crossing 1x600 mm Poor 1x1000 mm dia HPC
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
10.5 Hydraulic calculation for Culvert
The design discharge was calculated by the rational method considering peak runoff from catchment using the formula,
Q = 0.028 x P x A xIc
Where P = Coefficient of Run Off for the catchments characteristics, A = Catchments Area in Hectares & Ic = Rainfall Intensity
Small bridge-site length of which exceeds 15 m to be jointly visited by STA and S.E. Design – as per SP-20 & SP-13 and relevant IRC Codes for Bridges.
Causeways and submersible bridges – Design to be done as per SP-20 and SP-82:2005.
Detailed hydraulic calculation of all replaced and proposed new culverts and attached as Annexure-2 of this report.
List of c/d works proposed/upgraded, type, location, span/dia in a tabular form. This should connect to the decisions taken during transect walk.
Table 10.2 Proposed Culverts
Sl. Chainage Type Span/ Dia. (m)
1 66 HPC 1x1000 mm dia HPC
2 786 HPC 1x1000 mm dia HPC
3 1020 HPC 1x1000 mm dia HPC
4 1100 HPC 1x1000 mm dia HPC
5 1245 HPC 1x1000 mm dia HPC
6 0 HPC 1x1000 mm
7 0 Slab culvert 1 x 2.00 m
8 0 Slab culvert 1 x 2.00 m
9 0 Slab culvert 1 x 1.50 m
10 0 HPC 1x1000 mm dia HPC
11 0 Slab culvert 1 x 6.00 m
12 0 HPC 1x1000 mm
13 0 HPC 1x1000 mm
14 0 HPC 1x1000 mm
15 0 HPC 1x1000 mm
16 0 HPC 1x1000 mm
17 0 HPC 1x1000 mm
18 0 HPC 1x1000 mm
19 0 Slab culvert 1 x 2.00 m
21 0 Slab culvert 2 x 6.00 m
22 0 Slab culvert 2 x 6.00 m
23 0 HPC 1x1000 mm
24 0 Slab culvert 1 x 2.00 m
25 0 HPC 1x1000 mm
26 0 HPC 1x1000 mm
27 0 HPC 1x1000 mm
28 0 HPC 1x1000 mm
29 0 Slab culvert 1 x 3.00 m
30 #REF! #REF! #REF!
31 #REF! #REF! #REF!
32 #REF! #REF! #REF!
33 #REF! #REF! #REF!
34 #REF! #REF! #REF!
35 #REF! #REF! #REF!
36 #REF! #REF! #REF!
37 #REF! #REF! #REF!
38 #REF! #REF! #REF!
FC / treated as a Agricultural conduits ( 600mm dia ) :- 6 No.
Chainage in (m) Name of CD Catchment area in Hectare Bed level (m) HFL (m) RTL (m) Type of Culvert Opening provided ( Sq.m.) Water Way in (m)
Agricultural conduits (600 mm dia) :- Rd 903 , 1350 , 1980 , 2770 , 2860 , 2975 m
Agricultural conduits (450 mm dia) :- Rd 0, 2860 , 4325 , 4650 m
Agricultural conduits (300 mm dia) :- Rd 840 , 930 m
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x2.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 418 418.00
B. No. of 3/4 square 3/4x 18 13.50
C. No. of 1/2 square 1/2x 15 7.50
D. No. of 1/4 square 1/4x 9 2.25
Catchment area 176500 sqm
Step -1 Catchment area as per topo sheet 17.65 hect
or 0.1765 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 3.81 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 2.00 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.4000
Cross Section Area A= L x H
hence A= 3.60 Sqm
Step -4 hence discharge through1x 2.00 m Culvert Q1 = 4.31 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 2.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 130 130.00
B. No. of 3/4 square 3/4x 14 10.50
C. No. of 1/2 square 1/2x 15 7.50
D. No. of 1/4 square 1/4x 15 3.75
Catchment area 60700 sqm
Step -1 Catchment area as per topo sheet 6.07 hect
or 0.0607 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.71 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.91 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 140 140.00
B. No. of 3/4 square 3/4x 12 9.00
C. No. of 1/2 square 1/2x 14 7.00
D. No. of 1/4 square 1/4x 10 2.50
Catchment area 63400 sqm
Step -1 Catchment area as per topo sheet 6.34 hect
or 0.0634 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.77 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.91 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 139 139.00
B. No. of 3/4 square 3/4x 15 11.25
C. No. of 1/2 square 1/2x 10 5.00
D. No. of 1/4 square 1/4x 12 3.00
Catchment area 63300 sqm
Step -1 Catchment area as per topo sheet 6.33 hect
or 0.0633 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.77 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.86 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 131 131.00
B. No. of 3/4 square 3/4x 14 10.50
C. No. of 1/2 square 1/2x 15 7.50
D. No. of 1/4 square 1/4x 12 3.00
Catchment area 60800 sqm
Step -1 Catchment area as per topo sheet 6.08 hect
or 0.0608 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.71 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.84 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 132 132.00
B. No. of 3/4 square 3/4x 14 10.50
C. No. of 1/2 square 1/2x 16 8.00
D. No. of 1/4 square 1/4x 10 2.50
Catchment area 61200 sqm
Step -1 Catchment area as per topo sheet 6.12 hect
or 0.0612 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.72 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.88 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1.50 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 289 289.00
B. No. of 3/4 square 3/4x 10 7.50
C. No. of 1/2 square 1/2x 13 6.50
D. No. of 1/4 square 1/4x 9 2.25
Catchment area 122100 sqm
Step -1 Catchment area as per topo sheet 12.21 hect
or 0.1221 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 2.89 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 1.50 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.3000
Cross Section Area A= L x H
hence A= 2.70 Sqm
Step -4 hence discharge through1x 1.50 m Culvert Q1 = 3.20 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 1.50 M culvert
Step -6 Q< Q1 hencr safe
Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x3.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 825 825.00
B. No. of 3/4 square 3/4x 14 10.50
C. No. of 1/2 square 1/2x 16 8.00
D. No. of 1/4 square 1/4x 12 3.00
Catchment area 338600 sqm
Step -1 Catchment area as per topo sheet 33.86 hect
or 0.3386 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 6.21 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 3.00 M
Assumed Slab Culvert Height H= 2.10 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.7000
Cross Section Area A= L x H
hence A= 6.30 Sqm
Step -4 hence discharge through1x 3.00 m Culvert Q1 = 9.33 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 3.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 132 132.00
B. No. of 3/4 square 3/4x 15 11.25
C. No. of 1/2 square 1/2x 13 6.50
D. No. of 1/4 square 1/4x 11 2.75
Catchment area 61000 sqm
Step -1 Catchment area as per topo sheet 6.1 hect
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.72 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.88 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - #REF!
Step -1 Catchment area as per topo sheet 114 hect
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 15.45 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 6.00 M
Assumed Slab Culvert Height H= 3.00 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 1.5000
Cross Section Area A= L x H
hence A= 18.00 Sqm
Step -4 hence discharge through1x 6.00 m Culvert Q1 = 44.52 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 6.00 M culvert
Step -6 Q< Q1 hencr safe
consultant Sub - Engineer Assistant Engineer,
ROAD NAME - #REF!
Step -1 Catchment area as per topo sheet 123 hect
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 16.35 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 6.00 M
Assumed Slab Culvert Height H= 3.00 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 1.5000
Cross Section Area A= L x H
hence A= 18.00 Sqm
Step -4 hence discharge through1x 6.00 m Culvert Q1 = 45.72 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 6.00 M culvert
Step -6 Q< Q1 hencr safe
consultant Sub - Engineer Assistant Engineer,
ROAD NAME - #REF!
Step -1 Catchment area as per topo sheet 115 hect
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 15.55 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 6.00 M
Assumed Slab Culvert Height H= 3.00 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 1.5000
Cross Section Area A= L x H
hence A= 18.00 Sqm
Step -4 hence discharge through1x 6.00 m Culvert Q1 = 44.71 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 6.00 M culvert
Step -6 Q< Q1 hencr safe
consultant Sub - Engineer Assistant Engineer,
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x2.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 412 412.00
B. No. of 3/4 square 3/4x 18 13.50
C. No. of 1/2 square 1/2x 15 7.50
D. No. of 1/4 square 1/4x 12 3.00
Catchment area 174400 sqm
Step -1 Catchment area as per topo sheet 17.44 hect
or 0.1744 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 3.78 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 2.00 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.4000
Cross Section Area A= L x H
hence A= 3.60 Sqm
Step -4 hence discharge through1x 2.00 m Culvert Q1 = 4.62 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 2.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 143 143.00
B. No. of 3/4 square 3/4x 9 6.75
C. No. of 1/2 square 1/2x 14 7.00
D. No. of 1/4 square 1/4x 13 3.25
Catchment area 64000 sqm
Step -1 Catchment area as per topo sheet 6.4 hect
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.78 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.91 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x3.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 895 895.00
B. No. of 3/4 square 3/4x 19 14.25
C. No. of 1/2 square 1/2x 14 7.00
D. No. of 1/4 square 1/4x 11 2.75
Catchment area 367600 sqm
Step -1 Catchment area as per topo sheet 36.76 hect
or 0.3676 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 6.61 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 3.00 M
Assumed Slab Culvert Height H= 2.10 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.7000
Cross Section Area A= L x H
hence A= 6.30 Sqm
Step -4 hence discharge through1x 3.00 m Culvert Q1 = 9.09 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 3.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 138 138.00
B. No. of 3/4 square 3/4x 15 11.25
C. No. of 1/2 square 1/2x 13 6.50
D. No. of 1/4 square 1/4x 11 2.75
Catchment area 63400 sqm
Step -1 Catchment area as per topo sheet 6.34 hect
or 0.0634 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.77 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.86 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x2.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 427 427.00
B. No. of 3/4 square 3/4x 16 12.00
C. No. of 1/2 square 1/2x 13 6.50
D. No. of 1/4 square 1/4x 10 2.50
Catchment area 179200 sqm
Step -1 Catchment area as per topo sheet 17.92 hect
or 0.1792 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 3.86 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 2.00 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.4000
Cross Section Area A= L x H
hence A= 3.60 Sqm
Step -4 hence discharge through1x 2.00 m Culvert Q1 = 4.62 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 2.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Step -1 Catchment area as per topo sheet 75 hect
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 11.28 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 5.00 M
Assumed Slab Culvert Height H= 2.40 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 1.0000
Cross Section Area A= L x H
hence A= 12.00 Sqm
Step -4 hence discharge through1x 5.00 m Culvert Q1 = 22.08 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 5.00 M culvert
Step -6 Q< Q1 hencr safe
consultant Sub - Engineer Assistant Engineer,
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x3.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 816 816.00
B. No. of 3/4 square 3/4x 14 10.50
C. No. of 1/2 square 1/2x 12 6.00
D. No. of 1/4 square 1/4x 9 2.25
Catchment area 333900 sqm
Step -1 Catchment area as per topo sheet 33.39 hect
or 0.3339 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 6.15 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 3.00 M
Assumed Slab Culvert Height H= 2.10 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.7000
Cross Section Area A= L x H
hence A= 6.30 Sqm
Step -4 hence discharge through1x 3.00 m Culvert Q1 = 8.96 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 3.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x3.0 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 864 864.00
B. No. of 3/4 square 3/4x 17 12.75
C. No. of 1/2 square 1/2x 16 8.00
D. No. of 1/4 square 1/4x 8 2.00
Catchment area 354700 sqm
Step -1 Catchment area as per topo sheet 35.47 hect
or 0.3547 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 6.43 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 3.00 M
Assumed Slab Culvert Height H= 2.10 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.7000
Cross Section Area A= L x H
hence A= 6.30 Sqm
Step -4 hence discharge through1x 3.00 m Culvert Q1 = 8.89 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 3.00 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1.50 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 298 298.00
B. No. of 3/4 square 3/4x 12 9.00
C. No. of 1/2 square 1/2x 10 5.00
D. No. of 1/4 square 1/4x 13 3.25
Catchment area 126100 sqm
Step -1 Catchment area as per topo sheet 12.61 hect
or 0.1261 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 2.96 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 1.50 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.3000
Cross Section Area A= L x H
hence A= 2.70 Sqm
Step -4 hence discharge through1x 1.50 m Culvert Q1 = 3.15 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 1.50 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1.50 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 290 290.00
B. No. of 3/4 square 3/4x 11 8.25
C. No. of 1/2 square 1/2x 13 6.50
D. No. of 1/4 square 1/4x 12 3.00
Catchment area 123100 sqm
Step -1 Catchment area as per topo sheet 12.31 hect
or 0.1231 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 2.91 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 1.50 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.3000
Cross Section Area A= L x H
hence A= 2.70 Sqm
Step -4 hence discharge through1x 1.50 m Culvert Q1 = 3.29 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 1.50 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1.50 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 313 313.00
B. No. of 3/4 square 3/4x 9 6.75
C. No. of 1/2 square 1/2x 10 5.00
D. No. of 1/4 square 1/4x 13 3.25
Catchment area 131200 sqm
Step -1 Catchment area as per topo sheet 13.12 hect
or 0.1312 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 3.05 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 1.50 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.3000
Cross Section Area A= L x H
hence A= 2.70 Sqm
Step -4 hence discharge through1x 1.50 m Culvert Q1 = 3.32 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 1.50 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1.50 m span slab culvert Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 285 285.00
B. No. of 3/4 square 3/4x 14 10.50
C. No. of 1/2 square 1/2x 13 6.50
D. No. of 1/4 square 1/4x 10 2.50
Catchment area 121800 sqm
Step -1 Catchment area as per topo sheet 12.18 hect
or 0.1218 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 2.89 Cum / Sec
Dischrege through Slab Culvert as per mannings equation = velocity X C/S = Ax V
Assumed Slab Culvert Span L= 1.50 M
Assumed Slab Culvert Height H= 1.80 M
Velocity in pipe V= 1/n(R 2/3) S 1/2
n= as per IRC SP 42 0.022
R= Hydrolic radius = Area / perimeter= (d/4) 0.3000
Cross Section Area A= L x H
hence A= 2.70 Sqm
Step -4 hence discharge through1x 1.50 m Culvert Q1 = 3.35 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1x 1.50 M culvert
Step -6 Q< Q1 hencr safe
Consultant Sub - Engineer Asst. Engineer
ROAD NAME - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Design for 1x1000 mm Dia HPC Scale : 1 cm = 20 mt
Calculation of Catchment area
A. No. of Full square 1 x 132 132.00
B. No. of 3/4 square 3/4x 11 8.25
C. No. of 1/2 square 1/2x 14 7.00
D. No. of 1/4 square 1/4x 10 2.50
Catchment area 59900 sqm
Step -1 Catchment area as per topo sheet 5.99 hect
or 0.0599 Sq-km
Maximum peak discharge (design discharge) for the Catchment area for a frequancy of 10 years from Dickens discharge
Step -2 Method given in IRC SP 13 Q= CM3/4 Cum / sec
M= Catchment area in Sq-Km
Hence Design discharge Q= 1.70 Cum / Sec
Dischrege through Single Pipe as per mannings equation = velocity in pipe X C/S of pipe
A = Area of 1 pipe of 1000 mm dia
V = Velocity in pipe
n= as per IRC SP 42 = 0.012
R= Hydrolic radius = Area / perimeter = 0.25
Step -4 hence discharge through 1x1000 mm Dia pipe Q1 = 1.88 Cum/sec
Step -5 Since design discharge Q less than Q1 hence provide 1 Row of 1000mm Dia Pipe Culvert
Step -6 Q< Q1 hence safe
Consultant Sub - Engineer Asst. Engineer
Chapter 11. Protective Works & Drainage
The terrain of road is plain. Protection work needed at pond. Concrete drain required in village portion parallel of rigid pavement.
11.2 Road side drain
As the insufficient drainage of surface water leads to rapid damage of road, road side drain as shown in drawing volume has been provided particularly on the location of habitation areas . Sketch for a standard roadside drain should be made available, confirming to any of the sections suggested in SP:20:2002.
S.No. From To Side Total length(m) 250 496
6 0 0 Both Side LHS 0 2485 2577
8 #REF! #REF! #REF! LHS #REF! 3136 3414
9 #REF! #REF! #REF! LHS #REF! 3310 3220
13 0 0 Start point LHS 0
Total length (m ) 440
11.3 Protective Works
Necessary protection works consisting of closed Retainig Walls{PCC Retaining Wall} , have been provided near pond and water bodies falling within the proposed alignment. Table 11.1 gives the chainage-wise protection works adopted.
Table 11.1 List of protective works
S.No. Type of protective works from To Length (m) Side Comments
1 Retaning wall 1580 1650 140 Both side
0 0 0 Both side
0 0 0 Both side
0 0 0 Both side
0 0 0 Both side
0 0 0 Both side
0 0 0 Both side
2 Toe wall 1245 1315 140 Both side
0 0 0 Both side
0 0 0 Both side
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Drawings of Protective works
Typical Cross Section of Retaning Wall Typical Cross Section of Toe Wall
Typical Cross Section of C.C. Drain
Retaining Wall Design
Depth to underside of base dbase = 0.00 m
Thickness of base tbase = 0.20 m
Height of wall above foundation hwall = 3.00 m
Breadth of base bbase = 1.70 m
Breadth of top btop = 0.40 m
Concrete weight density γconc = 23.50 kN/m3
Water weight density γwater = 9.81 kN/m3
Weight density γfill.dry = 16.15 kN/m3
Shearing resistance φfill = 35.00 º
Effective cohesion c'fill = 0.00 kPa
Foundation soil
Weight density γfdn = 16.15 kN/m3
Shearing resistance φfdn = 35.00 º
Effective cohesion c'fdn = 0.00 kPa
Design Results:
Applied surcharge q = 0.00 kPa EQU: Overturning 3.28 (OK)
GEO: Sliding: DA1, Cbntn 1: 2.52 (OK)
GEO: Sliding: DA1, Cbntn 2: 2.08 (OK) (Governs)
Enter values into blue fields. #VALUE!
Initial Calculation
Wall dimensions:
height of sloping portion, hsloping hsloping = 2.50
Wall area 1, A1 Area1 = 1.50
Wall area 2, A2 Area2 = 1.00
Wall area 3, A3 Area3 = 0.32
Total: Awall = 2.82
2. Representative actions
Self-weight of wall:
Wall area 1, W1 Gvk.1 = 35.25
Wall area 2, W2 Gvk.2 = 23.50
Wall area 3, W3 Gvk.3 = 7.52
Total: Gvk.wall = 66.27
3. Characteristic material properties
Concrete weight density γk.conc = 23.50 kN/m3
Weight density γk.fill.dry = 16.15 kN/m3
Shearing resistance φk.fill = 35.00 º
Effective cohesion c'k.fill = 0.00 kPa
Foundation soil
Weight density γk.fdn = 16.15 kN/m3
Shearing resistance φk.fdn = 35.00 º
Effective cohesion c'k.fdn = 0.00 kPa
Check against sliding and overturning
Active earth pressure coefficient Kad.fill = 0.271 = 1-sinQ/1+sinQ
Angle of interface friction δd = 23.45 = 0.67Q
Weight density γd.fill = 16.150 =
Self-weight of wall:
Wall area 1, W1 Gvk.1 = 35.25
Wall area 2, W2 Gvk.2 = 23.50
Wall area 3, W3 Gvk.3 = 7.52
Total: Gvk.wall = 66.27
Active earth pressures
Active lateral earth pressure (fill) pfdn1 = 11.82 = Kad.fill * γd.fill * hwall
Active lateral earth pressure (fndtn soil) pfdn2 = 0.00 = Kad.fill * γd.fill * dbase
Active lateral earth pressure pbase = 0 = pfdn2 +( γfdn * Kadfdn * dbase )
Active thrust behind wall (permanent - unfavourable)
Active earth pressure 1 Pa1 = 15.95 = 0.5 * pfdn1 * hwall
Active earth pressure 2 Pa2 = 0.00 = 0.5 * (pfdn2 + pbase) X dbase
Total horizontal thrust Hd = 15.95 = Pa1 + Pa2
Sliding resistance
Horizontal resistance Rhd.base = 28.75 = Gvk.wall * tan δd
Factor of safety against sliding = Fs = 1.80 = Rhd.base / Hd > 1.5
Pa due to fill LPa = 1.67
Destabilising mmt due to fill Mdst1.b = 26.59 Lpa * Hd
Wall area 1 Lwall1 = 0.80 = (2/3)*(bbase-btop)
Wall area 2 Lwall2 = 1.40 = (bbase-btop)+(btop/2)
Wall area 3 Lwall3 = 0.80 = bbase/2
Stabilising mmt due to Area 1 Mstb1 = 37.07 = Gvd1*Lwall1
Stabilising mmt due to Area 2 Mstb2 = 39.48 = Gvd2*Lwall2
Stabilising mmt due to Area 3 Mstb3 = 6.79 = Gvd3*Lwall3
Total stabilising moment Mstb = 83.34 = Mstb1 + Mstb2 + Mstb3
Factor of safety against overturning = Fo = 3.13 = Mstb / Mdst1.b > 1.5
Uplift pressure P=Yw.h.A Yw 10
Weight of structure 7.52
Factor of safety against Uplift pressure = Fu = 2.35 = Pstb / Pfnd > 1.2
Chapter 12. Specification
The “Specification for Rural Roads” published by Ministry of Rural Development, behalf of the Govt. of India IRC SP 20-2002,IRC SP 72-2015, and IRC SP 62-2015 has been followed along with IRC:37-2012 and various IRC codes for different parts.
12.2 Construction Equipment
Construction by manual means and simple tools has been considered for the project as per the guideline of NRRDA. For handling of bulk materials like spreading of aggregates in sub-base & base courses by mix-in-place method, use of motor grader & tractor-towed rotavator has been allowed in line with the schedule of rate for PMGSY work. Compaction of all items shall be done by ordinary smooth wheeled roller if the thickness of the compacted layer does not exceed 100 mm. It is also considered that, hot mix plant of medium type & capacity with separate dryer arrangement for aggregate shall be used for bituminous surfacing work that can be easily shifted. A self-propelled or towed bitumen pressure sprayer shall be used for spraying the materials in narrow strips with a pressure hand sprayer.
Now the vibratory rollers are also being used for rapid progress.
For structural works, concrete shall be mixed in a mechanical mixer fitted with water measuring device.
The excavation shall be done manually or mechanically using suitable medium size excavators.
12.3 Construction Methods
12.3.1 Preparation for Earthwork
After setting out existing ground shall be scarified to a minimum depth of 150 mm and leveled manually and compacted with ordinary roller to receive the first layer of earthwork. In filling area, existing embankment will be generally widened on both sides as per the alignment plan. Continuous horizontal bench, each at least 300 mm wide, shall be cut on the existing slopes for bonding with the fresh embankment/ subgrade material as per Cl 301.7.
12.3.2 Embankment work
Material from borrow pits will be used for embankment construction as well as the approved material deposited at site from roadway cutting and excavation of drain & foundation may be used. Layer of the earth shall be laid in not more than 25 cm (loose) thick layers & compacted each layer of the soil up to 30 cm below the subgrade level at OMC to meet 97% of Standard Proctor Density.
Material for embankment and sub-grade shall satisfy the requirements of Table 300-1 and 300-2 as per the Specification for Rural Roads.
12.3.3 Sub-grade
Material of specified CBR as per design will be used for construction of top 30 cm as sub-grade for road designed upto 2 MSA and 50cm. for roads designed for more than 2 MSA. Soil in these sections is quite good for road construction. Top 30 cm upto the sub grade level and shoulder at OMC to meet 100 % of Standard Proctor Density by proper control of moisture and by required compaction with a smooth wheeled roller.
12.3.4 Sub-base
Sub base material in the form of stone aggregates and sand as available in the area to be used in GSB Grade III layer.
Wet mix Macadem will be used in base course.WMM layer has to be done grading should be as per Section 400(Table 400.12) of MORD specification and fraction passing 425 micron sieve should have PI less than 6. WMM should be allowed only with WMM plant and spreading with Paver or Motor grader. 100% compaction OMC is required.
12.3.6 Shoulder
Earthen shoulder shall be constructed in layers and compacted to 100% of Proctor’s Density. First layer of shoulder shall be laid after the sub–base layer is laid. Thereafter earth layer shall be laid with base layer of pavement and compacted.
12.3.7A Structural Bituminous layer BM/ DBM/ SDBC/ BC etc.
12.3.7 Surfacing
Slow setting bitumen emulsion will be applied as primer on Wet mix Macadam (WMM) layer. Emulsion shall be sprayed on surface with pressure distributor. Rapid setting bituminous emulsion shall be used for Tack coat. To ensure proper quantity of Emulsion for primer and Tack Coat Engineer incharge will check the length of spreading for one drum of Emulsion as per carriageway width.
50 mm BM shall be laid as surfacing course. 20 mm PMC with 6 mm thick Type B seal coat is considered for sealing BM.
12.3.8 Structural Works
Following grades of concrete are proposed for Structural works and comply with MORD and IRC specifications:
• Concrete in superstructure of slab culvert – M-25(RCC)
• Concrete in abutment cap, dirt wall of slab culverts – M-15} (RCC)
• Concrete below abutment, return wall, headwall – M-15 (RCC)
• Rigid pavement – M 30
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 12. Land Requirement
The existing road is earthen road . Thus the project road is a new connectivity road. The existing Right of Way (ROW) is varying from 6.0 m to 7.5 m.
12.2 Proposed ROW
The width of carriageway has been considered as 3.75 m in accordance with the IRC-SP:72: 2015. The total roadway width is limited to 7.50 m with 1.875 m shoulder on either side of carriage way. The proposed ROW generally varies from 10 m – 12 m depending upon the embankment height .
12.3 Additional Land
Local administration and local panchayat need to apprise the villagers about requirement of minor areas in places for development of the road. Villagers are generally highly enthusiastic during site visits for selection of the road. Table 12.1 provides the chainage-wise additional land required.
Table 12.1 Additional Land Required
Sl. No. Chainage Width of Land Required in m Comments
1 10 0.8 0.7 Sufficent land width is available to construct the road
10 1800 1.5 1.5 Sufficent land width is available to construct the road
20 3800 1.2 1.6 Sufficent land width is available to construct the road
31 5900 1.5 1.3 Sufficent land width is available to construct the road
43 8400 2.3 2.5 Sufficent land width is available to construct the road
53 10400 2.2 2.2 Sufficent land width is available to construct the road
59 11600 2.2 2.4 Sufficent land width is available to construct the road
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor 0 0 0 Rural Development Division,
Chapter 13. Environmental Issues and Mitigation measures
The proposed road has planned to be designed considering the impact on environment. Proposed road alignment follows existing pathway to the maximum extent so that huge land acquisition is not necessary for construction of the project road. Proposed road, when completed, will be an addition to the aesthetics of this rural area.
13.2 Environmental Sensitive Area (National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc.)
The alignment will be finalized avoiding the environmental sensitive areas such as National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc. It is also necessary to maintain the minimum distance of 500 m of the project road from environmental sensitive area.
13.3 Construction Camp
Construction camps will be established away from forest area/water body. The minimum facilities such as water supply, sanitation, storm water drainage, solid waste management and first aid box will be provided during the construction period of the project. Necessary provision for rehabilitation or restoration after the completion of construction phase will be done.
13.4 Permit / Clearance required prior to commending of civil work
· Forest Department- If the project road passing thorough forest land and acquisition of the same is involved and it will be taken by PIU from Forest Department
· Lease from Mines & Geology- This will be taken by the Contractor for new Stone Quarry required for the project.
13.5 Borrow area
The filling soil will have to be procured from borrow pit. Borrow area will be so excavated that the lands can reused as agricultural field. The depth of borrow pit shall not exceed 450 mm (150 mm top soil included). The top soil shall be stripped and stacked and shall be spread back on the land. As far as possible the borrow pits shall not be dug close to the road embankment. The Redevelopment of borrow area will be done before closure of the same and it will be as per agreement between landowner and the Contractor.
13.6 Erosion Control
Turfing of the embankment slopes and earthen shoulder to prevent erosion of slopes of the embankment, rain cuts and erosion of shoulder is being suggested.
Suitable cross drainage structures have been provided on the basis of hydrological survey of the area. So, there will be no obstruction to the natural drainage of the area. Road side drainage is also duly considered in a manner so that surface water is led to the low points and is drained through the CD structures.
13.8 Use of Material
Cut back bitumen is not proposed in the project to avoid contamination with Kerosene. Bitumen emulsion is proposed for primer coat and tack coat.
RURUAL ROADS : ENVIRONMENTAL CHECKLIST
Road Name :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Block Name :- Thakatpur
District Name :- Bilaspur
Total Length of Road :- 2.13 Km
A. Climatic Conditions
Temperature High 46.20 C Low 110 C
Humidity High 35% Low 87%
Rainfall 900-1200MM/ year
Rainy Season June to September
B. Location of the Road
Type of Ecosystem Yes NO Explanation
Coastel area Mangrove ( along road side ) Distance from Coastline Km
( ) more than 50 ( ) less than 20%
Hilly/Mountainous area ( Explain the topography of the area and how many km of the road are located in the hilly area) Altitude :
Forest Area (Explain whether the road passes through forest areas or located along the forest areas and distance from shoulder the forest area)? Density/ Vegetation Coverage Type of Vegetation : Tropical Deciduous forest Legal Status of the Forest Area. (Reserve, National Park, Sanctuaries, Unclassified, etc.)
Lake/ Swamp (Explain the distance of the Road shoulder from the edge of the Lake) Size of the Lake : Status of the Lake: unprotected
Size of the Lake : Status of the Lake:
Inhabited area Both side of the project road is populated from
Agricultural Land Some patches along the road is having agruculture field
C. Description of the Road Environment
Parameter/ Component Yes NO Explanation
Is the area along the project road prone to landslide problems
Is the area along the project road prone to Flooding problems
Along the Road and withing 500m of the road shoulder is there any area with natural habitat ?
( ) No Secondary information is available and local Community is not aware of this matter
Along the road and withing 500m fo the road shoulder is there any species of the flora and fauna that is classified as endangered species?
( ) No secondary information Available and local communnity is not aware of this matter
Along the road and within 500m of the road shoulder, is there any faunal bredding ground?
( ) No secondary information Available and local communnity is not aware of this matter
Alomg the road and within 500m of the road shoulder, is there any bird Migration area ?
Barren Land ( ) No secondary information Available and local communnity is not aware of this matter
D. Impact and proposed Mitigation Measures
Parameter/ Component Yes NO Explanation
Encroachment on Histrorical/cultural areas? NO
Disfiguration of Landscape by road embankments, cuts, fills, and quarries NO
Encroachment on precious ecology (e.g. sensitive or protected areas)? NO
Alteration of surface water hydrology of waterways crossed roads resulting in increased sediment in stream NO
Deterioration of surface water due to sanitary wastes from worker- based camps and chemicals used in construction Yes Proper storage facility fo sanitary waste and chemicals and further disposal in proper way need to arrange basically during the construction near public ponds
Inconvenient environmental condition due possible of communicable diseases from workers to local populations? Yes Health check-up of the migrated labors to avoid spread up of communicable diseases
Deterioration of surface water due to silt runoff? NO
Increased local air pollution due to rock crushing, cutting and filling works, and chemicals from asphalt processing? Yes Regular Sparkling of water in the project road to avoid such situation.
Noise and vibration due to blasting works? NO
Inconvenience due to land slide or erosion? NO
Dislocation or invluntary resettlement of people NO
Other social concerns relating to inconveniences in living conditions in the project areas may trigger cases NO
Creation of temporary breeding habitats for mosquito vector of disease? Yes To avoid such situation, side drain should be cleared and there should not be any room for water logging
Accident risks associated with increased vehicular traffic leading to loss of life? Yes Traffic sign are neeed to be placed near schools, hospitals and before starting of the residential area
Inconvenience due to transportation of construction materials NO
E. Public Consultation
Consultation Activities Yes NO Remarks
Consultation with local community was conducted before finalizing the alignment Yes The local people welcome the project and request for minimal damage to the road side plantation.
Any suggestion received in finalizing the alignment NO
if suggestions received do they get incorporated into design?
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 14. Analysis of Rates
Rates for various item of works for Construction of Earth Embankement by NAREGA have been derived from the SOR enforcd by Jilla Panchyat Bilaspur under NAREGA
Rates for various item of works of the project have been derived from the “Schedule of Rates {SOR 2025} for Road works, Culvert works & Carriage etc. {Published by CGRRDA} .
All items and rates taken as Per PMGSY SOR ( 2025) and no extra item taken other from SOR.
1) a)"Specifications" refer to the "Specifications for Rural Roads" published by the Indian road Congress August'2004, on behalf of the Govt. of India Ministry of Rural Development. "Specifications" refer to the "Specifications for Rural Roads" published by the Indian road Congress August'2004, on behalf of the Govt. of India Ministry of Rural Development.
(b) "Clause" refer to clauses of the specifications referred to in note (a) above.
(c) "Engineer-in-charge" would refer to the Executive Engineer of the Project Implementation Unit.
(d) "Table" refer to the table of the aforesaid specifications.
2) The rates of all items include element of setting out and carrying out the work in narrow or part width, of road, where directed unless specified.
3) The measurement of excavation above water level and below water level shall be recorded separately. The no extra rates for dewatering, shoring and shuttering shall be paid.
4) In the absence of any stipulation to the contrary, unit rates for different items of work are for completing the works to the specifications i/c full compensation for all operations detailed in the relevant sections of the specifications under "Rates". The rates are to be considered as the full rates for the finished work covering all labour, material, royalties, lease, rent, wastage, temporary work, plant, equipment, overhead charges and profit, unless otherwise specified.
5) Mode of measurements shall be as per provisions contained in the relevant clauses of the specifications unless specified otherwise.
6) The Rates include the element of hire and running charges of all types of plant, machinery and equipment required to complete the work unless specified otherwise. Royalty, octroi-duty and all other taxes are included in the rates.
7) The rates include making arrangement of traffic as per clause No. 111 and its sub clauses.
8) The rates also include the element of testing of samples of various materials brought by the contractor for use on the work as well as other tests for items of work as stipulated in the specifications. Frequency of such tests to be carried out must not be less than the prescribed frequencies. Copies from Registers containing records of tests shall have to be presented alongwith running account bills. Actual consumption of materials like bitumen, cement and steel be worked out in each running bill before making payment. Register (Original) shall have to be submitted alongwith the final bill. Tests of the material shall have to be conducted by the contractor's engineer under the supervision of the consultant & authorised representatives of PIU.
9) Confirming to IS specifications duly tested DGS&D reinforced cement concrete hume pipes shall be used in construction of roads. The testing certificate of DGS & D will be kept on record before making payment of item of such hume pipes.
10) Whenever existing road is to be widened, sides shall be cut in steps of 15 cm thickness and rate for cutting of earth and its filling with compaction to required density shall be payable as per items of excavation and compaction (Item 3.4 and 3.2 respectively).
11) Metal to be used for all bituminous courses and cement concrete shall be crushed in mechanical crushers.
12) The works of shoulders must precede the work of sub-base and base courses and succeed the bituminous courses and cement concrete pavement.
13) Wherever an existing boulder soling or WBM pavement is required to be excavated, it shall be presumed that the following quantities of rubble and coarse aggregates would be available for re-use and issued to the contractor at the rate indicated against each: -
a) Rubble :- 1 Cubic meter of rubble for every cubic meter of excavated boulder soling @ Rs. 115 per cubic meter. b) Coarse Aggregate :- 1.10 Cubic meter for every cubic meter of excavated WBM @ Rs. 120 per cubic meter. (Excavated WBM should be screened to segregate metal from moorum/screening before re-use)
14) For each compacted cubic meter or square meter as the case may be, of items of bituminous, base and surface courses the approximate loose quantities required will be 1.4 cubic meter unless other wise specified
15) Bitumen & modified bitumen shall be obtained from Govt. refinery and bitumen emulsion from reputed Manufacturer having ISI marks.
16) In case of any contradiction in the provisions of the specifications and this schedule of rates, the provision of the later would take precedence.
17) Dismantling of utilities will be done under the supervision of concerned departments with prior information to the users.
18) For narrow and restricted areas, plate compactors shall be used for compaction to achieve the desired density.
19) The actual quantities of materials shall be as per job mix formula for bituminous works.
20) Latest I.R.C. Codes shall be followed
21) The girth of trees shall be measured at 1.00 Meter (One Meter) above ground level.
22) All wood obtained from the cutting of trees shall be property of the government and shall be deposited at PIU store as per direction of Engineer-in-Charge.
23) The rates of loading and unloading of various items include stacking also
24) The rate of haulage are for short lead i.e. upto 10 Km only.
25) Where only grass wild growth is met with, rate of item No.2.1, i.e., clearing grass and removal of rubbish should be applied.
26) In case excavated rock is found suitable for use in works, it will be available to the contractor for its use on the work free of cost.
27) Spreading of bituminous materials shall be done by mechanical means except in areas where a mechanical paver cannot have access
28) Use of cement concrete pavement for rural roads is likely to be limited to small stretches. Accordingly, the rate analysis is based on concrete mixer of suitable capacity with weigh batcher, fixed side forms and screed, plate and needle vibrators.
29) The size and location of traffic signs shall be as per IRC:67
30) All concrete should be mixed in mechanical mixers
31) The cost of formwork is included in the rate of concrete.
32) The items of foundation include works below bed level or ground level as the case may be. The items of sub structure include work between top of the foundation and bottom of the soffit and items of super structure include soffit and above. There will be no super structure items for pipe culverts.
33) There are 3 different type of rates in chapter 3 for earthwork of different nature. Item no. 3.3 is applicable for Construction Embankment with approved soil with all leads . The rates of item no. 3.11 will be applicable for construction of subgrade and earthen shoulders beside GSB. The rates of item no. 3.4 and item no. 3.2 will be applicable for excavation of local soil & excavation for widening of carriage way, road cutting and its used in embankment.
14.2 Basic Rates for Material
Rates for various item of works of the project have been derived from the “Schedule of Rates {2025} for Road works, Culvert works & Carriage etc. {Published by Chief Engineer, CGRRDA} .
14.3 Lead for Materials
For Stone aggregate and sand , lead from source to work site is calculated from the district map and block level map of core network and finaliizing the same in discussion with PIU. The supply of different materials to worksite is by road . Lead for bituminous & Steel materials are similarly obtained using SOR inforced by Feb. 2018.No Extra item other than SOR are taken in Estimate.
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 15. Cost Estimate
Cost Estimate of project has been arrived on the following basis
• Selection of Items of work
• Estimation of item wise quantities
• Analysis of Rates
15.2 Estimation of Quantities
All the relevant road and structure work Items will be identified as per survey, design and drawings. Following major item of works considered are given below:
• Site clearance, dismantling and earthwork
• Pavement works (GSB, WBM, Bituminous layers)
• Cross drainage structure works
• Drainage and protective works
• Utility relocation
• Road safety and furniture
• Maintenance works
Quantity of earthwork will be derived from the proposed cross section drawings. Volume of cut and fill will be obtained directly using the design package software. Quantity derived from software will be manually verified. There are same stretches of the road in cut section. The details are provided chainage wise in Table-18.1 of total cut and fill volume. The soil obtained from roadway excavation shall be used for construction of embankment and shall be paid as per item no.4. All other quantities will be computed from the drawings of finished road, miscellaneous drawings & drawings of CD Structures.
{Enclosed- Table of cut and fill volume in Annexure 3}
15.3 Abstract of Cost
Unit rates will be derived by using the “Schedule of Rates for Road Works, Culvert works and Carriage etc. CGRRDA}”. The abstract of Cost estimate is given in the Table below.
{ Enclosed- the details of cost in Format F6 & Format F7}.
15.4 Maintenance
Cost of Annual Maintenance for five years after completion of project will be estimated as per the PMGSY Guidelines. Different activities of ordinary repairs are done as and when.
{ Enclosed- total Cost of 5 year Routine Maintenance Works in Format F6}.
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, RDD
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
Chapter 16. Construction Program
Assuming that the Construction of the PMGSY roads will start from May 2026. This is a normal rainfall area and rainy season exists from June to September. However, the construction program is based for a total working period of 12 months, considering the program set out by MoRD. Generally, dry working season of about 8 months are required for construction of PMGSY roads. However, works will be affected for the monsoon during the month June to September.
It is anticipated that some activity like collection of materials, CD works etc. will continue in monsoon period also.
16.2 Realistic duration
Enclosed- Construction Program Chart
Note :-The proposed construction program is tentative and may vary depending upon sanction of the project & e-procurement process to be followed later
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
FORTNIGHT CONSTRUCTION PROGRAME
16.1 Months 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th
1 Site & Lab. Establishment
2 Site Clearence
3 Initial Survey
6 Earthen Shoulder
10 Hard Shoulder
17 Protection Work
18 Road Furniture
Rural Development Division,
CGRRDA , Bilaspur
Chapter 17. Undertaking for future Maintenance
Routine Maintenance of various items of work is required regeuarly . A chart for Periodicity of Routine Maintenance activities for differt item ( as per IRC : SP : 20 - 2002 , Appendix - 11.1) is as follows
S.No. Name of Item Frequency of operation in the year
1 Clearing road side gutters Twice
2 Pothole filling ( WBM & BT ) Once
3 Filling up edges of asphalt surface of excavating borrow pit . (i) Single lane
(a) T.I. 0-1000 Twice
(b)T.I. 1000-5000 four times
4 Dressing of berms Once
5 White washing guard stones Twice
6 Fixing disturbed caution board/ village name board/Speed limit board etc. Once
7 Refixing displaced guard stones Once
8 White washing and geroo pending of trunks of trees Once
9 Cutting of branches of trees etc. Once
10 Topping of WBM blindage operation including picking of loose metal 18 times
11 Maintenance of catch water drains Once
12 Clearence of C.D. works Twice
13 Clearing of wild seasonal growth on berms Once
14 White washing parapets of C.D. Works Once
15 Earthwork in berms , deilting of drains , etc. As per requirement
Note :- T.I. - Traffic intensity in tonnes per day
Fund required for Routine Maintenance is provided by State Government as follows
Sr.No. Description Length Unit Rate Amount
1 Maintenance of Road for Ist Year after Construction 2.13 Km 30000 63900 30000
2 Maintenance of Road for IInd Year after Construction 2.13 Km 40000 85200
3 Maintenance of Road for IIIrd Year after Construction 2.13 Km 70000 149100 40000
4 Maintenance of Road for IVth Year after Construction 2.13 Km 110000 234300
5 Maintenance of Road for Vth Year after Construction 2.13 Km 160000 340800 70000
Total Rs. 873300
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, RDD
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
PRADHAN MANTRI GRAM SADAK YOJANA
Name of Road :-From Rajpur Sidhbaba road to Bijaghora Pahuch marg GST 18%
Length (Km. ) :- 2.130 Km. Block :- Thakatpur District:- ='Basic Sheet'!M6
Upgrade Thakatpur
New 2.130 Road No. Consultant Anand Vibhor
Design CBR 10 % CG SOR 2025
CBR Value Length CBR CH
1 5.46 400 11931.18 Embankment Filling Qnty 0 Lay bay
2 5.49 2130 Total Length ( M ) 400 earth Drain 1500 0.00 1 Inaugration Stone
3 5.28 0 2100 0.00 Hilly Cutting length 1 Speed Breaker
4 0.00 0 0 353.36 Embankment Cutting Qnty 140 Retaining Wall
5 0.00 0 C.C Road Length (m) 440 Drain(BT) 0 6.00 No of Field Crossings 600 mm 140 Toe Wall
6 0.00 0 Scarifying of WBM Road (m) 0 Drain(CC) 0 0.00 No of Field Crossings 450 mm 0 Pitching Length ( M )
7 0.00 0 Exiting ( if any ) ( M ) 0 0.00 No of Field Crossings 300 mm
8 0.00 0 Dismantle of CC Road (m) 0 Road Furniture Cautionary, Mandatory 18 No 180 Boundery
9 0.00 Pavement Length:- 2130 0
11 0.00 Thickness Quick Accesses
0.00 0.345 Total Crust Thickness General Abstract Wearing Course (m)
0.175 G.S.B. Thickness Drain. Layer Pavement Estimate Filler Joint (Nos)
0.150 WMM if provide CC Estimate M-15 Approch Slab (m)
0.000 Sub Grade/Modified Soil RCC M-25 Approch Slab (m)
Traffic Design Shifting of Electric pole 0
S.T. A Chick List Distances 25
Sand Arpa river
Quarry Stone Daija Moorum Local
Culvert Details Distances 10 2
5 1000 mm HPC FCW
0 1x 1.0 m Slab Culverts 0 1x 5 m SC
0 1x 1.5 m Slab Culverts 0 1x 2 m SC Result of Road Cost
0 1x 3.0 m Slab Culverts
0 1x4.0 m Slab Culverts 0 3x5.0 m Slab Culverts
0 2x5.0 m Slab Culverts Cost Per Km
0 1x6.0 m Slab Culverts CD Cost 0 Lakha
0 2x6.0 m Slab Culverts CC Road Lakha
0 3mx3mx5nobox Culverts Total Cost 0.000 Lakha
No of Existing Culverts All
Department officials Village Area From To Unconnected Habitation
CGRRDA Chhattisgarh Rajpur 0 100 100 Popula
EXECUTIVE ENGINEER Bijaghora 1650 2130 480
GOVT OF CHHATTISGARH 0 0 0 0
CHHATTISGARH RURAL ROAD DEVELOPMENT AGENCY CC drain Side of CC 0 #VALUE!
DEPARTMENT OF PANCHAYAT AND RURAL DEVELOPMENT Both Side 0 0 0
MPRRDA MP 0 0 0 0
GENERAL MANAGER 0 0 0 0
GOVT OF MADHYA PRADESH 0 0 0 0
MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY 0 0 0
EXECUTIVE ENGINEER 0
GOVT OF CHHATTISGARH 0
CHHATTISGARH RURAL ROAD DEVELOPMENT AGENCY #VALUE!
PRADHAN MANTRI GRAM SADAK YOJANA
Name of Road :-From Rajpur Sidhbaba road to Bijaghora Pahuch marg GST 18%
Length (Km. ) :- 2.130 Km. Block :- Thakatpur District:- Bilaspur
Upgrade Thakatpur Bilaspur
New 2.130 Road No. Consultant Anand Vibhor
Design CBR 10 % CG SOR 2025
CBR Value Length CBR CH
1 5.46 400 11931.18 Embankment Filling Qnty Lay bay
2 5.49 2130 Total Length ( M ) 400 earth Drain 1500 1 Inaugration Stone
3 5.28 2100 Hilly Cutting length 1 Speed Breaker
4 0.00 0 353.355 Embankment Cutting Qnty 140 Retaining Wall
5 0.00 C.C Road Length (m) 440 Drain(BT) 0 6 No of Field Crossings 600 mm 140 Toe Wall
6 0.00 Scarifying of WBM Road (m) 0 Drain(CC) 0 No of Field Crossings 450 mm Pitching Length ( M )
7 0.00 0 Exiting ( if any ) ( M ) 0 No of Field Crossings 300 mm
8 0.00 Dismantle of CC Road (m) Road Furniture Cautionary, Mandatory 18 No 180 Boundery
9 Pavement Length:- 2130
11 Thickness Quick Accesses
0.345 Total Crust Thickness General Abstract Wearing Course (m)
0.175 G.S.B. Thickness Drain. Layer Pavement Estimate Filler Joint (Nos)
0.150 WMM if provide CC Estimate M-15 Approch Slab (m)
0.000 Sub Grade/Modified Soil RCC M-25 Approch Slab (m)
0.020 BT Traffic Design Shifting of Electric pole
S.T. A Chick List Distances 25
Sand Arpa river
Quarry Stone Daija Moorum Local
Culvert Details Distances 10 2
5 1000 mm HPC FCW
1x 1.0 m Slab Culverts 1x 5 m SC
1x 1.5 m Slab Culverts 1x 2 m SC Result of Road Cost
1x 3.0 m Slab Culverts
1x4.0 m Slab Culverts 3x5.0 m Slab Culverts
2x5.0 m Slab Culverts Cost Per Km
1x6.0 m Slab Culverts CD Cost 0 Lakha
2x6.0 m Slab Culverts CC Road Lakha
3mx3mx5nobox Culverts Total Cost 0.000 Lakha
No of Existing Culverts All
Department officials Village Area From To Unconnected Habitation
CGRRDA Chhattisgarh Rajpur 0 100 100 Popula
EXECUTIVE ENGINEER Bijaghora 1650 2130 480
GOVT OF CHHATTISGARH 0 0 0 0
CHHATTISGARH RURAL ROAD DEVELOPMENT AGENCY CC drain Side of CC 0 #VALUE!
DEPARTMENT OF PANCHAYAT AND RURAL DEVELOPMENT Both Side 0 0 0
MPRRDA MP 0 0 0 0
GENERAL MANAGER 0
GOVT OF MADHYA PRADESH 0
MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY 0
EXECUTIVE ENGINEER 0
GOVT OF CHHATTISGARH 0
CHHATTISGARH RURAL ROAD DEVELOPMENT AGENCY #VALUE!
Rajpur Sidhbaba road To Bijaghora Pahuch marg
CULVERT DETAILS Rajpur 0 100
S.NO. EXT proposed Bijaghora 1650 2130
Ch type condition Repair/Reconstruction Required RD Type Span
1 66 Field crossing 1x600 mm Poor 1x1000 mm dia HPC 66 HPC 1x1000 mm dia HPC CC drain Side of CC Length
2 786 Field crossing 1x600 mm Poor 1x1000 mm dia HPC 786 HPC 1x1000 mm dia HPC Both Side 0
3 1020 Field crossing 1x600 mm Poor 1x1000 mm dia HPC 1020 HPC 1x1000 mm dia HPC 0
4 1100 Field crossing 1x600 mm Poor 1x1000 mm dia HPC 1100 HPC 1x1000 mm dia HPC
5 1245 Field crossing 1x600 mm Poor 1x1000 mm dia HPC 1245 HPC 1x1000 mm dia HPC 0
6 1583 HPC 1x600 mm Good Canal crossing HPC 1x1000 mm CC drain Side of BT Length
7 HPC 4Rx1000 mm Good Slab culvert 1 x 2.00 m RHS 520 790 270
8 HPC 1x600 mm poor ( pipe Choke) Slab culvert 1 x 2.00 m RHS 1500 1570 70
9 Field crossing 3Rx1000 mm poor 1x 3.00 m slab culvert Slab culvert 1 x 1.50 m RHS 2000 2100 100
10 HPC 1Rx600 mm Good HPC 1x1000 mm dia HPC LHS 0
11 HPC 1x600 mm poor ( pipe Choke) 1x1000 mm dia HPC Slab culvert 1 x 6.00 m LHS 0
12 VCW 6Rx600 mm Good HPC 1x1000 mm Both Side 0
13 HPC 2Rx1200 mm Poor 1x 6.00 m slab culvert HPC 1x1000 mm RHS 0
14 HPC 1x600 mm Poor 1x1000 mm dia HPC HPC 1x1000 mm 440
15 Field crossing 1x600 mm Poor 1x1000 mm dia HPC HPC 1x1000 mm Earthen drain Length
16 Field crossing 1x600 mm Poor 1x1000 mm dia HPC HPC 1x1000 mm RHS 0
17 Field crossing 1x600 mm Poor 1x1000 mm dia HPC HPC 1x1000 mm Both Side 0
18 Field crossing 1x600 mm Poor 1x1000 mm dia HPC HPC 1x1000 mm LHS 0
19 Field crossing 1x600 mm Poor 1x1000 mm dia HPC Slab culvert 1 x 2.00 m Both Side 0
Reconstruction culvert Location LHS 0
HPC 1x900 mm Poor 1x 1.50 m slab culvert 1000 mm dia 66 , 786 , 1020 , 1100 , 1245 RHS 0
HPC 1x600 mm Poor 1x1000 mm dia HPC 1x1.50 m
HPC 1x600 mm Poor 1x1000 mm dia HPC 1x2.0 m
HPC 1x600 mm Poor 1x1000 mm dia HPC 1x3.0 m
HPC 1x600 mm Poor 1x1000 mm dia HPC 1x5.0 m
HPC 2Rx600 mm Poor 1x 1.50 m slab culvert 1x6.0m
HPC 1x600 mm Poor 1x1000 mm dia HPC 2x5.0
HPC 1x600 mm Poor 1x1000 mm dia HPC 3x5.0
20 HPC 1x600 mm Poor 1x1000 mm dia HPC 2x6.0 0
21 Field crossing 1x600 mm Poor 1x1000 mm dia HPC Slab culvert 2 x 6.00 m 600 mm FC 20 , 250 , 500 , 600 , 1810 , 2000
22 Slab culvert 1x1.00 m Poor 1x2.0 m slab culvert Slab culvert 2 x 6.00 m
23 HPC 1x1000 mm Poor 1x2.0 m slab culvert HPC 1x1000 mm
24 FCW 20 m Poor 3x5.0 m slab culvert Slab culvert 1 x 2.00 m Start point
25 Field crossing 1x600 mm Poor 1x1000 mm dia HPC HPC 1x1000 mm Latitude 22.197558
26 HPC 1x600 mm Poor 1x2.0 m slab culvert HPC 1x1000 mm Longitude 81.950629
27 Slab culvert 1x1.00 m Poor 1x2.0 m slab culvert HPC 1x1000 mm End point
28 FCW 30 m Poor 2x6.0 m slab culvert HPC 1x1000 mm Latitude 22.214398
29 FCW 20 m Poor 2x6.0 m slab culvert Slab culvert 1 x 3.00 m Longitude 81.945712
Proposed BT road Rd 0 to 2130
Proposed CC road
School Hospital
Panal concrete Rd
Surface type from To Length Proposed BT road 0 2130 2130
1 earthen 0 2130 2130 0 Chherkabandha () To Nawapara via Piprapara
0 Prop Panel concrete 0
0 Prop cell filled 0
Protection length Side
Start point Rajpur Daija Road Ret / wall 1580 1650 140 Both side Pasan Pipariya Road To
end point Bija Belpan Road 0 LHS
Toe wall 1245 1315 140 Both side
NAME OF ROAD Rajpur Sidhbaba road To Bijaghora Pahuch marg
LENGTH OF ROAD 2.13 Km BT(Km) 2.13 CC(Km) 0.00
BLOCK :- Thakatpur DISTRICT:- Bilaspur
Flexible Cost ( including Scarifying+ Road furniture) 123.27 Lakhs
Rigid Pavement Cost 0.00 Lakhs
Cost Of CD Work 15.41 Lakhs
Protection Works 35.68 Lakhs
Total construction Cost 174.36 Lakhs 431.000
Total Maintenance. Cost 8.73 Lakhs
GST Cost (18%) #REF! Lakhs
1% Contengency #REF! Lakhs #REF!
MGNREGA Cost 0.00 Lakhs
DPR Preparation & other work 0.00 Lakhs
Grand total Cost #REF! Lakhs
GRAND TOTAL COST (Rs.) #VALUE! Lakhs
Executive Engineer
Rural Development Division,
CGRRDA , Bilaspur
MUKHAYA MANTRI GRAM SADAK YOJANA
ABSTARCT - B Format F-6
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Package No :-
District :- ='Basic Sheet'!M6 BLOCK :- Thakatpur
Length :- 2.13 Km
S.No. Item of work Length of Road (Km) Cost Total cost
1 Flexiable pavement 2.130 11749034.20
2 Rigid pavement 0.000 0 5M Slab Culvert
3 Protection Work 3377392 3M Slab Culvert
4 Field Crossing 190380
5 Road Furniture 578268
6 D.P.R Preparation for 0
(BT+CC) length = 2.13
Total Length of Road 2.130 2M Slab Culvert
Sub Total 15895074 0 1Row 1000mm Dia
7 C.D. work 1.5m 1000mm 2m 3m 5m Rigid pavement
Type of CD Rd Cost 0.000 #REF! - - - - #REF! Exi. Rigid pavement
1 1x1000 mm dia HPC 66 308167
2 1x1000 mm dia HPC 786 308167 #REF! #REF! #REF! #REF! #REF! #REF!
3 1x1000 mm dia HPC 1,020 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 1x1000 mm dia HPC 1,245 308167 #REF! #REF! #REF! #REF! #REF! #REF!
7 1x1.50 m Span slab culvert 0
8 1x1.50 m Span slab culvert
9 1x1000 mm dia HPC
10 1x1.50 m Span slab culvert #REF! - - - - #REF!
10 1x1000 mm dia HPC
11 1x5.00 m Span slab culvert 0 -
12 1x1.50 m Span slab culvert 0 0 -
13 1x5.00 m Span slab culvert 0 Lack 0 -
14 1x1.50 m Span slab culvert #DIV/0! #DIV/0!
15 1x1.50 m Span slab culvert
16 1x6.0 m Slab Culvert
17 1x6.0 m Slab Culvert
18 1x3.0 m Slab Culvert
19 HPC 1000 mm 1 row
20 3x5.0 m Slab Culvert 0
21 1x3.0 m Slab Culvert
24 1x3.0 m Slab Culvert
25 1x3.0 m Slab Culvert
26 1x3.0 m Slab Culvert
27 1x6.0 m Slab Culvert
28 HPC 1000 mm 1 row
29 1x1.5 m Slab Culvert
Sub Total #REF!
Total Cost of road without maintenance Rs. #REF!
8 Road Maintenance for five year 873300
Total Cost of road with maintenance Rs. #REF!
Cost of road per Km is ( lakh) #REF!
Consultant Sub. Engineer Asst. Engineer Executive Engineer
Rural Development Division,
CGRRDA , ='Basic Sheet'!M6
GENERAL ABSTRACT
Name Of Road :- Chakarbhata Bilha Main Road se To Indrapuri hote hue NH tak
Vidhan Sabha :- Bilha B.T. 2.13 K.M.
Block:- Bilha C.C 0.00 K.M.
Total Length:- 2.07KM Existing Road Length K.M.
S.No. Particular Of Work Quantity Unit Amount Per Km Cost (in lakhs) Remark
Part A MGNREGA Work cost 0.00
Part B Construction
1 Site Clearance & Setting Out 0.77
3 Profile Correction CUM
4 Subgrade 0.00 CUM 0.00
5 Cutting CUM 0.23
6 Filling 26.04
7 Dismentalling of structure and pipe 0.00
8 Other earth work item & surface drain 0.49
9 Flexible Pavement (Crust & Shoulder) 2.13 KM 84.95 95.14
10 Rigid Pavement (Crust & Shoulder) 0.00 KM 0.00 173.37
11 Drain along with Flexible Pavement 0.44 KM 4.92 0.00
12 CC Drain along with Rigid Pavement 0 KM 0.00 14.58
Protection Cost
13 Retaining Wall 0.14 KM 28.56 128.60
14 Toe Wall 0.14 KM 5.21 4.74
15 Pitching ,etc 0.00 KM 0.00 0.00
16 Field Crossing 6 NO 1.90 5.09
17 Road Furniture 5.78 9.27
18 Speed Breakers
19 C.D. Work NO
I HPC 1 x 1000 mm dia 5 NO 15.41 0.00
II 1.50 mt Span Slab Culvert 0 NO 0.00 0.00
III 2.00 mt Span Slab Culvert 0 NO #REF! 27.65
IV 3.00 mt Span Slab Culvert 0 NO #REF! 16.30
V 4.00 mt Span Slab Culvert 0 NO 0.00 0.00
VI 5.00 mt Span Slab Culvert 0 NO #REF! 0.00
VII 6.00 mt Span Slab Culvert 0 NO #REF! 0.00
VIII 2x6.00 mt Span Slab Culvert 0 NO 0.00 36.21
Total-Cost of CD #REF! 80.16 #REF!
(A) Cost of Part B #REF! 512.30
(B) 18 % GST On Cost of Part B #REF! 92.21
(C) Total Cost Part B #REF! 604.52
Part C Maintenance Part
(D) Maintenance For Five Year @ 4.10 lacs/km 8.73
(E) 18 % GST On Maintenance 1.57
(F) Maintenance Cost Including GST 10.30
Total Cost [Construction+Maintenance{ (C)+(F)}] #REF!
Part D DPR Consultancy charges,utility shifting & other Non SOR Item 0.00
Part E 1% Contigency only on cost part B(excluding GST) #REF!
Total Cost Of DPR {Part A+Part B+Part C+PartD+PartE} #REF! #REF! Lakhs
Sub. Engineer Asst. Engineer Executive Engineer
Mungeli , (C.G.)
GENERAL ABSTRACT
Name Of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Vidhan Sabha :- Thakatpur B.T. 2.13 K.M.
Block:- Thakatpur C.C 0.00 K.M.
Total Length:- 2.13 Existing Road Length K.M.
S.No. Particular Of Work Quantity Unit Amount Per Km Cost (in lakhs) Remark
Part A MGNREGA Work cost 0.00
Part B Construction
1 Site Clearance & Setting Out 0.77 125.08
3 Profile Correction CUM
4 Subgrade 0.00 CUM 0.00
5 Other earth work item 0.10
Pavement Cost 116.63
6 Flexible Pavement (Crust & Shoulder) 2.13 KM 111.71
7 Rigid Pavement (Crust & Shoulder) 0.00 KM 0.00
8 Drain along with Flexible Pavement 0.44 KM 4.92
9 CC Drain along with Rigid Pavement 0 KM 0.00
Protection Cost
10 Retaining Wall 0.14 KM 28.56
11 Toe Wall 0.14 KM 5.21
12 Pitching ,etc 0.00 KM 0.00
13 Field Crossing 6 NO 1.90
14 Road Furniture 5.78
15 Speed Breakers
16 C.D. Work NO
I HPC 1 x 1000 mm dia 5 NO 15.41
II 1.50 mt Span Slab Culvert 0 NO #REF!
III 2.00 mt Span Slab Culvert 0 NO #REF!
IV 3.00 mt Span Slab Culvert 0 NO #REF!
V 4.00 mt Span Slab Culvert 0 NO 0.00
VI 5.00 mt Span Slab Culvert 0 NO #REF!
VII 6.00 mt Span Slab Culvert 0 NO #REF!
VIII 2x6.00 mt Span Slab Culvert 0 NO #REF!
Total-Cost of CD #REF!
(A) Cost of Part B #REF!
(B) 18 % GST On Cost of Part B #REF!
(C) Total Cost Part B #REF!
Part C Maintenance Part
(D) Maintenance For Five Year @ 4.10 lacs/km 8.73
(E) 18 % GST On Maintenance 1.57
(F) Maintenance Cost Including GST 10.30
Total Cost [Construction+Maintenance{ (C)+(F)}] #REF!
Part D DPR Consultancy charges,utility shifting & other Non SOR Item 0.00
Part E 1% Contigency only on cost part B(excluding GST) #REF!
Total Cost Of DPR {Part A+Part B+Part C+PartD+PartE} #REF! #REF! Lakhs #REF!
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , CGRRDA , Bilaspur CGRRDA , Bilaspur Traffic Design Traffic Design
Detailed Estimate for Maintenance of Road (For 5 Years)
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg District :- ='Basic Sheet'!M6
BLOCK :- Thakatpur
Sr.No. Description Length Unit Rate Amount
1 Maintenance of Road for Ist Year after Construction 2.130 Km 30000 63900
2 Maintenance of Road for IInd Year after Construction 2.130 Km 40000 85200
3 Maintenance of Road for IIIrd Year after Construction 2.130 Km 70000 149100
4 Maintenance of Road for IVth Year after Construction 2.130 Km 110000 234300
5 Maintenance of Road for Vth Year after Construction 2.130 Km 160000 340800
Total Rs. 873300
Sub. Engineer Asst. Engineer Executive Engineer
Rural Development Division,
Bilaspur, (C.G.)
MUKHAYA MANTRI GRAM SADAK YOJANA
DETAILED COST ESTIMATE
Name of Road - Rajpur Sidhbaba road To Bijaghora Pahuch marg
Length of Road:- 2.13 Km Dist. :- Bilaspur
Block :- Thakatpur
Sr. no SSR I.No. Description of Item No. Length Width Thicknes Qnty. Unit Rate(Rs) Amount
(A) Flexible Pavement
1 2.1 Setting out :- Setting out work complete wiyh construction of bench mark ( min 1 / km ), working bench mark ( min 4/km ) and near all bridges & CD works made of bricks/ stone masonary or concrete and reference pillars made of Precast concrete poles/ concrete filled 100 mmdia AC pipe @ 100 m interval of as required on both sides of the formation width , marking on central line , setting out curves and recording of central line levels and other required levels and distance etc. including setting out of CD & bridges with required reference pillars and marking etc. as directed by Engineer - in - charge 1 2.130 2.130 km 13949.00 29711.37
2 2.3 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(A) In area of non throny jungle 2 2130.00 1.00 4260.00 sqm 7.00 29820.00
3 2.2 Clearing Grass and Removal of Rubbish: Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. 2 2130.00 2.00 8520.00 sqm 2.00 17040.00
2 2.14 Removal of Telephone/Electric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202. (Rd 1000 to 1200 in LHS) 0 0.00 Nos 50000.00 0.00
3.1 Scarifying Existing Granular Surface to a Depth of 50 mm Scarifying existing granular/bituminous surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. ( Rd 2100 to 4100 m ) 2000 2.8 0 sqm 13.00 0.00
2 3.2 Compacting original ground / Existing Embankement (i)Compacting original ground supporting embankement/subgrade Loosing , levelling and compacting original ground supporting embankement / subgrade to facilitate placement of first layer of embankement , scarified to a depth of 150 mm mixed with water at OMC and then compacted by compacted by rolling to achieve minimum dry density as given in table 300.1 and 300.2 for embankement construction as per Technical Specification Clause 301.4.1 2130 8.78 0.15 0.00 Cum 25.00 0.00 2460
4 2.10(A) Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202 (A) Upto 600 mm dia Hume pipe - Rd 66 , 786 , 1020 , 1100 , 1245 5 7.5 37.5 Rmt 256.00 9600.00
4 2.10 (B) (B) above 600 mm to 900 mm dia Hume pipe 7.5 0.0 Rmt 346.00 0.00
4 2.10 (C ) Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202(C) above 900 mm dia Hume pipe - Rd 2173 7.5 0.0 Rmt 592.00 0.00
8 2.6 ( A) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202
(A )Lime Concrete
2.6 (B) (B)Cement Concrete
2.6 (C) (C))Reinforced Cement Concrete
6 2.8(A) Dismentling of Stone masonary as per Technical Specification clause 202 Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of stone masonry i/c of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A) Rubble Stone masonary in lime / cement/ mud mortar
Abutment 7.5 0.80 3.0 0.00
Abutment 7.5 0.80 2.9 0.00
7 2.11 Dismantling of Cement Concrete Pavements Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202 Approach Road at Rd 2337 in LHS 150 3 0.15 0.00 cum 2068.00 0.00
5 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3
as per earth work calculation statement 353.36
For Field crossing - 300 mm dia. 10.00 0.80 0.8 0.00
For Field crossing - 600 mm dia. 10.00 1.10 1.2 0.00
3.9 Excavation in ordinary rock
Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with all lift and lead upto 50 m as per Technical Specification Clause 302.3.5. Cu.m 287.00 0.00
11 8.3(iv) Earthwork in Hill Road
(v) Excavation in Hilly Areas in Hard Rock requiring blasting A) Excavation in hilly areas in hard rock requiring blasting, bymechanical means, lift upto 1.5 m and disposal ofexcavated rock upto a lead of 20 m as per Clause 1603.2.( as per earth work calculation statement ) 0.00 cum 970.00 0.00
6 3.3(i) Construction of embankment with material obtained from roadway cutting:--a.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 ( 80 % qty of roadway cutting is utilised ) Cu.m 63.00
7 3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 ( As per eartwork calculation sheet ) As Per Earth Work Calculation (11931.18 - 282.684) 11648.496 Cu.m 222.00 2585966.11 703.19
8 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR not less than 10%) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
For Exi. CC Road Rd 2430 to 2540 m 0 0.9 0.2 0
9 3.12(a) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
Qty required in CC road section ( as per calculation sheet)
Earthen Shoulders side of GSB - avg width (2.415+2.065)/2= 2.24 m 2 2130 2.240 0.175 1669.92
10 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Side of WMM(150) & BT (20 mm) - avg width ( 1.875+2.215)/2= 2.045 m 2 2130 2.170 0.170 1571.514 Cu.m 223.00 350447.62
11 3.8(i) Surface drain in soil- Construction of unlined surface drains of average cross section 0.4 sqm in soil to specified lines , grades , levels and dimension . Excavated material to be used in embankement with a lift upto 3 m and lead of 50 m ( average lead 25 m ) as per Technical Specification Clause 307 1 400 400.00 Rmt 99.00 39600.00
7 4.1 (a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Deduct Exisisting WBM Rd 2100 to 4100 2000 2.8 0.00
Camber Correction 1660 1.5 0.00
Extra widening at Junction Rd 1260m( 50 mt) 50 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 15 3.75 0.00
Extra Widining at Structure 5 6.15 2.95 0.00
For CC Road - Rd 1770 to 2120 m
Extra Widining ( As per Curve design ) 1 131.35 0.00
12 4.1 (d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (d)Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available.
Extra Widining at Structure 5 6.15 2.95 0.175 15.87
Approach Road at Rd 0 in LHS to talab 100.0 4.05 0.175 0.00
Extra Widining ( 3% ) 45.29
13 4.8 Wet Mix Macadam :- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Deduct Exisisting WBM Rd 2100 to 4100 0.15 0.000
Camber Correction 0.15 0.000
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.15 0.000
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.15 0.000
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.15 0.000
Extra Widining at Structure 5 6 2.95 0.15 13.607
Approach Road at Rd 0 in LHS to talab 0 100.00 3.75 0.15 0.000
Extra Widining ( 3% ) 35.944
8 4.7(2) WBM Grading 2:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.Rd 0 to 1700 m 1 2130 3.85 0.00
Extra Widining at Structure 5 6.15 2.95 0.00
Extra widening at Junction Rd 1260m( 50 mt) 0 50 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( As per Curve design ) 1 131.35 0 0.00
9 4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) Rd 0 to 1700 m
Grading No. 3 material 53mm To 22.4mm 1 2130 3.75 0.00
Extra Widining at Structure 5 6.15 2.95 0.00
Extra widening at Junction Rd 1260m( 50 mt) 0 50.0 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150.0 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15.0 3.75 0.00
Extra Widining ( As per Curve design ) 1 131.35 0.00
4.8 Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. Cu.m 1887.00 0.00
14 5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502Rd 1 2130 3.75 7987.50
Extra Widining at Structure 5 6.15 2.95 90.71
Extra widening at Junction Rd 1260m( 50 mt) 0 50.0 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150.0 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15.0 3.75 0.00
Approach Road at Rd 0 in LHS to talab 0 100.0 3.75 0.00
Extra Widining ( 3% ) 239.63
15 5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 1 2130 3.75 7987.50
Rd 200 to 320 m (over ext. CC Road ) 120 3.75 0.00
Extra Widining at Structure 5 6.15 2.95 90.71
Approach Road at Rd 0 in LHS to talab 0 100 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( 3% ) 239.63
5.6 Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 Bitumen(S-65) VG-30
Extra Widining at Structure 5 6.15 2.95 0.00
Extra Widining ( 3% ) 0.00
16 5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006
Rd 200 to 320 m (over ext. CC Road ) 0 120 3.75 0.00
Extra Widining at Structure 5 6.15 2.95 90.71
Approach Road at Rd 0 in LHS to talab 0 100 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( 3% ) 239.63
17 5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B
Rd 200 to 320 m (over ext. CC Road ) 0 120 3.75 0.00
Extra Widining at Structure 5 6.15 2.95 90.71
Approach Road at Rd 0 in LHS to talab 0 100 3.75 0.00
Extra widening at Junction Rd 1540m ( 150 mt) 0 150 3.75 0.00
Extra widening at Junction Rd 1700m ( 15 mt) 0 15 3.75 0.00
Extra Widining ( 3% ) 239.63
18 9.19(A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. A For 7.50 M Formation Width 1 1 no 22547.00 22547.00
Total of (A) Flexible Pavement 11749034.20
( B) Rigid Pavement
1 4.1 (a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Approach at Rd1540 m 150 3.00 0.00
4.1 (d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (d)Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available.
Rd 2340 to 2500 & approach rd at Rd 2337 in LHS (150 m) 1 0 4.05 0.15 0.00
6.7 Cement Concrete cell fill Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 Rd 2140 to 2340 200 3.75 0.10 0.00 cum 7669 0.00
13 6.1(ii) Cement Concrete Pavement (ii) Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Widening at junction at Rd 0 10 3.000 0.2 0.00
7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
Side of CC road
Rd 2340 to 2500 & approach rd at Rd 2337 in LHS (150 m) 2 0 0.9 0.2 0.00
14 3.12(b) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR not less than 10%) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
15 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge.
Rd 2200 to 2300 both side & in approach Road at Rd 2337 (150 m)
Casing around pipe at Rd 1310 , 1428 , 1575 6.5 1.53 1.38 0.00
Deduction for pipe 6.5 0.785 1.5129 0.00
Total of ( B) Rigid Pavement 0.00
(C) Protection Work
19 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3
For Field crossing - 300 mm dia. 10.00 0.80 0.8 0.00
For Field crossing - 600 mm dia. 10.00 1.10 1.2 0.00
20 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge.
Casing around pipe at Rd 1310 , 1428 , 1575 6.5 1.53 1.38 0.00
Deduction for pipe 6.5 0.785 1.5129 0.00
21 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .
Oridanary soil (i) upto 3 m depth
Retaining Wall ( 1580 to 1650 both side) 1 140.00 1.70 1.2 285.60
22 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Side of retaning Retaining Wall (0.15+1.15)/2 = 0.65 m 1 140 0.650 3.00 273.00 Cum 1032.00 281736.00
23 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (i). P.C.C grade M 10 (Nominal mix 1:3:6)
Retaining Wall ( 1580 to 1650 both side) 1 140 1.70 0.20 47.60
24 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
Retaining Wall ( 1580 to 1650 both side)
Retaining Wall ( 1580 to 1650 both side) 1 140 0.90 3.0 378.00
Toe Wall (Rd 1245 to 1315 both side )
Widening of Existing CC road from 3.0 m width to 3.75 m width Rd 200 to 320 m 0 0.375 0.2 0.00
2 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
28 7.31 Providing and laying cement concrete wearing courese M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 ( Rd 0 to 320 = 320 m ) 1 0.00 3.75 0.075 0.00 Cum 11782.00 0.00
6 7.41 (ii) Filler Joint II) Providing and fixing 20 mm thick premoulded joint filler in expansion joint complete as per drawing and technical specifications 0 8.10 0.00 Rmt 399.00 0.00
7 7.36 (i) P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) Nominal mix (1:2.5:5) 2 0.00 6.70 0.15 0.00 Cum 4400.00 0.00
8 7.37 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 2 0.00 6.70 0.2 0.00 Cum 11457.00 0.00
10 For Apron in existing CD ( Detail estimate attech seperately ) no 0.00
Total of (C) Protection Work 3377391.60
(D) Field Crossing
25 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3
For Field crossing - 300 mm dia. 0 7.50 0.80 0.8 0.00
for provided field crossing pipes(450 mm Dia) - 0 10 0.80 0.90 0.00
for provided field crossing pipes(600 mm Dia) 6 10 1.00 1.00 60.00
26 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105
for field crossing pipes (300 mm Dia) 0 7.50 0.70 0.15 0.00
for field crossing pipes (450 mm Dia) - 0 10.00 0.80 0.15 0.00
for field crossing pipes(600 mm Dia) - 6 10.00 1.00 0.15 9.00
27 7.6(A) Providing and laying reinforced cement concrete pipe NP3 for culverts/Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
for field crossing pipes (300 mm Dia) 0 7.50 0.00 Rmt 1129.00 0.00
for field crossing pipes (450 mm Dia) - 0 10.00 0.00 Rmt 1961.00 0.00
for field crossing pipes(600 mm Dia) - 6 10.00 60.00 Rmt 2928.00 175680.00
Total of (D) Field Crossing 190380.00
(D) TRAFFIC SIGNS AND OTHER APPURTENANCES
28 9.2(A) Cautionary, mandatory, informatory direction and place identification sign boards. (A)Semi-Reflective Traffic signs upto 0.90 sqm Direction and place indentification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 18 0.90 0.90 14.58 sqm 5285.00 77055.30
29 9.16 Providing and fixing LOGO BOARD Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 1 1.00 Each 6626.00 6626.00
30 9.2(B) Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 (Nabard Board) 4 1.20 1.00 4.80 sqm 5756.00 27628.80
31 9.8 Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) 5th Kilometre Stone (precast) 0 0 Each 3947.00 0.00
(ii) Ordinary Kilometer Stone (Precast) 3 3 Each 2292.00 6876.00
(iii) 200 m stone (precast) 10 10 Each 660.00 6600.00
32 9.17 Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 180 180 Each 673.00 121140.00
33 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project (B) Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 2 2 Each 18610.00 37220.00
34 9.15 (A) 10.15(A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 2 2 Each 14010.00 28020.00
35 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) At Bell mouth and curve portion ( total BT length ) 2 2130.00 0.10 426.00 sqm 627.00 267102.00
8.23 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Providing & Fixing tree studs in Square/ Round shape of 4” side/diameter made of 2 mm aluminum substrate (Confirming to IS:736-Material Designation 24345 or 1900) end reflective surface of High Intensity grade as specified in section 800.1.3 of MORT&H duly treated with HLVA and fixing the same with four Nos. high strength nails confirming to 1S:1367 on trees at site each 1500.00 0 each 67.00 0.00
Total of (D) TRAFFIC SIGNS 578268.10
(E) LAY BY PLATFORM ESTIMATE
3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 ( 1No./KM) 0 50.00 8.10 0.3 0.00 Cu.m 222.00 0.00
4.1 A(iii) Grainular subbase with well graded material (table 400.1):---- Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (A)Having CBR value more than 20% , by mix in Place Method (iii) For Grading - III Material ( 1No./KM) 0 50.00 3.75 0.175 0.00
Triangular portion 0 15.00 3.75 0.175 0.00
3.12 Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. 0 50.00 3.75 0 0.00
Triangular portion 0 15.00 3.75 0.175 0.00
4.7(2) WBM Grading 2:--Providing, laying, spreading and compacting Mechanically crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 50.00 3.75 0.075 0.00
Triangular portion 0 15.00 3.75 0.075 0.00
4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 50.00 3.75 0.075 0.00
Triangular portion 0 15.00 3.75 0.075 0.00
4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401.
Side of WBM G-III 0 50 2.05 0.170 0.00
Side of WBM G-II 0 50 2.09 0.075 0.00
Triangular portion 0 15 1.97 0.095 0.00
5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B 0 50.00 3.75 0.00
Triangular portion 0 15 3.75 0.00
Tota of (E) LAY BY PLATFORM ESTIMATE 0.00
(F) APPROACH RAMP ESTIMATE
3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 ( 4 No./KM) 0 50.00 7.50 0.6 0.00 Cu.m 222.00 0.00
4.1 A(iii) Grainular subbase with well graded material (table 400.1):---- Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (A)Having CBR value more than 20% , by mix in Place Method (iii) For Grading - III Material ( 4 No./KM) 0 20.00 4.05 0.175 0.00 Cu.m 804.00 0.00
3.12 Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Earthen Shoulder 0 20.00 2.24 0.175 0.00
4.8(2) WBM Grading 2:--Providing, laying, spreading and compacting Mechanically crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 20.00 3.85 0.075 0.00 Cu.m 1850.00 0.00
4.8(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum ) 0 20.00 3.75 0.075 0.00 Cu.m 1927.00 0.00
4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401.
Side of WBM G-III 0 20 2.05 0.075 0.00
Side of WBM G-II 0 20 2.09 0.075 0.00
5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 0 20.00 3.75 0.00 Sq.m 62.00 0.00
5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 0 20.00 3.75 0.00 Sq.m 21.00 0.00
5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006 0 20.00 3.75 0.00 Sq.m 166.00 0.00
5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B 0 20.00 3.75 0.00 Sq.m 60.00 0.00
Tota of (F) APPROACH RAMP ESTIMATE 0.00
(E) DPR Preperation
36 Preperation of DPR with survey 0 2.13 0.00 km 25000.0 0.00
Total of (E) DPR Preperation 0.00
As demanded by Forest departement vide letter No.1938 , date 25.04.2023 , for tree cutting and plantation
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
From:Embankment
To:Original Ground
Name of Road :Sidhbaba To Bija Ghora Pahunch Marg
Chainage Distance Cut Area Fill Area Cut Fill Cum. Cut Cum. Fill Remarks
Volume Volume Volume Volume
Bill of Quantity
Package No. - CG-MM-BSP-18 SOR - 2025
Dist - Bilaspur
Block - Takhatpur , Bilha
Sr. no SSR I.No. Description of Item Unit Rate Selar To Kauwatal Rajpur Sidhhababa Road To Bijaghora Pahuch Marg Combine BOQ
Length -2.70 KM Block - Bilha Length -2.13 KM Block - Takhatpur Total Length - 4.83 KM
Qty Amount Qty Amount Qty Amount
1 2.1 Setting out :- Setting out work complete wiyh construction of bench mark ( min 1 / km ), working bench mark ( min 4/km ) and near all bridges & CD works made of bricks/ stone masonary or concrete and reference pillars made of Precast concrete poles/ concrete filled 100 mmdia AC pipe @ 100 m interval of as required on both sides of the formation width , marking on central line , setting out curves and recording of central line levels and other required levels and distance etc. including setting out of CD & bridges with required reference pillars and marking etc. as directed by Engineer - in - charge km 13949.00 2.50 34873 34872.50 2.13 29711 4.63 64584
2 2.3 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. sqm 7.00 5000.00 35000 35000.00 4260.00 29820 9260.00 64820
3 2.2 Clearing Grass and Removal of Rubbish: Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. sqm 2.00 10000.00 20000 20000.00 8520.00 17040 18520.00 37040
4 2.10 Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202 (A) Upto 600 mm dia Hume pipe - Rmt 256.00 22.50 5760 5760.00 37.50 9600 60.00 15360
6 3.8(i) Surface drain in soil- Construction of unlined surface drains of average cross section 0.4 sqm in soil to specified lines , grades , levels and dimension . Excavated material to be used in embankement with a lift upto 3 m and lead of 50 m ( average lead 25 m ) as per Technical Specification Clause 307 Rmt 99.00 520.00 51480 51480.00 400.00 39600 920.00 91080
7 2.8(A) Dismentling of Stone masonary as per Technical Specification clause 202. Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of stone masonry i/c of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A) Rubble Stone masonary in lime / cement/ mud mortar Cum 412.00 15.84 6526 6526.08 0.00 0 15.84 6526
8 2.11 Dismantling of Cement Concrete Pavements Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202 cum 2068.00 67.50 139590 0.00 0 67.50 139590
9 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3 Cu.m 65.00 525.38 34149 34149.38 730.16 47460 1255.53 81609
10 3.3(i) Construction of embankment with material obtained from roadway cutting:--a.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Cu.m 63.00 92.30 5815 5814.90 282.68 17809 374.98 23624
11 3.4(i) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting using Vibratory Roller to meet requirement of Tables 300.1 and 300.2 with a lead up to250 m as per Technical Specification Clause 301.5 Cu.m 222.00 11471.19 2546604 2546603.51 11648.50 2585966 23119.68 5132570
12 3.12(a) Construction of subgrade and earthen shoulders with approved material (Granular Material having CBR more than 7%) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Cu.m 192.00 1677.76 322130 322129.92 1669.92 320625 3347.68 642755
13 3.12 (b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Cu.m 223.00 1578.89 352093 352092.92 1571.51 350448 3150.41 702541
14 4.1 (d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (d)Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available. Cu.m 1772.00 1863.51 3302147 1723.58 3054177 3587.09 6356324
15 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 For Field Crossing Cum 1200.00 7.50 9000 9000.00 9.00 10800 16.50 19800
16 4.8 Wet Mix Macadam :- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. Cu.m 1887.00 1452.26 2740409 2740408.72 1329.80 2509334 2782.06 5249743
17 5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 Sq.m 62.00 9053.96 561346 561345.68 8865.34 549651 17919.30 1110997
18 5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Sq.m 21.00 9053.96 190133 190133.21 8865.34 186172 17919.30 376305
19 5.3 (ii) 20 mm thick Open Graded Premix Carpet using Bituminious ( VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen/VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS73:2006(ii) Bitumen (VG-30) Sq.m 166.00 9053.96 1502958 1502957.78 8865.34 1471646 17919.30 2974604
20 5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B(ii) Bitumen (VG-30) Sq.m 60.00 9053.96 543238 543237.75 8865.34 531920 17919.30 1075158
21 7.4(B) Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(B)1000 mm dia Rmt 5468.00 22.50 123030 123030.00 37.50 205050 60.00 328080
22 7.6 (A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106 (A) 600 mm dia Rmt 2928.00 50.00 146400 146400.00 60.00 175680 110.00 322080
23 6.7 Cement Concrete cell fill Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 Rd 2600 to 2770 cum 7669.00 75.00 575175 0.00 0 75.00 575175
24 6.1(ii) Cement Concrete Pavement (ii) Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Cum. 5889.00 209.25 1232273 1232273.25 0.00 0 209.25 1232273
25 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge. Cum 4970.00 112.50 559125 559125.00 99.00 492030 211.50 1051155
26 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material . Cum 394.00 316.86 124844 124843.63 602.67 237452 919.53 362296
28 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Cum 4614.00 40.22 185580 99.62 459624 139.84 645203
29 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Cum 4576.00 368.71 1687226 1687226.11 565.32 2586904 934.03 4274130
30 7.18(I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C grade M 15 (Nominal mix (1:2.5:5) Cum 4839.00 155.59 752892 752892.27 102.38 495412 257.97 1248304
31 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix) Cum 6498.00 18.67 121301 121301.42 0.00 0 18.67 121301
32 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MT 73726.00 1.15 84559 84559.04 0.00 0 1.15 84559
33 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 No 317.00 20.00 6340 6340.00 0.00 0 20.00 6340
34 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications m 399.00 30.00 11970 11970.00 0.00 0 30.00 11970
35 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material Cum 1032.00 155.36 160336 160336.11 408.10 421160 563.47 581497
36 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder Cum 1619.00 4.60 7447 7447.40 0.00 0 4.60 7447
37 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 Cum 1923.00 2.00 3846 3846.00 0.00 0 2.00 3846
38 9.2(A) Cautionary, mandatory, informatory direction and place identification sign boards. (A)Semi-Reflective Traffic signs upto 0.90 sqm Direction and place indentification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 sqm 5285.00 19.44 102740 102740.40 14.58 77055 34.02 179796
39 9.16 Providing and fixing LOGO BOARD Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. Each 6626.00 1.00 6626 6626.00 1.00 6626 2.00 13252
40 9.2(B) Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 sqm 5756.00 4.80 27629 27628.80 4.80 27629 9.60 55258
41 9.8 (I) Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (i) 5th Kilometre Stone (precast) 0.00 0.00 0.00 0 0.00 0.00 0 0.00 0
42 9.8 (II) Ordinary Kilometer Stone (Precast) Each 2292.00 3.00 6876 6876.00 3.00 6876 6.00 13752
44 9.17 Providing & Fixing guard stone 200 x 200 x 900 mm made of precast RCC M20 grade fixed at 300 mm into the ground in P.C.C. 1:3:6 blocks of size 400 x 400 x 400 mm and given two coats of paint with white and black bands including excavation. Each 525.00 153.00 80325 80325.00 230.00 120750 383.00 201075
45 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project (B) Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 Each 18610.00 2.00 37220 37220.00 2.00 37220 4.00 74440
46 9.15 (A) 10.15(A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back Each 14010.00 2.00 28020 28020.00 2.00 28020 4.00 56040
47 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) Sq.m 627.00 428.00 268356 268356.00 426 267102 854.00 535458
48 9.19(A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. A For 7.50 M Formation Width 0 22547.00 1.00 22547 1.00 22547 2.00 45094
As demanded by Forest departement vide letter No.1938 , date 25.04.2023 , for tree cutting and plantation 0
Total Construction (A) 18782169 17435517 36217686
1 Maintenance of Road for Ist Year after Construction per km 30000.00 2.70 81000 81000.00 2.13 63900 4.83 144900
2 Maintenance of Road for IInd Year after Construction per km 40000.00 2.70 108000 108000.00 2.13 85200 4.83 193200
3 Maintenance of Road for IIIrd Year after Construction per km 70000.00 2.70 189000 189000.00 2.13 149100 4.83 338100
4 Maintenance of Road for IVth Year after Construction per km 110000.00 2.70 297000 297000.00 2.13 234300 4.83 531300
5 Maintenance of Road for Vth Year after Construction per km 160000.00 2.70 432000 432000.00 2.13 340800 4.83 772800
Total cost of Maintenance 1107000 1107000 873300 1980300
Total cost of Construction and Maintenance 19889169 18308817 38197986
Total cost with GST 23469220 21604404 45073624
Sub. Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA Bilaspur CGRRDA Bilaspur CGRRDA , CGRRDA Bilaspur
MUKHYA MANTRI GRAM SADAK EVAM VIKAS YOJNA
DETAIL ESTIMATE FOR 2 X 6.00M SPAN SLAB CULVERT
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 2750
COST ESTIMATE FOR SLAB CULVERT 2x 6.00 M SPAN
CHAINAGE : Block :
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 8.9 2.60 0.20 9.26 Cum
Returns 4 3.20 2.50 0.20 6.40 Cum
7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6)
Abutments- Foundation PCC 2 8.9 2.60 0.20 9.26
Wingwalls - Foundation PCC 4 3.20 2.50 0.20 6.40
Pier - Foundation PCC 1 8.90 1.40 0.20 2.49
18.15 Cum #REF! #REF!
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
PCC Grade M-15 ( Nominal Mix 1:2.5:5)
Abutments- Foundation PCC
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.70)/2 (1.90+2.40)/2 1.50 52.89
Wingwalls - Foundation PCC
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.20 (1.80+2.3)/2 1.50 39.36
Pier -Bottom Block ( From foundation to NBL) 1 8.70 1.20 1.50 15.66
Bed protection 2 7.50 6.00 0.20 18.00
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
PCC Grade M-20 ( Nominal Mix 1:2:4)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.70)/2 3.00 54.00
Top Block ( From NBL to Wing wall cap ) 4 (3.3+4.3)/2 (0.40+1.60)/2 3.53 53.66
Wing wall cap 4 4.30 0.40 0.150 1.03
Wheel guard 2 0.40 0.40 0.60 0.19
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5(II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 4.80 MT 73726 353550
For Cap beam & dirt wall 265.15
Distribution bar -12 mm dia@150 mm c/c 2 43 7.42 0.890 567.93
Top - Longitudinal bar - 10 mm dia@300 mm c/c 2 22 7.42 0.617 201.44
Top - Transerves bar - 10 mm dia@300 mm c/c 2 25 6.32 0.617 194.97
For chair - 20mm dia 2 15 1.59 2.47 117.82
Surface Reinforcement for - Abutment & wing wall @ 5kg/sqm 2 22.80 4.20 5.00 957.60
Surface Reinforcement for - Pier @ 5kg/sqm 1 19.00 4.20 5.00 399.00
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20.00 No 317 6340
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 3.00 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 20.00 0.00 Rm 2688 0
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 4.00 8.00 No. 2075 16600
9 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 3 7.50 22.50 sqm 399 8978
10 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Abutment - Upto NBL 2 8.90 (0.1+0.60)/2 1.50 8.61
Top Block - Behind abutment & wing wall 2 (2.8+5.2)/2 (3.3+4.30)/2 3.00 91.20
11 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 3.00 2.00 0.23 5.52 Cum 1619 8937
12 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 3.00 2.00 0.10 2.40 Cum 1923 4615
TOTAL Rs. #REF!
Consultant Sub Engineer Asst. Engineer Executive Engineer
Anand Vibhor Rural Development Division,
Bilaspur, (C.G.)
MUKHYA MANTRI GRAM SADAK EVAM VIKAS YOJNA
DETAIL ESTIMATE FOR 1 X 6.00M SPAN SLAB CULVERT
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
COST ESTIMATE FOR SLAB CULVERT 1X 6.00 M SPAN
Location :- Rd 570 m
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 8.9 2.60 0.20 9.26 Cum
Returns 4 3.20 2.50 0.20 6.40 Cum
7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6)
Abutments- Foundation PCC 2 8.9 2.60 0.20 9.26
Wingwalls - Foundation PCC 4 3.20 2.50 0.20 6.40
15.66 Cum #REF! #REF!
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.70)/2 (1.90+2.40)/2 1.50 52.89
Wingwalls - Foundation PCC
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.20 (1.80+2.3)/2 1.50 39.36
Bed protection 1 7.50 6.00 0.20 9.00
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.70)/2 3.00 54.00
Top Block ( From NBL to Wing wall cap ) 4 (3.3+4.3)/2 (0.40+1.60)/2 3.53 53.66
Wing wall cap 4 4.30 0.40 0.150 1.03
Wheel guard 2 0.40 0.40 0.60 0.19
Top Block ( From Abutment cap bottom to cap top)
Coping above Return Wall 4.30 0.40 0.15 0.00
Wheel guard 0.40 0.40 0.60 0.00
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5(II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 2.82 MT 73726 207845
For Cap beam & dirt wall 175.01
Distribution bar -12 mm dia@150 mm c/c 1 46 7.42 0.890 303.77
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 23 7.42 0.617 105.30
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 6.72 0.617 103.66
For chair - 20mm dia 1 16 1.59 2.47 62.84
Surface Reinforcement for - Abutment & wing wall @ 5kg/sqm 2 22.80 4.20 5.00 957.60
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 16 16.00 No 317 5072
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 3.00 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 14.10 0.00 Rm 2688 0
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 2075 8300
9 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (2.8+5.2)/2 (3.3+4.30)/2 3.00 91.20
10 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 399 5985
11 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 3.00 2.00 0.23 5.52 Cum 1619 8937
12 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 3.00 2.00 0.10 2.40 Cum 1923 4615
TOTAL Rs. #REF!
Consultant Sub Engineer Asst. Engineer Executive Engineer
Anand Vibhor Rural Development Division,
Bilaspur, (C.G.)
MUKHYA MANTRI GRAM SADAK EVAM VIKAS YOJNA
DETAIL ESTIMATE FOR 1 X 5.00M SPAN SLAB CULVERT
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 8.9 2.30 0.20 8.19 Cum
Returns 4 2.50 2.15 0.20 4.30 Cum
7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6)
Abutments- Foundation PCC 2 8.9 2.30 0.20 8.19
Wingwalls - Foundation PCC 4 2.50 2.15 0.20 4.30
12.49 Cum #REF! #REF!
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.7)/2 (1.60+2.10)/2 1.50 45.51
Wingwalls - Foundation PCC
Wingwalls -Bottom Block ( From foundation to NBL) 4 2.50 (1.45+1.95)/2 1.50 25.50 3647
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.40)/2 2.10 33.08
Top Block ( From NBL to Wing wall cap ) 4 (2.6+3.3)/2 (0.40+1.25)/2 2.58 25.12
Wing wall cap 4 3.30 0.40 0.150 0.79
Wheel guard 2 0.40 0.40 0.60 0.19
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 1.96 MT 73726 144698
For Cap beam & dirt wall 172.01
Main bar - 20 mm dia@140 mm c/c 1 54 5.81 2.47 775.20
Distribution bar -12 mm dia@175 mm c/c 1 21 7.42 0.890 138.68
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 20 7.42 0.617 91.56
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 5.72 0.617 88.23
For chair - 20mm dia 1 12 1.49 2.47 44.16
Surface Reinforcement for - Abutment & wing wall @ 5kg/sqm 2 20.40 3.20 5.00 652.80
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 12 12.00 No 317 3804
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 514
Behind Abutments 6.50 0.30 3.00 0.00 310
Behind Returns 3.35 0.30 1.50 0.00 1509
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 2075 8300
9 7.23 (I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (3.5+5.2)/2 (2.7+3.30)/2 2.10 54.81 1314
10 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 399 5985
11 10.5 (I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 3.00 2.00 0.23 5.52 Cum 1619 8937
12 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 3.00 2.00 0.10 2.40 Cum 1923 4615
TOTAL Rs. #REF!
Consultant Sub Engineer Asst. Engineer Executive Engineer
Anand Vibhor Rural Development Division,
Bilaspur, (C.G.)
MUKHYA MANTRI GRAM SADAK EVAM VIKAS YOJNA
DETAIL ESTIMATE FOR 1 X 3.00M SPAN SLAB CULVERT
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 8.9 2.30 0.20 8.19 Cum
Wingwalls 4 1.40 2.10 0.20 2.35 Cum
7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6)
Abutments- Foundation PCC 2 8.9 2.30 0.20 8.19
Wingwalls - Foundation PCC 4 1.40 2.10 0.20 2.35
10.54 Cum #REF! #REF!
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.70)/2 (1.60+2.10)/2 1.50 45.51
Wingwalls - Foundation PCC
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.40 (1.40+1.90)/2 1.50 13.86
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.40)/2 2.10 33.08
Top Block ( From NBL to Wing wall cap ) 4 (1.6+2.3)/2 (0.40+1.20)/2 2.45 15.29
Wing wall cap 4 2.30 0.40 0.150 0.55
Wheel guard 2 0.40 0.40 0.60 0.19
5 7.27 (II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Providing laying and placing in position HYSD rainforcement in super structure complete as per drawing and specification. 0.75 MT 73726 55228
For Cap beam & dirt wall 167.21
Main bar - 16 mm dia@125 mm c/c 1 60 3.63 1.58 343.84
Distribution bar -10 mm dia@175 mm c/c 1 21 7.42 0.617 96.14
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 13 7.42 0.617 59.52
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 3.52 0.617 54.30
For chair - 16mm dia 1 14 1.27 1.58 28.09
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 10 10.00 No 317 3170
8 12.11 Providing and laying filter media with Granular crushed aggregates as per specification to a thickness of not less then 600mm with smaller size towards the soil and boulder size towards the wall and providing over the entire surface behind abutment, wing
Behind Abutments 0.60 4.91 2.00 0.00
Behind Returns 0.60 1.50 0.00
8 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 M 399 5985
9 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2.00 0.00 No. 2075 0
10 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (3.7+5.2)/2 (1.7+2.30)/2 2.10 37.38
11 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 2.00 2.50 0.23 4.60 Cum 1619 7447
12 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 2.00 2.50 0.10 2.00 Cum 1923 3846
TOTAL Rs. #REF!
Consultant Sub. Engineer Asst. Engineer Executive Engineer
Rural Development Division,
Bilaspur, (C.G.)
MUKHYA MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 2.00M SPAN SLAB CULVERT
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
1.5M Slab Culvert
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth #REF! #REF!
i) Upto 3m depth below av. GL #REF! #REF!
Ordanary Soil #REF! #REF!
Abutments 2 8.7 2.00 1.40 48.72 #REF! #REF!
Wingwalls 4 1.80 1.80 1.40 18.14 #REF! #REF!
2 II Ordanary Rock ( Not Requiring Blasting) 0 #REF! #REF!
Abutments Cum 0 #REF! #REF!
Wingwalls 0 #REF! #REF!
0.00 Cum 493 0 #REF! #REF!
2 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6)
Abutments- Foundation PCC 2 8.7 2.00 0.20 6.96
Wingwalls - Foundation PCC 4 1.8 1.8 0.20 2.59
9.55 Cum #REF! #REF!
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments- Foundation PCC #REF! #REF!
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.5)/2 (1.40+1.80)/2 1.20 31.10
Wingwalls - Foundation PCC #REF! #REF!
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.70 (1.20+1.60)/2 1.20 11.42
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments #REF! #REF!
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.20)/2 1.50 21.38
Top Block ( From NBL to Wing wall cap ) 4 (1.8+2.3)/2 (0.40+1.00)/2 1.79 10.27
Wing wall cap 4 2.30 0.40 0.150 0.55
Wheel guard 2 0.40 0.40 0.60 0.19
4 7.27 (II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
(II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.100
5 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.50 MT 73,726 36,987
For Cap beam & dirt wall 161.80
Main bar - 12 mm dia@85 mm c/c 1 89 2.60 0.89 205.95
Distribution bar -10 mm dia@250 mm c/c 1 11 7.42 0.617 50.36
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 9 7.42 0.617 41.20
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 2.02 0.617 31.16
For chair - 12mm dia 1 12 1.05 0.89 11.21
(a) for surface reiinforcement @8kg/cum of PCC content
6 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 10 10.00 No 317 3,170
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 0
Behind Abutments 0.60 4.91 1.00 0.00 0
Behind Returns 0.60 1.00 0.00 0
7 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 399 5,985
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 2,075 8,300
9 7.23 (I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (4.0+5.2)/2 (1.8+2.30)/2 1.50 28.29
10 10.5 (I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 1.50 1.50 0.23 2.07 Cum 1,619 3,351
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 1.50 1.50 0.10 0.90 Cum 1,923 1,731
TOTAL Rs. #REF!
Consultant Sub. Engineer Asst. Engineer Executive Engineer
Anand Vibhor Rural Development Division,
Bilaspur, (C.G.)
MUKHYA MANTRI GRAM SADAK YOJNA (MMGSY)
DETAIL ESTIMATE FOR 1 X 1.50M SPAN SLAB CULVERT
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
1.5M Slab Culvert
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth #REF! #REF!
i) Upto 3m depth below av. GL #REF! #REF!
Ordanary Soil #REF! #REF!
Abutments 2 8.9 2.20 2.00 78.320 #REF! #REF!
Wingwalls 4 1.50 2.00 2.00 24.000 #REF! #REF!
2 II Ordanary Rock ( Not Requiring Blasting) 0 #REF! #REF!
Abutments Cum 0 #REF! #REF!
Wingwalls 0 #REF! #REF!
0.00 Cum 493 0 #REF! #REF!
2 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 10(Nominal mix (1:3:6) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments- Foundation PCC 2 8.9 2.2 0.20 7.832 #REF! #REF!
Wingwalls - Foundation PCC 4 1.5 2 0.20 2.400 #REF! #REF!
10.232 Cum #REF! #REF!
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments- Foundation PCC 8.7 2.00 0.20 0.000 #REF! #REF!
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.7)/2 (1.50+2.00)/2 1.50 43.050
Wingwalls - Foundation PCC 1.50 1.8 0.20 0.000 #REF! #REF!
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.50 (1.30+1.80)/2 1.50 13.950
Bed protection 1 7.50 1.50 0.20 2.250
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5) #REF! #REF!
PCC Grade M-15 #REF! #REF!
Abutments #REF! #REF!
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.30)/2 1.80 27.000
Top Block ( From NBL to Wing wall cap ) 4 (1.7+2.3)/2 (0.40+1.10)/2 2.06 12.360
5 7.27 (II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
(II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.100
6 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.40 MT 73,726 29,331
For Cap beam & dirt wall 161.80
Main bar - 12 mm dia@120 mm c/c 1 63 2.09 0.89 117.19
Distribution bar -8 mm dia@160 mm c/c 1 14 7.42 0.395 41.03
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 8 7.42 0.617 36.63
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 2.02 0.617 31.16
For chair - 12mm dia 1 12 0.94 0.89 10.04
(a) for surface reiinforcement @8kg/cum of PCC content
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 10 10.00 No 317 3,170
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 0
Behind Abutments 0.60 4.91 1.00 0.00 0
Behind Returns 0.60 1.00 0.00 0
8 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 399 5,985
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2.00 0.00 No. 2,075 0
9 7.23 (I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (4.0+5.2)/2 (1.7+2.3)/2 1.80 33.12
10 10.5 (I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 1.50 1.50 0.23 Cum 1,619 0
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 1.50 1.50 0.10 Cum 1,923 0
TOTAL Rs. #REF!
Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division, Rural Development Division, Rural Development Division,
CGRRDA , Bilaspur CGRRDA , Bilaspur CGRRDA , Bilaspur
MUKHYA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR 1x1000MM DIA. HUME PIPE CULVERT ( ONE ROW )
Road Name:- Rajpur Sidhbaba road To Bijaghora Pahuch marg
1Row 1000mm Dia
Sr. no SOR I.No. Description of Item No. Length (m) Width (m) Thickness (m) Qnty. Unit Rate(Rs) Amount ( Rs/- )
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Head Wall 2 6.45 1.9 1.4 34.31 Cum #REF! #REF!
Pipe portion 1.0 4.0 1.6 0.9 5.58 Cum #REF! #REF!
2 7.10(i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (i). P.C.C grade M 10 (Nominal mix 1:3:6) #REF! #REF!
Pipe portion 1.0 5.1 1.6 0.2 1.58
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 #REF! #REF!
Head Wall - Foundation 6.45 1.90 0.2 0.00 #REF! #REF!
Head Wall - Upto NBL - Avg Width ( 1.20+1.60)/2 = 1.40 2 6.15 1.40 1.2 20.66
Total 20.66 Cum 4576 94558 #REF! #REF!
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5) \ #REF! #REF!
Head Wall - From NBL to Top Av. Width = ( 0.40+1.20 )/2 = 0.80 2 6.15 0.80 2.30 22.63 #REF! #REF!
Deduct Pipe Portion -2 1.18 1.00 -2.35 #REF! #REF!
Coping M-15 6.15 0.40 0.15 0.00 #REF! #REF!
5 7.4(B) Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. #REF! #REF!
6 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 #REF! #REF!
0.00 Nos 239 0 #REF! #REF!
6 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 5.10 1.55 0.25 0.00 #REF! #REF!
0.00 Cum 911 0 #REF! #REF!
6 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material 2 6.45 0.15 1.20 2.32 Cum #REF! #REF!
8 10.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301
9 6.16 Providing and fixing guard srone 200x200x250 And given 2 coats oil paint
8 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 2.30 2.00 0.10 0.00 Cum 1660.00 0.00
Total Total for one 1000mm dia. One row CD work is Rs /- 308167
Sub. Engineer Asst. Engineer Executive Engineer
Rural Development Division,
Bilaspur, (C.G.)
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 3 X 5.00M SPAN SLAB CULVERT Format F-7
Name of Road:- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 2.70 7.90 0.20 8.53 Cum
Returns 4 2.66 2.24 0.20 4.77 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
PCC Grade M-15 ( Nominal Mix 1:2.5:5)
Bottom Block 2 2.20 7.70 1.40 47.43
Bottom Block 4 2.16 2.58 1.40 31.21
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Abutment cap 2 0.70 7.50 0.20 2.10
Top Block ( up to Abutment cap bottom) 4 2.74 1.01 3.68 40.86
Top Block ( From Abutment cap bottom to cap top) 4 3.35 0.49 0.68 4.44
Coping above Return Wall 3.35 0.40 0.15 0.00
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5(II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 5.50 MT 73,726 405,413
Surface Area of Abutment 4 2.20 1.40 12.32
Surface Area of Return 4 2.16 1.40 12.10
Surface Area of Pier 2 8.70 4.00 69.60
For Slab @60kg/Cum 70 57.08 3995.78
For Kerb 120kg/Cum 120 5.97 716.85
For Abutment Cap '@ 85.0 kg / sqm 85 2.10 178.50
For Ballast wall '@ 75.00 kg / cum 75 2.88 216.00
For Surface Reinforcement @5kg /Sqm 1 391.79 391.79
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20 No 317.00 6340
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 2 6.50 0.30 3.00 11.70
Behind Returns 4 3.35 0.30 1.50 6.03
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 2 21.00 42.00 Rm 2688.00 112896
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 0.00 No. 2075.00 0
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
12 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 4 7.50 30.00 Sqm 399 11970
13 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 5.00 3.00 0.23 13.80 Cum 1619.00 22342
14 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 5.00 2.00 0.10 0.00 Cum 1923.00 0
TOTAL Rs. 2850070
Consultant Sub Engineer Asst. Engineer Executive Engineer
Rural Development Division,
Bilaspur, (C.G.)
Chapter 13. Utility Shifting Relocation
13 Utility shifting/relocation
13.1 Existing utilities
Existing utilities like Electric pole & Hand pump are away from proposed carriage way , hence not required to shieft
13.2 List of departments responsible for utility shifting-
a) Electric pole :- C.S.E.B.
b) Hand pump :- P.H.E.
13.3 Rules pertaining to shifting of utilities - As per perinial departement
13.4 An estimate for relocation of utilities is given below in Table 13.1
Table 13.1 Estimated Cost for Relocation of Utilities
Sl. No. Utility Type Qty Estimated Rate Estimated Cost Rs.
2 Electric pole Rd 228 100000 0
3 Electric pole Rd 3080 100000 0
Estimated Total Cost Rs. 0
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor 0 0 0 Rural Development Division,
Chapter 14.Traffic Management and Road Safety Measures
14.1 Road Furniture
Road Furniture details include:
Ø Road markings
Ø Cautionary, mandatory and information signs
Ø KM stones and 200m stones
Ø speed breakers
Ø Boundary stones
14.1.1 Road Markings
As the project road is a single lane village road , there is not requirement for road marking.
14.1.2 Cautionary, Mandatory and Informatory Signs
Cautionary, mandatory and informatory signs are provided on each curves , at school , at village , hospital , narrow bridge , hair pin bend etc. as the situation and function they perform in accordance with the IRC: 67-2001 guidelines for Road Signs.
Overhead signs are proposed in accordance with IRC: 67-2001.
14.1.3 Kilometer Stone and Hectometer Stone
The details of kilometre stones are in accordance with IRC: 8-1980 guidelines. Both ordinary and fifth kilometre stones are provided as per the schedule. Kilometre stones are located on both the side of the road.
The details of 200m stones conform to IRC: 26-1967. 200m stones are located on the same side of the road as the kilometre stones. The inscription on the stones shall be the numerals 2,4,6 and 8 marked in an ascending order in the direction of increasing kilometerage away from the starting station. Table 14.1 gives the details of Km. stone.5th km. stone and boundary pillars provided.
S.No. Name of Road Chainage (km) 5th. Km. stone (nos.) Km. stone (nos.) 200m stone (nos.) Boundary/Guard stone (nos.)
Note :- 5 th Km stone As per Specification of Rural Road 2004 , on page No.452&453
14.1.4 Delineators and Object Markers
Roadway delineators are intended to mark the edges of the roadway to guide drivers on the alignment ahead. Object markers are used to indicate hazards and obstructions within the vehicle flow path, for example, channelising islands close to the intersections.
Delineators and object markers are provided in accordance with the provisions of IRC: 79-1981. They are driving aids and should not be regarded as substitutes for warning signs, road markings or barriers
14.1.5 Guard Posts, Crash Barriers and Speed Breakers
Guard posts are proposed on embankments of height more than 1.5m and bridge approaches. The spacing of guard post shall be 10.0 m c/c in these areas. Typical Guard post consists of pre-cast (M20) CC post of size 200 mm x 200 mm and a height of 600 mm above ground level. They are encased in M15 cement concrete to a depth of 450 mm below ground level. Guard posts are painted with alternate black and white reflective paint of 150 mm wide bands. Table 14.2 gives the details of guard posts, crash barrier and speed breakers. A layout of a typical speed breaker is given below.
Details of guard posts, crash barrier and speed breakers
Sl. Chainage Purpose Guard post (nos.) Crash Barrier (m) Speed breakers (nos)
3 2130 School 1
4 2220 School 1
5 2860 School 1
14.2 Temporary traffic control
The road under consideration has to be widened alongwith the bridges and culvert. The list below provides the c/d structures to be widened/reconstructed and temporary traffic control measures to be implemented.
Table 14.3 gives the section-wise details of temporary traffic control measures to be adopted.
Details of temporary traffic control measures to be adopted
Sl. Chainage (km) Temporary traffic control measures to be adopted
1 0.066 provide diversion
2 0.786 provide diversion
3 1.020 provide diversion
4 1.100 provide diversion
5 1.245 provide diversion
6 0.000 provide diversion
7 0.000 provide diversion
8 0.000 provide diversion
9 0.000 provide diversion
10 0.000 provide diversion
11 0.000 provide diversion
12 0.000 provide diversion
13 0.000 provide diversion
14 0.000 provide diversion
15 0.000 provide diversion
16 0.000 provide diversion
17 0.000 provide diversion
18 0.000 provide diversion
19 0.000 provide diversion
20 #REF! provide diversion
21 0.000 provide diversion
22 0.000 provide diversion
23 0.000 provide diversion
24 0.000 provide diversion
25 0.000 provide diversion
26 0.000 provide diversion
27 0.000 provide diversion
28 0.000 provide diversion
29 0.000 provide diversion
30 #REF! provide diversion
31 #REF! provide diversion
32 #REF! provide diversion
33 #REF! provide diversion
34 #REF! provide diversion
35 #REF! provide diversion
36 #REF! provide diversion
37 #REF! provide diversion
16 provide diversion
Note :- There is no extra Cost for Diversion as per CG SOR jeneral notes point no 7
14.3 Checklist for Road Safety Measures
Sl Road Safety Checklist Remarks
a A minimum 100 mm thickness of pavement GSB layer constructed to the full roadway width.(Insert Justification for the same) As per PMGSY guide lines and specification the GSB layeris to be provided below WBM layer having CBR>20%
b The upper layer of all shoulders of sub‐base quality compacted to a minimum thickness if 100 mm. Yes , provided
c Shoulder side slopes are not be steeper than 2H:1V unless stone pitching of the slope is provided. Side slope not steeper than 2H:1V
d Speed breakers as per NRRDA circular comply with the requirements of IRC:99‐1988 for general traffic. Yes , provided
e Speed breakers placed at the threshold of a habitation and at regular intervals (150 -200 m) through the habitation. Yes , provided
f Within densely populated habitations, a cement concrete (CC) pavement or V-shaped side drain is constructed to the full width of the available roadway. Yes , provided
g Within habitations, wherever deep side drains are constructed either within or adjacent to the roadway, is covered by slabs laid level with the adjacent pavement and capable of being manually removed. Yes , provided
h In habitations where child playing areas border the road, a low profile wall, raised kerb or similar form of boundary marking (depending on the site conditions), is constructed to create a physical boundary and act as a deterrent to the random movement of a child onto the road. Children play area is away from road
i On roads where, because of the lack of dry land in the general area, the shoulder will be continually occupied and only intermittently available for traffic, speed breakers are installed at regular intervals, not more than 300 m apart, for the entire length of the road. Not Applicable
j The drawings show all obstructions in the proposed road shoulder with a note that the obstruction is to be removed. There is no obstruction on the shoulder
k If a shoulder obstruction cannot be removed, hazard markers are installed to mark the Obstruction Not Applicable
l Hazard markers are installed at all pipe culvert headwalls. Yes , provided
m Hazard markers are installed at each end of all box culverts, river crossing causeways and similar CD structures. Yes , provided
n Hazard markers are installed at any discontinuity in the shoulder. Yes , provided
o Directional sight boards are installed on all sharp curves and bends. Yes , provided
p Speed breakers are provided at sharp curves and bends where the curve design speed is less than 40 km/h in plain and rolling terrain, and less than 25 km/h in mountainous and steep terrain. Yes , provided
q Speed breakers are provided and directional sight boards installed at sites where reverse horizontal curves are closely spaced and speed reduction is required. Not Required
r At a main road intersection, signs and pavement markings for STOP control on the PMGSY village road are installed, side road warning signs on the main road and intersection warning signs on the village road are installed, and speed breakers on the PMGSY village road are provided as given in the figures (refer IRC 99-1988). Yes , provided
Road safety issues identified during the design were and the mitigation measures are included in all designs and shown on the DPR drawings. Details of the issues and measures are:
Details of Road Safety issues and mitigation measures to be adopted
Sl.No. Chainage Safety issues Mitigation measures adopted Remarks
1 210 Curve cautionary Board in both direction
4030 School ahead cautionary Board in both direction Village board 0 , 840 , 3300 , 4700 , 6500 , 7530
Type of cautionary board Location ( m ) Safety issues Mitigation measures adopted Remark
Village board 0 , 1590. Village name board Informatiory board At start and end of village
Curve 210 , 300 , 330 , 630 , 1080 , 1420 , 2280 , 2490 , 2700 Curve ahead cautionary Board In both direction of curve
Junction 0 , 200 , 460 , 550 , 650 , 1200 , 1850 , 2600 , 2700 Junction ahead cautionary Board In both direction of junction
School 500 , 2130 School cautionary Board In both direction of School
Hospital Hospital cautionary Board In both direction of Hospital
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor 0 0 0 Rural Development Division,
14.19 Checklist for Road Safety Measures
S. No. Check List Item Yes No Justification/ Reason, if answer is “No”
1 Has the road been planned as per the concept of hierarchical road network Yes
2 Is the road taking off from MDR and not SH or NH Yes
3 Has the transect walk realistically assessed the availability of land, identified hazardous locations and possible countermeasures acceptable to local people Yes
4 Is the roadway width of 7.5 m in plain and 6.0 m in hills is available on selected alignment without any encumbrance such as hand pumps and electric poles installed by other Departments of the Government. Yes
5 Does DPR include following:
(a) Horizontal Alignment and Longitudinal Vertical Profile, Yes
(b) Cross-section at required interval along the alignment within ROW, Typical Cross-Sections with details of pavement structure, Yes
(c) Detailed Drawings of intersections layout with traffic signs, pavement markings and speed management measures, Yes
(d) Detailed Working Drawings for individual Culverts and Cross-Drainage Structures, Yes
(e) Detailed Working Drawings for individual Bridges, Tunnels, Subways and Structures. Yes
(f) Detailed Drawing showing each traffic sign with its type and location, pavement markings of edge lines and pedestrian crossings at required locations. Yes
(g) Drawing showing location and layout of bus bays, if required and to be provided. NR
(h) Detailed drawings showing safety measures (traffic signs, markings, delineators or other special treatment) for sharp/ blind curves if part of alignment Yes
6 Is the alignment on raised ground level for better drainage and side slopes not steeper than 2:1. Yes
7 Is the take off point at right angle or nearly right angle with main road and at level ground Yes
8 Has the takeoff intersection been well designed and provided with Stop Line markings and signs provided. Yes
9 Does the road end provide space for turning of vehicles especially buses and emergency vehicles. Yes
10 Has the intersection been provided with speed management measures on the rural road as per IRC:99-2018. Yes
11 Has the road the provision for well compacted shoulders for movement of VRUs. Yes
12 Has bus bays been planned and provided as per guideline of IRC: 80 – 1981 if there exists or planned bus operations. Yes
13 Have the traffic signs been provided with Class B, Type IV retro reflective sheeting, at required locations and configurations as prescribed by IRC 67 – 2012 and each sign is shown in alignment plan. Yes
14 Has the road been provided with pavement markings of edge lines, pedestrian markings at required locations and stop line with thermo plastic paints as prescribed in IRC: 35 – 2015 Yes
15 Has the road been provided with delineation where embankment height is more than 1.5 m and at sharp bends Yes
16 Has the road been provided with delineators of plastic material with reflectors, at required locations so that road alignment and width is clearly visible during night use. Yes
17 Have the crash barriers been provided at locations where the height of embankment is more than 3 m, approaches to bridges. No Not required
18 Have the crash barriers been provided with safe end treatment and or embedment in bridge/ culverts railings. No Not required
19 Have the hazard marker signs been provided correctly at each end of all box culverts, river crossing causeways and similar CD structures and at any discontinuity in the shoulder. Yes
20 Have guard/ guide posts provided at submersible bridges and causeways. No No existing submersible bridges and causeways are present
21 Have the objects within roadway width removed or provided with identification/ marking with white paint. Yes
22 Have ramps been provided where field paths and cattle crossings intersect the road Yes
23 Have sharp/ blind curves been improved and or provided with the safety treatment. Yes
24 Have the road studs been provided along pavement markings to enhance night time visibility. Yes
25 Have the appropriate speed management measure as per IRC: 99-2018 been provided at the intersection, approaches to schools (if exist) and other required locations needing speed reduction. Yes
26 Do rumble strips provisions include painting and advance warning signs. Yes
27 Does DPR include safety measures in the approaches to villages and within village as per IRC: 99-2018. Yes
28 Does DPR include Work Zone Temporary Traffic Management Plan and provides for signs and delineations as prescribed in IRC SP 55 – 2015. Yes
Chapter 16.Environmental Issue
16.1 Impact of the project
Environmental analysis is a key part of the planning process for a new road. It presents the opportunity to look at alternative proposals, discuss the negative and positive impacts of a given project, look at ways to mitigate negative impacts and plan for funding for those mitigation measures, incorporate the ideas and thoughts of local citizens impacted by the project, avoid delays once the project is under construction, and come up with an optimized, improved plan for the project. The environmental analysis for the proposed road is thus presented.
Most of the material used in this road construction project will be procure from already established crushers and querries.The impact of transportation will affect and its enegy calculation enclosed.
Figure 17.1 Impact of the road
Considering the results of environmental analysis, a Carbon Emission Reduction Plan is to be prepared. This plan consists of decisions made and steps taken to reduce carbon footprints resulting from the construction and maintenance activities.
{Consultants should specify in this plan ways to enhance the environmental aspects of the project whichever are proposed. This shall include measures such as roadside landscaping and tree planting, greening of the cut slopes and other relevant stabilizing/preservation measures for the road adjoining areas. All possible steps taken to minimize the adverse environmental effects of the project, both during construction works and subsequently in road maintenance and operations should be well documented in this plan to maximum possible details.}
16.2 Calculation of CO2 equivalent savings in GHG emissions
{Calculate CO2 equivalent for Green House Gas emissions for various construction and maintenance activities for the proposed road. A sample template for the same can be referred from the study conducted by TERI for NRIDA. (The environmental specialist from the DPR preparation team should monitor and appropriate the calculations considering specificity of the proposed road or bridge as may the case. The conversion factors provided in the study by TERI can be directly used wherever necessary.) It should contain detailed analysis of two cases; carbon emission calculation for case one where road would have been constructed using conventional technology without modifying any process parameter and other where the actual process is followed using new material/technology under the category of green technology.}
16.3 Calculation of material and energy consumption for the project
{It should include detailed calculation for estimated material and energy usage during the construction as well as for maintenance activities. These calculations would help in arriving at numbers for savings in energy as well as materials wherever applicable. These numbers should be presented at the end of this section. This should contain a sub-section where savings in aggregates and other natural resources, if any should be recorded and savings achieved in GHG emission equivalent. The chapter shall contain a separate section on calculations on savings achieved for aggregates by different means adopted, which may include design modification or use of locally available/marginal materials etc.}
{References For Calculations:
Material Consumption
For Construction
Name of Road- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Length in Km- 2.13
Material Unit Quantity Proposed to be used Qty/km per trip
Coarse aggregate Tonnes 3231.36 1517.07 80783.9775 162
Fine aggregate Tonnes 2154.24 1011.38 108
Soil Tonnes 8169.87 3835.62 408
RCC Tonnes 1.01 0.476
Cement Tonnes 100.37 47.12 5
Brick Tonnes 0.00 0
Reinforcement Tonnes 1.01 0.476 0
Bitumen/cationic bitumen emulsion Tonnes 78.28 36.75 4
Diesel Litres 15341.86 7202.750347 3835
Timber Tonnes 0.00 0
Kerosene Litres 0.00 0
For Maintenance
a. Routine Maintenance
Coarse aggregate Tonnes 114.42 53.72
Fine aggregate Tonnes 86.31 40.52
Bitumen/cationic bitumen emulsion Tonnes 3.00 1.41
Cement Tonnes 0.40 0.188
Soil Tonnes 10.03 4.71
Diesel Litres 7202.75 3381.572933
Timber Tonnes 0
Kerosene Litres 0
b. Periodic Maintenance
Bitumen Litres 29 13.41
Coarse aggregate Tonnes 1403 658.8
Diesel Litres 1826 857.5
Conversion Factors for construction materials
Material Used Embodied Energy Coefficient Embodied Carbon Coefficient
(MJ/kg) (kg CO2/kg)
Coarse aggregate 0.083 0.005
Fine aggregate 0.083 0.005
Cement 5.5 0.95
Reinforcement 20.1 1.46
Bitumen/cationic bitumen emulsion 51 0.55
Diesel 35.8 3.222
Timber 30.8 1.8
Kerosene 36.108 2.898
Energy consumption for transportation of construction materials
Material Source of procurement/ Distance from the work sight Energy consumption for transport per trip Total number of trips Total Energy consumption for transport Quantity Proposed to be used total km driven avg diesel consumption
Aggregate for WBM Gr II 0
Bitumen Bitumen Vishakapatnam 700 1020000 4 3992153 78.28 5479.425 1826.475
Bitumen Emulsion
Crushed stone cum Aggregate including Gr III Daija 10 1494 162 241383 3231.36 3231.3591 1077.1197
Hume Pipes RCC Pipe NP3 (600 mm Dia) _ 0 0 0 _
RCC Pipe NP3 (1000 mm Dia) _ 0 0 0 _
RCC Pipe NP4 (1000 mm Dia) _ 0 0 0 _
RCC Pipe NP4 (1200 mm Dia) _ 0 0 _
Sand Coarse Sand Arpa river 25 1494 108 3437 2154.24 5385.5985 1795.1995
Steel Reinforcement Raipur 140 404010 0.05 20481 1.01 14.19432 4.73144
Stone Boulders _ _ 0 _ _
Stone Chips _ _ 0 _ _
Stone Metal Gr I _ _ 0 _ _ total litre consumed 15341.85824
Diesel 40 954 3.35 3197 per km diesel consumption
Kerosene _ _ 0 _ _
total no of trip 686.756304
16.4 Compliance with the Environmental Codes of Practice 22.33959579
{It shall include detailed discussion on compliance with the environmental and social safeguards, environmental codes of practice, environmental management plan published by NRIDA/World Bank/Asian Development Bank. Wherever this is not complied with the above, due justification should be provided for the same.}
The proposed road has planned to be designed considering the impact on environment. Proposed road alignment follows existing pathway to the maximum extent so that huge land acquisition is not necessary for construction of the project road. Proposed road, when completed, will be an addition to the aesthetics of this rural area.
16.6 Environmental Sensitive Area (National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc.)
The alignment will be finalized avoiding the environmental sensitive area such as National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc. It is also necessary to maintain the minimum distance of 500 m of the project road from environmental sensitive area.
16.7 Construction Camp
Construction camps will be established away from forest area/water body. The minimum facilities such as water supply, sanitation, storm water drainage, solid waste management and first aid box will be provided during the construction period of the project. Necessary provision for rehabilitation or restoration after the completion of construction phase will be done.
16.8 Permit / Clearance required prior to commending of civil work
· No objection Certificate- This will be taken by PIU from SPCB.
· Forest Department- If the project road passing thorough forest land and acquisition of the same is involved and it will be taken by PIU from Forest Department
· Consent to establish (CFE) and Consent to Operate (CFO) - This is required for Plant Hot Mix Plant, WMM Plant, Batching Plant required for the project and the same will be taken by the Contractor from SPCB.
· Lease from Mines & Geology- This will be taken by the Contractor for new Stone Quarry required for the project.
16.9 Borrow area
The filling soil will have to be procured from borrow pit. Borrow area will be so excavated that the lands can reused as agricultural field. The depth of borrow pit shall not exceed 450 mm (150 mm top soil included). The top soil shall be stripped and stacked and shall be spread back on the land. As far as possible the borrow pits shall not be dug close to the road embankment. The Redevelopment of borrow area will be done before closure of the same and it will be as per agreement between landowner and the Contractor.
16.10 Erosion Control
Turfing of the embankment slopes and earthen shoulder to prevent erosion of slopes of the embankment, rain cuts and erosion of shoulder is being suggested.
Suitable cross drainage structures have been provided on the basis of hydrological survey of the area. So, there will be no obstruction to the natural drainage of the area. Road side drainage is also duly considered in a manner so that surface water is led to the low points and is drained through the CD structures.
16.12 Use of Material
Consultant Sub. Engineer Asst. Engineer 0 E.E. Cum Member Secretary
Anand Vibhor PIU, PMGSY PIU, PMGSY Bilaspur CGRRDA , PIU, PMGSY , Mungeli
Chapter 17. New Technology/Green Technology
In order to promote cost-effective, locally relevant, ‘Green’ and fast construction technologies in the construction of rural roads, using New materials / Waste materials / Locally available materials, NRIDA has issued ‘Guidelines on Technology Initiatives’, in May 2013. The States have been asked to propose at least 10% of the length of annual proposals using any of the new technologies, for which specifications of Indian Roads Congress (IRC) are already available and an additional length of 5% of annual proposals with any of the new technologies for which specifications of Indian Roads Congress are not available, including materials accredited by IRC.
The states need to follow the above guidelines while submitting the proposals under PMGSY. The details of some of the materials/ technologies for which IRC specifications are available and for which specifications are not available are given below:
Technologies with IRC Specifications
. Lime stabilization
. Cement stabilization
. Bitumen stabilization
. Use of Fly Ash/Pond Ash
. Lime fly ash stabilized Bases
. Use of fly ash in cement for concrete structures.
. Roller Compacted Concrete Pavements
. Cold Mix Technology
. Waste Plastic Utilization
. Bio Engineering Measures
Technologies with No IRC Specifications
• Locally available /Marginal materials, Brick aggregates etc.
• Blast furnace Slag/ Steel Slag /Zinc Slag
• Jute / Coir Geo-textiles
• Rice husk, Baggage
• IRC Accredited materials like RBI 81, Terrazyme, Powercem, Zycosil, RoadCem etc.
• Quarry Waste Materials
• Slope Stabilization, Bamboo Piling etc.
• Cell Filled Concrete, Paneled Concrete
Justification for selection of technology
Check list for Adoption of New Technology/Green Technology
1 Usage of local materials
Whether local and marginal materials are proposed for usage in sub base, base layers and in construction of support structures. Please elaborate Yes , local material is used for construction of Road
2. Soil and pavement stabilization
2.1 What are the soil stabilization measures proposed for poor sub grade and side slopes and in poor drainage areas Not required
2.2 In case of non-availability of good GSB / base course material what is the alternate option proposed Not required
2.3 Have sub base and/or base course stabilization measures proposed No
3. Pavement surfacing
3.1Whether cold emulsion is being proposed in the surface paving No
3.2 Is Warm Mix Asphalt(WMA) proposed in the pavement No
4. New Materials & Green Technology
4.1 Please list out all the new materials and green technology being proposed in the DPR
4.2 What provision has been kept for carbon sink for offsetting carbon emissions No
5. Carbon Emission Reduction Plan
5.1 Has Carbon Emission Reduction Plan been attached? No
5.2 Does this Plan cover the three R’s, namely, Reduce, Recycle and Reinvent No
Consultant Sub. Engineer Sub. Engineer 0
Anand Vibhor Bilaspur CGRRDA , Bilaspur CGRRDA ,
Chapter 18. Climate Resiliency
Climate resilient infrastructure endures the impacts of climate related events. Changes in the climate involve changes in temperature, precipitation, melting of glaciers, storm activity, river flow, wind speeds and much more. Road infrastructure being totally exposed to the vagaries of nature is highly vulnerable to the impacts of climate change, the adverse effects of which apart from the physical damage to the road network can affect a country’s economy. Climate change impacts the road infrastructure in various ways: high precipitation and flooding increases the risk of rendering the drainage system inadequate resulting in damage to the road drainage structures, scouring of bridge foundations, breaching of road embankments, submergence of road sections, landslides, rock falls and erosion resulting in disruption of traffic, road closure for indefinite period and weakening of pavement; and exposure of areas along the river basins to flooding causing frequent closure of the roads. Floods may lead rivers to change their course, thus rendering previously safe roads at risk of being flooded. In the view of above, to ensure increased resilience and environmental sustainability of the rural road various climate resilient measures are proposed for this roads project. List of all such measures is as follow:
Check List of DPR incorporating Climate Resilience
1. Availability in the DPR of following documents /studies undertaken
1.1 Topographical, geological and geomorphologic maps Yes
1.2 Geotechnical studies Yes
1.3 Hydrological studies Yes
1.4 Hazard data base and inventory, susceptibility and hazard zoning maps, as available Yes
1.5 Any information available pertaining to the site Yes
2. Road Geometrics
2.1 Gradients As per Specification
2.2 Curves, hair pin bends, etc Smoothing of curves have been done as per specification
2.3 Hair pin bends – gradient, radius and location – whether staggered and availability of adequate width along with stable and gentle hill slope yes , detail atteched
2.4 Road Alignment – alternate alignments considered and whether the selected alignment is sun facing, avoids steep hill cutting, located sufficiently away from river bank and adequately raised to avoid inundation by river flood yes , detail atteched
2.5 Whether the proposed alignment crosses steep channels subjected to debris flow No
3.1 plain, rolling, mountainous or steep Plain
3.2 topographical constraints such as cliffs, ravines and gorges -
3.3 dip of the rock, joints and fractures -
4.1 profile as identified from the natural and artificial slopes such as mule tracks and footpaths, terracing for agriculture/horticulture yes
4.2 slope stability and location of earlier landslides No
4.3 whether the slopes are wet No
4.4 possibility of avalanches and snow drifts No
5. Soil Characteristics
Soil- type, depths and tendency to erode of the strata, geology of the area
6. Drainage characteristics (whether existing protection works adequate or need enhancement)
6.1 Surface yes
6.1.1 Side drains- type, size and whether lined atteched
6.2 Sub-surface -
6.2.1 Catch water/intercepting drains – whether required and provided with justifications yes
6.3 susceptibility to flooding and if so, flood levels and river training provision incorporated yes
7. Land use of water shed/catchment area
7.1 River/stream characteristics N.A.
7.1.1 whether meandering or straight N.A.
7.1.2 banks erodible or non-erodible N.A.
7.1.3 river bed soil classification N.A.
7.1.4 discharge and velocity of the flow N.A.
7.1.5 recorded maximum flood discharge and HFL at proposed site N.A.
7.2 Catchment Area characteristics N.A.
7.2.1 slope of the catchment area N.A.
7.2.2 Vegetation cover – extent and type -
7.3 Land use within the catchment area ( at present and expected in future) -
8. Climatic Conditions
8.1 Temperature (40 - 45C)
8.2 Rainfall 1000 -1200 avg. yearly
8.3 Snowfall No
8.4 Fog conditions No
8.5 Exposure to Sun Moderate
8.6 Unusual weather conditions such as cloudburst/ flash floods Flash flood accasionly
9. Design and Construction
9.1 Whether huge vertical cuts avoided, benching adopted and quantity of earthwork accordingly taken in BOQ yes
9.2 Whether the quantity of earthwork in excavation has been considered by keeping the cut face of the hill slope as per the soil classification shown in the cross-sections yes
9.3 Has the choice of manual/mechanized cutting factored in the terrain condition (briefly comment) Mechanicle cutting
9.4 Whether the item taken for excavation in rock specifies, ‘blasting prohibited’, and rate for the item accordingly taken in BOQ yes
9.5 Whether provision kept in the BOQ for use of useful excavated material in the project itself yes
9.6 What efforts made to balance cut and fill methodology used (70 - 80% ) cut qyantity
9.7 Location of dumping sites and proposed development of these sites as playground/park /parking area, etc. (Payment for the quantity of excavated material actually dumped at site to be made based upon initial and final levels of the dumping site) yes
9.8 Whether the size and type of support structures provided are adequate and are justified with proper documentation, site conditions, etc. yes
9.10 Have the intensity, duration and frequency of rainstorms/cloudbursts occurring as a result of climate change considered in the design of robust slope stabilization measures and assessing provisions related to drainage yes
9.11 Has the capacity of cross drainages fixed based upon the size of the catchment area, its characteristics and the rainfall pattern and due allowance made for possible blockages yes
9.12 Have the CDs been proposed at natural drainage crossings and not allowed water to continue beyond them thereby overloading the side drains, etc. yes
9.13 What efforts have been made to provide precast culverts/side drains and of standardized sections yes
9.14 In case a culvert location has likely diversion potential due to huge debris flow what provisions have been kept to accommodate overtopping without washing out the structure or diverting flow down the road yes
9.15 Is there a possibility of some of the nallahs/gullies widening and deepening as a result of higher intensity and frequency of rainfall? If so, what provisions have been kept to mitigate this problem yes
9.16 Have provisions been made for scour checks in side drains if the slope exceeds 4% Not required
9.17 In case of soft hill profile has the height of vertical face of side drain increased to function as a toe wall yes
9.18 Have the hair pin bends been provided with CDs both on the lower and upper arms along with provision of escape drain on the upper arm Not required
9.19 Is there provision for bio engineering measures with or without civil engineering measures at locations expecting shallow seated slope failure N.A.
9.20 Is provision kept for covering (stabilizing) cut and fill slopes with vegetation, to minimize surface instability problems as well as minimize surface erosion yes
9.21 How is the pavement proposed to be made durable in reaches passing through saturated soils/ black cotton soils or such poor soils, areas subjected to flooding, etc. N.A.
10. Likely foundation strata for major structures
Hard strata available , hence not required
11. Detailed Field Investigations carried out
11.1 Geotechnical, subsurface and drainage investigations yes
11.2 Diagnostic assessment of the landslides and their likely significance yes
11.3 For flood risk assessment the source of flood water, the route it follows and the assets likely to be affected yes
12. Any other information
Crust strengthing provided as per traffic intensity
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor Bilaspur CGRRDA , Bilaspur CGRRDA ,
Chapter 19.Analysis of Rates
Rates for various item of works of the project have been derived from the “Schedule of Rates {Feb. 2018} for Road works, Culvert works & Carriage etc.
Published by CGRRDA CG SOR 2025
1) a)"Specifications" refer to the "Specifications for Rural Roads" published by the Indian road Congress August'2004, on behalf of the Govt. of India Ministry of Rural Development. "Specifications" refer to the "Specifications for Rural Roads" published by the Indian road Congress August'2004, on behalf of the Govt. of India Ministry of Rural Development.
(b) "Clause" refer to clauses of the specifications referred to in note (a) above.
(c) "Engineer-in-charge" would refer to the Executive Engineer of the Project Implementation Unit.
(d) "Table" refer to the table of the aforesaid specifications.
2) The rates of all items include element of setting out and carrying out the work in narrow or part width, of road, where directed unless specified.
3) The measurement of excavation above water level and below water level shall be recorded separately. The no extra rates for dewatering, shoring and shuttering shall be paid.
4) In the absence of any stipulation to the contrary, unit rates for different items of work are for completing the works to the specifications i/c full compensation for all operations detailed in the relevant sections of the specifications under "Rates". The rates are to be considered as the full rates for the finished work covering all labour, material, royalties, lease, rent, wastage, temporary work, plant, equipment, overhead charges and profit, unless otherwise specified.
5) Mode of measurements shall be as per provisions contained in the relevant clauses of the specifications unless specified otherwise.
6) The Rates include the element of hire and running charges of all types of plant, machinery and equipment required to complete the work unless specified otherwise. Royalty, octroi-duty and all other taxes are included in the rates.
7) The rates include making arrangement of traffic as per clause No. 111 and its sub clauses.
8) The rates also include the element of testing of samples of various materials brought by the contractor for use on the work as well as other tests for items of work as stipulated in the specifications. Frequency of such tests to be carried out must not be less than the prescribed frequencies. Copies from Registers containing records of tests shall have to be presented alongwith running account bills. Actual consumption of materials like bitumen, cement and steel be worked out in each running bill before making payment. Register (Original) shall have to be submitted alongwith the final bill. Tests of the material shall have to be conducted by the contractor's engineer under the supervision of the consultant & authorised representatives of PIU.
9) Confirming to IS specifications duly tested DGS&D reinforced cement concrete hume pipes shall be used in construction of roads. The testing certificate of DGS & D will be kept on record before making payment of item of such hume pipes.
10) Whenever existing road is to be widened, sides shall be cut in steps of 15 cm thickness and rate for cutting of earth and its filling with compaction to required density shall be payable as per items of excavation and compaction (Item 3.4 and 3.2 respectively).
11) Metal to be used for all bituminous courses and cement concrete shall be crushed in mechanical crushers.
12) The works of shoulders must precede the work of sub-base and base courses and succeed the bituminous courses and cement concrete pavement.
13) Wherever an existing boulder soling or WBM pavement is required to be excavated, it shall be presumed that the following quantities of rubble and coarse aggregates would be available for re-use and issued to the contractor at the rate indicated against each: -
a) Rubble :- 1 Cubic meter of rubble for every cubic meter of excavated boulder soling @ Rs. 115 per cubic meter. b) Coarse Aggregate :- 1.10 Cubic meter for every cubic meter of excavated WBM @ Rs. 120 per cubic meter. (Excavated WBM should be screened to segregate metal from moorum/screening before re-use)
14) For each compacted cubic meter or square meter as the case may be, of items of bituminous, base and surface courses the approximate loose quantities required will be 1.4 cubic meter unless other wise specified
15) Bitumen & modified bitumen shall be obtained from Govt. refinery and bitumen emulsion from reputed Manufacturer having ISI marks.
16) In case of any contradiction in the provisions of the specifications and this schedule of rates, the provision of the later would take precedence.
17) Dismantling of utilities will be done under the supervision of concerned departments with prior information to the users.
18) For narrow and restricted areas, plate compactors shall be used for compaction to achieve the desired density.
19) The actual quantities of materials shall be as per job mix formula for bituminous works.
20) Latest I.R.C. Codes shall be followed
21) The girth of trees shall be measured at 1.00 Meter (One Meter) above ground level.
22) All wood obtained from the cutting of trees shall be property of the government and shall be deposited at PIU store as per direction of Engineer-in-Charge.
23) The rates of loading and unloading of various items include stacking also
24) The rate of haulage are for short lead i.e. upto 10 Km only.
25) Where only grass wild growth is met with, rate of item No.2.1, i.e., clearing grass and removal of rubbish should be applied.
26) In case excavated rock is found suitable for use in works, it will be available to the contractor for its use on the work free of cost.
27) Spreading of bituminous materials shall be done by mechanical means except in areas where a mechanical paver cannot have access
28) Use of cement concrete pavement for rural roads is likely to be limited to small stretches. Accordingly, the rate analysis is based on concrete mixer of suitable capacity with weigh batcher, fixed side forms and screed, plate and needle vibrators.
29) The size and location of traffic signs shall be as per IRC:67
30) All concrete should be mixed in mechanical mixers
31) The cost of formwork is included in the rate of concrete.
32) The items of foundation include works below bed level or ground level as the case may be. The items of sub structure include work between top of the foundation and bottom of the soffit and items of super structure include soffit and above. There will be no super structure items for pipe culverts.
33) There are 3 different type of rates in chapter 3 for earthwork of different nature. Item no. 3.3 is applicable for Construction Embankment with approved soil with all leads . The rates of item no. 3.11 will be applicable for construction of subgrade and earthen shoulders beside GSB. The rates of item no. 3.4 and item no. 3.2 will be applicable for excavation of local soil & excavation for widening of carriage way, road cutting and its used in embankment.
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor Bilaspur CGRRDA , Bilaspur CGRRDA ,
Chapter 20. Cost Estimate
Cost Estimate of project has been arrived on the following basis
• Selection of Items of work
• Estimation of item wise quantities
• Analysis of Rates
20.2 Estimation of Quantities
All the relevant road and structure work Items will be identified as per survey, design and drawings. Following major item of works considered are given below:
• Site clearance, dismantling and earthwork
• Pavement works (GSB, WMM, Bituminous layers)
• Cross drainage structure works
• Drainage and protective works
• Utility relocation
• Road safety and furniture
• Maintenance works
Quantity of earthwork will be derived from the proposed cross section drawings. Volume of cut and fill will be obtained directly using the design package software. Quantity derived from software will be manually verified. There are same stretches of the road in cut section. The details are provided chainage wise in Table-18.1 of total cut and fill volume. The soil obtained from roadway excavation shall be used for construction of embankment and shall be paid as per item no.4. All other quantities will be computed from the drawings of finished road, miscellaneous drawings & drawings of CD Structures.
{Enclosed- Table of cut and fill volume in Annexure 3}
20.3 Abstract of Cost Based on CG SOR 2025
Unit rates will be derived by using the “Schedule of Rates for Road Works, Culvert works and Carriage etc. The abstract of Cost estimate is given in the Table below.
{ Enclosed- the details of cost in Format F6 & Format F7}.
20.4 Maintenance
Cost of Annual Maintenance for five years after completion of project, cost of 6th year renewal coat and cost of further five years annual maintenance after the completion of 6th year renewal coat are to be estimated as per the PMGSY-III Guidelines. Different activities of ordinary repairs are to be done as and when required
{ Enclosed- total Cost of 5 year Routine Maintenance Works in Format F6}.
Consultant Sub. Engineer Asst. Engineer 0
Anand Vibhor Bilaspur CGRRDA , Bilaspur CGRRDA ,
Design Report & Field survey details
6 Detail of Temporary Benchmarks Yes
7 Traffic survey details Yes
8 Material test reports Yes
9 Pavement & curve Design Yes
10 Hydraulic Design ( Detail of Exi. & proposed CD works ) Yes
1 Format B : Package Summary
2 Format C : Check list for PIU & STA
3 Format F-1 : Package wise Summary sheet
4 Format F-2A : Pavement layer Detail
5 Format F-2B : CD Structure Detail
6 Format F-3A : Details of Typical Cross Section of Existing pavement
7 Format F-3B : Details of Typical Proposed Cross Section of pavement
8 Format F-4 : Detail of Existing road for upgradation
9 Format F-5 : Association of road
10 Format F-6 : Cost Estimates for Road
11 Format F-7 : Cost Estimates for CD Works
12 Format F-8 : Rate Analysis
13 Format F-9A : Certificate for ground Verification from Executive Engineer
14 Format F-9B : List of DPRs verified on Ground
15 Checklist for community consutation on engineering
PRADHAN MANTRI GRAM SADAK YOJNA
Package Summery
Name of Road Rajpur Sidhbaba road To Bijaghora Pahuch marg
S No Name of Block Name of Road Type of Proposal N/U Proposed Length (in K.M) Proposed Length (in K.M) Cost of Pavemnt (Rs in Lakhs) Cost of protection & misc. Item (Rs in Lakhs) No.of Cd Work No. Cost of CD work (Rs in Lakhs) Other Cost (Rs in Lakhs) Total Estimated Cost (Rs in Lakhs) Average Cost/ Km (Rs in Lakhs)
From To BT CC Total Const. Maint. Const. Maint.
1 Thakatpur Rajpur Sidhbaba road Bijaghora Pahuch marg N 2.13 0.00 2.13 2.130 86.42 33.34 3 16.35 0.53 136.64 8.52 64.15 4.00
Cost Sharing Detail
Prepared by : Checked by : ITEM MORD STATE
Signature Signature Main& renewal ( 0:100) 0.00 70.38
Scrutinizes by: Technical Scrutiny done by : Coordinator STA :
Signature Signature Signature
PRADHAN MANTRI GRAM SADAK YOJANA(PMGSY)
Format For Consolidation Report of the STA
On the Project Proposals under PMGSY.
1 . State : Chhattisgarh Phase : Year :
2 . Names of the Members of the STA involved in the Technical Scrutiny
3 . Whether Pre-DPR meeting was held with SRRDA and DPIUs.
4 . Summary of the Project Proposals scrutinized indicating districtwise and road wise and road wise
details of length and cost . The summary includes the No. of Packages and total value .
5 . Whether schedule for scrutiny was fixed in advance and difficulty in adhering to schedule .
6 . Actual scrutiny process and time taken for scrutiny (Please indicate the dates)
7 . Interaction of the Engineers of the Executing Agencies with the STAs.
8 . Major deficiencies observed during scrutiny with details .
9 . Reliability of data obtained through investigations and used in the design/ estimation .
10 . Compliance of the provisions / instructions given in the guidelines/ circulars/ operations maual/ IRC
codes etc. in the preparation of DPRs including Environmental/RR/Road safety aspects etc.
11 . Levels of response from the Senior Engineers of the Executing Agencies for the suggestions given
by the STAs for revision/ modifications in the DPRs.
12 . If DPRs outsourced , perceived level of competence of outsourced consultants and suggestions.
13 . Overall comments and impressions of the STAs, if any, on the process of the preparation of DPRs
and their technical scrutiny.
Signature and Name of the Coordinator STA
PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY -Iv)
CHECK LIST FOR P.I.U. & S.T.A.
( For Indvidual Road Works )
To be filled by PIU
1. Location :- State: Chhattisgarh District : Bilaspur Block: Thakatpur
2. Package No:-
3. Name of the Road: From Rajpur Sidhbaba road to Bijaghora Pahuch marg
4. Total Length (Km): 2.13 km In Built up area - #VALUE! km In Open Area - #VALUE! km
5. Type of proposal : New /Upgradation/Riding Quality Improvement: New connectivity
If portion of the proposed road is existing PMGSY road then indicate
Name of the road : Rajpur Sidhbaba road To Bijaghora Pahuch marg L/T No.
Year of sanction under PMGSY: Year of completion:
Design Traffic (CVPD/ESAL):
Whether road deteriorated due non maintenance: Yes
6. Estimated Cost Rs :
Cost sharing pattern for this road Normal Area (60:40)
Item Total Cost in Rs. Average Cost per km. Lakhs
Flexible Pavement Flexible Pavement 8642304 40.57
Rigid Pavement 0 0.00
Others ( CD Works, Protective works & Misc items) 4968709 23.33
Cost due to higher specification such as carriage way width, Higher Axle load , Hard shoulders, Shifting of Utilities 52600 0.25
Total Construction cost 13663614 64.15
Total Project Cost 16123064 75.70
MoRD Share 9642279
State Share 6480786
7. Is the road a part of DRRP and Approved CUCPL: YES
a) If Yes, Through Route/MRL No.:
Name of Habitation Population Overall Weightage 321
b) Names of benefitted habitations: Bijaghora 199
c) Utility value = Total weight/ Length of road
d) Name of facilities located on this proposed road as per DRRP : For Details please refer OMMAS abd DRRP
e) Whether the proposed road leads to : Village Road
f) Average PCI of the road to which proposed TR or MRL will be connected :
g) Average PCI value of proposed road :
h) If PCI of MDR / SH / NH is 3 or below , whether the State's undertaking for simultaneouly upgrading it from State fund is avaible : NA
i) Age of the proposed road : 10
j) Existing surface of proposed road : BT
k) Cummalative maintenance expenditure in last three years( in lacs) : NA
l) Whether the road proposed using new technologies : Yes
If Yes, Name of the technology proposed : 0
8. a) Whether the Proposed Road has the desired carriage way width, Roadway width and Road Land Width (RLW ) Carriage way Roadway width Road land width
b) Indicate the actual widths of the following for the proposed road
In the Built Up Area (m) In the Open Area (m)
i) Carriageway 3 3
ii) Roadway 6 6
iii) Road Land Width 7 8
c) Indicate the proposed widths of the following for the proposed road
i) Carriageway 3.75 3.75
ii) Roadway 7.5 7.50
INDEX MAP (not to scale ) : Attached saperately
Enroute Habitations Name / Chainage
H1/F1 H2/F2 H3/F3
F-Facilities name
9 Name of Road : Rajpur Sidhbaba road To Bijaghora Pahuch marg
Cross Section details
a) Cross Section of The Existing road showing different component layers.
Earthen surface Item Thick (mm)
b) Cross Section of The Proposed road showing different component layers
(Should be as per Actual Provisions of DPR)
Item Thick.(mm)
10 Base year traffic volume
Month & Year of Traffic Volume Count = 15/03/2026
Motorised Traffic Non Motorised Traffic
Days Cars,Jeep, Vans,Three Wheelers Motorised two Wheelers Light Commercial Vehicle Trucks Agricultural Tractors Trallers Buses Cycles Cycle Rickshawa Animal Drawn Vechicle
L U OL L U OL L U OL SWC No. Tyre
3 days traffic cound is required in case design is done using IRC SP:72-2015 and 7 day count required in case design is done with IRC 37:2018
Passenger car unit( PCU) 752.8333333
a Traffic Details in case degisn is done as per SP IRC 72:2015
ADT in the year of Traffic Count = 421.5962685
Growth rate adopted (%) = 0.06 Base Year Traffic AADT (T) = 375.2191781
Design Life = 10 Years Cumulative ESAL = 236560
Number of Harvesting Seasons = 1 Traffic Category = T5
No. of Days in Each Harvesting Season (t) = 75
Value of (n) assumed = 1
b Traffic Details in case degisn is done as per IRC 37-2001 /IRC 37 :2012
A= Intitial traffic in the year of completion of construction in terms of the number of commericial vehicles per day 147.67
D= Lane distribution factor 1.00
F= Vehicle damage factor As per vehicle
n= Design life in years 10.00
r= growth rate adopted % 6%
N= The cumulative number of standard axles to be catered for the design in terms of msa 0.237
11. Subgrade CBR ( for Different Sections ) =
12. Cost Details of upgradation proposal
A. Pavement Components
Description of layer Thickness in mm Quantity Rate Rs Cost Rs.
Clearing, scarifying, dismantling existing CDs field crossing etc 589959
Earth Work - in Excavation/ Cutting 644.96 65 41922
Earthwork- in Filling (utilisation) 282.68 55 15548
Earthwork- in Filling (borro pit) 11648.50 176 2050135
Subgrade (if provided seperately)/ Treated subgrade 0
Shoulders (If not considered in the Earthwork) 175 1669.92 180 300586
Granular Sub base 175 1858.24 650 1207855
Soil + Aggregate Mix 0
WBM Gr -I I I 0
Bituminous Layers 0
Prime Coat 9859.34 43 423952
OGPC /SDBC/BC ( SDBC / BC if designed by IRC 37) 20 9859.34 128 1261995
BM /DBM ( if designed by IRC 37-2018) 0.00 7593 0
Surface Dressing
Total cost of Flexible pavement 8642304
Cement Concrete Road
Design done with IRCSP 62:2014 Yes IRC 58-2012 No
Dry lean concrete( DLC) 100 0 2332.00 0
Concrete for Pavement (M30) Panelled concrete 100 0.00 5097.00 0
Geo Cell filled Concrete Pavement 100 0.00 5836.00 0
Panel concrete 100 0.00 5680.00 0
Roller Compacted Concrete Pavement (M30) 200 0 4529.00 0
Hard Shoulder 100 0.00 358.00 0
Total Cost of Concrete Pavement 0
i Existing CD ( requiring repair)
Location - Chainage (Similar Type of CD's may be grouped together) Type of CD & their Nos Total Length of Bridge/ Culvert Cost in Rs.
5Rx600 HPC 150 Slab culvert 1x6.0 m Slab culvert Poor 150 1x6.0 m Slab culvert
6Rx600 HPC 0 500 HPC 1Rx1000 mm HPC Good 4050 1x1.5 m Slab culvert
2Rx1200 HPC 0 800 Slab culvert 1x1.5 m Slab culvert Good 0
FCW 0 1000 Slab culvert 1x1.5 m Slab culvert Good 0
900 1Rx900 HPC 0 1200 Slab culvert 1x3 m Slab culvert Good 0
890 1Rx1000 HPC 0 1400 HPC 1Rx1000 mm HPC Good 0
2Rx1000 HPC 0 2400 Slab culvert 1x6.0 m Slab culvert Good 0
1x0.60 m S.C. 0 2410 HPC 1Rx1200 mm HPC Good 0
1x1.0 m S.C. 0 2450 Slab culvert 1x1.5 m Slab culvert Good 0
1x1.5 m S.C. 0 2500 Slab culvert 1x1.5 m Slab culvert Good
1x2.0 m S.C. 0 3080 Slab culvert 4x6.0 m Slab culvert Good
850 1x3.0 m S.C. 3300 Slab culvert 1x3 m Slab culvert Good
645 1x4.0 m S.C. 0 4150 HPC 1Rx1000 mm HPC Good
ii New proposed CD ( including complete replacement of existing CDs)
Location - Chainage (Similar Type of CD's may be grouped together) Type of CD & their Nos Total Length of Bridge/ Culvert Cost in Rs.
0 3x3x5 box 0 0
Total Cost of CD works in lacs 1338359
C. Protection works
Chainage Length( m) Cost in Rs Avg. cost / m
Retaining wall Both side 1580 1650 140 1872049 13371.78 1872049
LHS 0 0 Rd 900 to 920 ( both side ) , 1620 to 1660 ( both side) , 1800 to 1820 ( both side) , 2700 to 2720 both side & 6410 to 6550 both side
Both side 0 0 3085 to 3100 both side , 4320 to 4350 both side & 4800 to 4820 both side
Toe wall Both side 1245 1315 140 393086 2807.76
Pitching / turfing/wearing coat/appron 0 0
Total cost of protection works 2265135.6
D. Pucca Side Drains (if Provided) Chainage Length( m) Cost in Rs Avg. cost / m
Both Side 0 0 0
#REF! #REF! #REF! #REF!
Total cost of side drains works 474467 1078
E. Road Logo, other Road Furniture including Road safety signs
Number Cost in Rs Avg. cost / km
Number of Boards 31 88420
Total cost of road furniture 593998 19161
F. Any other Provisions ((utility shifting + DPR preparation)) 52600
Total Cost of the Project (Rs) 13366864
13. Five Year Routine Maintenance
To be estimated as per provision of Operation Manual Year Cost in lakhs % Cost Cost /km
Total Maintenance Cost Total 8.52 5.28 4.00
Renewal coat after 5 years 42.60 26.42 20.00
Maintenance after 6th years renewal coat
Total Maintenance Cost Total 8.52 5.28 4.00
Total cost of Renewal coat with maintenance 51.12 31.71 24.00
Total cost of maintenance and Renewal coat with maintenance 59.64 36.99 28.00
Total cost of maintenance and Renewal coat with maintenance with 18% GST 70.38
14. Whether the road has Geometrics as per Rural Roads Manual RRM / Latest Circulars of NRIDA. Yes NO
15.Whether C.D.works / Protection works are provided as per RRM / Latest Circulars of NRIDA/ Respective Codes of IRC. Yes No
16.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase Vetted at NRIDA Year
17. Sources and the Lead distances of Materials are as under
Material Source Lead Dist. (Km) Material Source Lead Distance
Earth Local 2 Cement Korba 42
Murrum Local 2 Emulsion Vishakapatnam 700
Aggregate Daija 10 Bitumen Vishakapatnam 700
Sand Arpa river 25 Steel Korba 42
Certified that information provided is true
Prepared By Checked By Technical Scrutiny at STA done by:
Counter Signatures of
Co-ordinator STA :
To be filled by State Technical Agency
Name of the STA: VSS University of Technology, Burla, Sambalpur (Odisha)
Name of Road : Rajpur Sidhbaba road To Bijaghora Pahuch marg Yes / NO to be filled by STA in own handwriting
18 Is the Proposed Road entered on the OMMAS under PMGSY III proposal module:
(Data entries to be verified by STA before Clicking the Propopsal) Yes / No
19 Have you satisfied yourself that the proposed road is a part of DRRP
20 Are you satisfied with the following
Engineering Surveys (L section, X section on A3 size paper must be verified)
Soil/ Material Investigation ( CBR, Density, LL, PI, Gradation to be verified)
Whether Traffic Surveys / count has been done by third party
Hydraulic Studies.
( Catchment for structures with more than 2 Vents to be verified from topo sheet. Location and requirement of all CD structures to be verified from L section )
21 In case , Traffic is projected beyond T 7 Category and road designed using IRC 37 are you satisfied with the reason given by PIU
Whether 3rd party Traffic verification / Axle load Surveys carried out on such roads designed with more than 1 MSA traffic and carriageway width of 5.5 m
22 In case, sub grade CBR is less than 5; has Soil Stabilisation etc. been proposed
( If not , specific Reasons given by PIU) Yes / No
23 Is the design of the following elements as per Rural Roads Manul / Circulars of NRIDA:
Alignment & Geometrics
Location and type of CD works and Side drains
Integration for Cross and longitudinal Drainage
Protection Works
24 Is the design of flexible Pavement as per IRC SP: 72- 2015 and design of Rigid Pavement as per IRC SP:62- 2014 .
Is the design of flexible Pavement as per IRC 37 2018 and design of Rigid Pavement as per IRC SP:58- 2002.
25 Does the proposal have provisions for
PMGSY Logo Sign Boards and Information Board
Guard Stones (where necessary )
Traffic Sign Boards (as necessary)
26 Are you satisfied with the Road safety provisions made in the DPR
Whether Road Safety Audit certificate attached in case of the proposed length is more than 5 Km
27 Secific Remarks, if any, by STA
( Specific remarks of STA about the overall project are necessary on each DPR)
Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR provided by PIU Engineers .
The Proposal after final Correction is entered on the OMMAS.The Propasal may be considered for clearance.
Technical Scrutiny at STA done by:
Signature Co-ordinator STA:
PRADHAN MANTRI GRAM SADAK YOJANA
(Ministry of Rural Development, Govt. of India)
Name of the Block Total of Village Unconnected Habitations Name of Road Rajpur Sidhbaba road To Bijaghora Pahuch marg
Thakatpur 1 Cost Rs. 161.23/-lakhs
Typr of Work Block No of Roads Total length of Road (Km) No. of New CD Structure Estimated Cost No of New Village Connected
Pavement from format- F-6 CD Structure From Format F-7 Total (6+7) Total Village SC/ST Village
New connectivity Thakatpur 1 2.130 3 141.94 19.29 161.23 1 1
Consultant Sub. Engineer Assistant Engineer 0
Anand Vibhor 0 0 0 CGRRDA ,
Pavement layer Detail
FORMAT :- F- 2 A
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Length of Road:- 2.13 Km
Block - Thakatpur
District:- Bilaspur
Details of Thickness & Cost for Pavement Layer
Sr.No From To New Construction/ Upgration (Use N/U) Facility Accessed (A/B/C/D) Road Length (Km) Existing Surface Type Existing Crust thickness (mm) Site Clearance+Setting out Surface draain Earthwork Drainage Layer/Modified Soil Granular Sub base Preparation G.S.B Dry Lean Concrete/cell filled concrete Concrete M-30 / roller compacted concrete/Panelled concrete WBM 2 WMM WBM 3 Earthern Shoulder Hard Shoulder/CC shoulder protection work - Retaining/Toe Wall Primer Coat Tack coat BM OGPMC /MSS Seal coat Dismentling Structures Dismentling Flexible Pavement Dismentling rigid Pavement CC Drain Pitching Road Furniture Field Crossing DPR Preperation E.P. Shifting Inauguration Stone Total cost of Road Sum of (10) to (24) in Rs.
1 Rajpur Sidhbaba road Bijaghora Pahuch marg 0 175 100 100 0 150 0 375 50 20mm
Consultant Sub. Engineer Assistant Engineer 0
Anand Vibhor 0 0 0 CGRRDA ,
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
(Ministry of Rural Development, Govt. of India)
ROADS PROPOSED IN PMGSY RURAL CONNECTIVITY ( CROSS DRAINAGE STRUCTURES)
Name of Road Rajpur Sidhbaba road To Bijaghora Pahuch marg District:- Bilaspur Block Thakatpur
S. No . Name of Road New Construction/ Upgradation ( Use N/U) Road Length ( Km) Exsting CD Structure by Type Detail of Proposed CD Structure by Type Total Cost of Proposed CD Structures Total Cost of Pavement From Formate F-2A Total Cost of the Road
Hume Pipe Culvert Box/ Arch Culvert Minor Bridge Cost Slab Culvert Hume Pipe Culvert Box/ Slab Culvert Minor Bridge
No. Dia No. Length No. Length No. Length No. Dia No. Length No Length
1 Rajpur Sidhbaba road To Bijaghora Pahuch marg N 2.13 0 1.50 3 1000 1635109 11975905 13611014
Consultant Sub. Engineer Assistant Engineer 0
Anand Vibhor 0 0 0 CGRRDA ,
PRADHAN MANTRI GRAM SADAK YOJANA(PMGSY)
DETAILS OF EXISTING ROADS (FOR UPGRADATION)
BLOCK :- Thakatpur DISTRICT Bilaspur
Sr No. Name Of Road Road Length (km) Road Connecting to Facilities accosed (Use A/B/C/D) Traffic Per Day Existing Road Details
Total Motorised Total LCV/Bus/Truck/Agricultural Tractor/Trailor Land Width (m) Road Width (m) Embankment WBM Layer Bituminous Layer
Height (m) Width (m) Width (m) Thickness (mm) Type Width (m) Thickness (mm)
1 Rajpur Sidhbaba road To Bijaghora Pahuch marg 2.13 VR D 337 106 8 to 10 3 to 3.6 0.6 5 to 6
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
Association of Routes
Name of Road Package No. Habitation Name Habitation served with Population
SC Population % of SC Population with respect to total Population ST Population % of ST Population with respect to total Population Other than ST/SC population Total population
Rajpur Sidhbaba road To Bijaghora Pahuch marg Rajpur
PRADHAN MANTRI GRAM SADAK YOJANA
ABSTARCT Format F-6
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
District :- Bilaspur BLOCK :- Thakatpur
Length :- 2.13 Km
S.No. Item of work Length of Road (Km) Cost Total cost
1 PAVEMENT WORK
I Flexiable Pavement 2.130 8642304
II Protection Work with Drain 2739602
III Rigid pavement 0.000 0
IV Exi. pavement 0.000
IV Road Furniture 593998
V Length of proposed culvert 0.000
VI D.P.R Preparation
Total Length of Road (Km) 2.130
Type of CD Location Cost/CD Total cost
I HPC 1x1000 mm dia HPC 66 267672
II HPC 1x1000 mm dia HPC 786 267672
III HPC 1x1000 mm dia HPC 1020 832093
IV HPC 1x1000 mm dia HPC 1100 267672
V HPC 1x1000 mm dia HPC 1245
VI HPC 1x1000 mm 0
VII Slab culvert 1 x 2.00 m
VIII Slab culvert 1 x 2.00 m 0
IX Slab culvert 1 x 1.50 m 0
X HPC 1x1000 mm dia HPC 0
XI Slab culvert 1 x 6.00 m 0
XII HPC 1x1000 mm 0
XIII HPC 1x1000 mm 0 12028505.06
XIV HPC 1x1000 mm 0
XV HPC 1x1000 mm 0 120.29 Lack
XVI HPC 1x1000 mm 0 #DIV/0!
XVII HPC 1x1000 mm 0
XVIII HPC 1x1000 mm 0
XIX Slab culvert 1 x 2.00 m 0
XXI Slab culvert 2 x 6.00 m 0
XXII Slab culvert 2 x 6.00 m 0
XXIII HPC 1x1000 mm 0
XXIV Slab culvert 1 x 2.00 m 0
XXV HPC 1x1000 mm 0
XXVI HPC 1x1000 mm 0
XXVII HPC 1x1000 mm 0
XXVIII HPC 1x1000 mm 0
XXIX Slab culvert 1 x 3.00 m 0
XXX #REF! #REF! #REF!
XXXI #REF! #REF! #REF!
XXXII #REF! #REF! #REF!
XXXIII #REF! #REF! #REF!
XXXIV #REF! #REF! #REF!
XXXV #REF! #REF! #REF!
XXXVI #REF! #REF! #REF!
XXXVII #REF! #REF! #REF!
XXXVIII #REF! #REF! #REF!
Sub Total for CD 1,635,109
Total Cost of road with GST Rs.(Govt. of India) 16,060,996
3 Extra Work Cost Borne by State Govt (utility shifting + DPR preparation) 52600
Add GST 18% 9,468
Total Cost of road with GST Rs. 16,123,064
4 Road Maintenance 852,000
Add GST 18% 153,360
Cost of Maintenance with GST 1,005,360
Total Cost of Road with Maintenance 14,515,614
Cost of road per Km ( lakh) 6,814,842
Total Cost of Road with Maintenance with GST 17,128,424
Cost of road per Km with GST( lakh) 80.415
Renewal cost Rs 2000000.00 per km 4,260,000
Five year maintenance after renewal Rs 400000.00 per km 852,000
Add GST ( on renewal + maintenance after renewal ) 18% 920,160
Total cost of renewal + maintenance with GST 6,032,160
Grand total 23,160,584
Consultant Sub engineer Asst. Engineer 0
DETAILED COST ESTIMATE
Name of Road - Rajpur Sidhbaba road To Bijaghora Pahuch marg Item from To Total Grand Total Format F-6
Length of Road:- 2.13 Km BT road 0 2130 2130 2130
Dist. :- Bilaspur 0 0 0
Block :- Thakatpur 0 0 0
Panal concrete 0 0 0 0
Cell fill 0 0 0 0
Total length 2130
Sr. no SSR I.No. Description of Item No. Length Width Thicknes Qnty. Unit Rate(Rs) Amount
1 2.1 Setting out :- Setting out work complete wiyh construction of bench mark ( min 1 / km ), working bench mark ( min 4/km ) and near all bridges & CD works made of bricks/ stone masonary or concrete and reference pillars made of Precast concrete poles/ concrete filled 100 mmdia AC pipe @ 100 m interval of as required on both sides of the formation width , marking on central line , setting out curves and recording of central line levels and other required levels and distance etc. including setting out of CD & bridges with required reference pillars and marking etc. as directed by Engineer - in - charge 1 2.130 2.130 km 14968.00 31882
2 2.3(A) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(A) In area of non throny jungle 2 2130 2.00 8520.00 sqm 5.00 42600
3 2.2 Clearing Grass and Removal of Rubbish: Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. 2 2130 1.50 6390.00 sqm 1.00 6390
5 2.11 Dismantling of cement concrete pavements Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000m. Rd 2270 to 2370 100 3.50 0.15 0.00 Cum 1680.00 0
4 3.1 Scarifying Existing Granular bituminous Surface to a Depth of 100 mm Scarifying existing granular/bituminous surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.
6 3.2 Compacting original ground / Existing Embankement (i)Compacting original ground supporting embankement/subgrade Loosing , levelling and compacting original ground supporting embankement / subgrade to facilitate placement of first layer of embankement , scarified to a depth of 150 mm mixed with water at OMC and then compacted by compacted by rolling to achieve minimum dry density as given in table 300.1 and 300.2 for embankement construction as per Technical Specification Clause 301.4.1
2.10 (A) Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202 (A) Upto 600 mm dia Hume pipe - Rd 12 , 2515 2 7.5 15.0 Rmt 164.00 2460
2.10 (B) (B) above 600 mm to 900 mm dia Hume pipe - 7.5 0.0 Rmt 222.00 0
2.10 (C ) (C) 900 mm dia Hume pipe - Rd 1200 7.5 0.0 Rmt 380.00 0
6 2.6 ( B) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (B) Cement Concrete
7 2.6(C) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (C) Reinforced Cement Concrete
8 2.8(A) Dismentling of Stone masonary as per Technical Specification clause 202Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of stone masonry i/c of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A) Rubble Stone masonary in lime / cement/ mud mortar
9 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3
As per earth work calculation sheet 353.36
For 600 mm dia Field crossing 6 10.00 1.00 0.9 54.00
For CC drain Rd 1710 to 2150 RHS 1 440 0.9 0.6 237.60
11 3.5(ii) Excavation in Soil by manual/Machinery means and Tippers with disposal upto 1000 m Excavation for roadwork in soil with manual/Machinery including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross- sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
10 3.3(i) Construction of embankment with material obtained from roadway cutting:--a.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5(80% qty utilised from road way cutting qty) Cu.m 55.00
11 3.4(ii) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5)
As per earth work calculation sheet 11931.18
Deduct Qty obtained from roadway cutting 282.68
Balance qty required for embankement filling 0
12 3.12 (a) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR more than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b). 9525 0 0.00
Earthen shoulder - avg width ( 2.365+2.065)/2= 2.215 m 0 2.215 0.150 0.00
for bus/vehicle stopage Lay Bay 1 0 0.00
13 3.12 (b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
For Subgrade 2130 11.08 0.200 0.00
deduct existing crust ( (i.e - 200 GSB + 150 WBM) But Top 75 mm thickness is not in use , hence deduct only 275 mm Rd 0 to 5625 & 5860 to 8500 - 3.75 m width 8265 3.75 0.275 0
deduct existing crust ( (i.e - 200 GSB + 150 WBM) But Top 75 mm thickness is not in use , hence deduct only 275 mm ( 16520 to 17395 , 17592 to 21900 , 22103 to 22838 & 23237 to 24400) - 3.00 m width 7331 3.00 0.275 0
Side of WMM & BT (170 mm)
for bus/vehicle stopage Lay Bay 1 0 0.00
14 3.8(i) Surface drain in soil- Construction of unlined surface drains of average cross section 0.4 sqm in soil to specified lines , grades , levels and dimension . Excavated material to be used in embankement with a lift upto 3 m and lead of 50 m ( average lead 25 m ) as per Technical Specification Clause 307 - Rd 330 to 460 R/S , 700 to 840 R/S , 900 to 1050 L/S , 1100 to 1200 both side , 1250 to 1350 L/S , 2280 to 2390 L/S & 2780 to 2850 R/S 1 400 400.00 Rmt 63.00 25200
15 4.1(a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a)Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Deduct for existing Road Rd 0 to 3600 m 3600 2.8 0.175 0.00
Deduct for existing 2130 3.75 0.175 0.00
for profile & camber correction 2130 1.875 0.065 0.00
Widening in shoulder 2130 0.00
Camber Correction 2130 1.5 0.050 0.00
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 5 6.15 2.95 0.175 15.87
Approach for Anganbadi School at Rd 500 m LHS 1 80.0 4.05 0.175 56.70
Approach for Anganbadi School at Rd 2130 m RHS 1 70.0 4.05 0.175 49.61
Approach for Anganbadi School at Rd 1130 m RHS 30.0 4.05 0.175 0.00
Approach for School at Rd 2220 m RHS 60.0 4.05 0.175 0.00
Approach for Anganbadi School at Rd 2860 m LHS 30.0 4.05 0.175 0.00
Extra Widining ( 3% ) 45.29
for bus/vehicle stopage Lay Bay 1 0 0.00
10 4.1(d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (d)Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available.
Disintegrated rock i.e. mourum having CBR value not less then 15% and PI & LL not more then 6 and 25 respectively (with prior permission of Chief Engineer) 2130 0.875 0.3 0
14 4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401. 358.00
For Exi. CC Road 0 0.9 0.2 0.00
Rate as per earthan shoulder(addl rate given in State govt) 0.00 Cu.m 180.00 0
19 4.7(1) WBM Grading 2:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405.WBM Grading 2 2130 5.65 0 0 Cu.m 1374.00 0
16 4.8 Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Balance WMM as per design(100 mm ) 30 3.85 0.100 0.00
For camber correction 30 1.925 0.067 0.00
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 5 6.15 2.95 0.150 13.61
Approach for Anganbadi School at Rd 500 m LHS 1 80 3.75 0.150 45.00
Approach for Anganbadi School at Rd 2130 m RHS 1 70 3.75 0.150 39.38
Approach for Anganbadi School at Rd 1130 m RHS 0 30 1.05 0.100 0.00
Approach for School at Rd 2220 m RHS 0 60 3.85 0.225 0.00
Approach for Anganbadi School at Rd 2860 m LHS 0 30 3.85 0.100 0.00
Extra Widining ( 3% ) 35.94
for bus/vehicle stopage Lay Bay 1 0 0.00
19 4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Deduct if hand broken stone aggregates used Rs 200 / cum )
Grading No. 3 material 53mm To 22.4mm 0 3.75 0 0.00
Extra Widining at Structure 3 6.7 0.000 0.00
Extra Widining ( As per Curve design ) 0.00 0 0.00
17 5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 5 6.15 2.95 90.71
Approach for Anganbadi School at Rd 500 m LHS 1 80 3.75 300.00
Approach for Anganbadi School at Rd 2130 m RHS 1 70 2.95 206.50
Approach for Anganbadi School at Rd 1130 m RHS 0 30 1.50 0.00
Approach for School at Rd 2220 m RHS 0 60 3.75 0.00
Approach for Anganbadi School at Rd 2860 m LHS 0 30 3.75 0.00
Extra Widining ( 3% ) 239.63
for bus/vehicle stopage Lay Bay 1 0 0.00
18 5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 5 6.15 2.95 90.71
Approach for Anganbadi School at Rd 500 m LHS 1 80 3.75 300.00
Approach for Anganbadi School at Rd 2130 m RHS 1 70 2.95 206.50
Approach for Anganbadi School at Rd 1130 m RHS 0 30 1.50 0.00
Approach for School at Rd 2220 m RHS 0 60 3.75 0.00
Approach for Anganbadi School at Rd 2860 m LHS 0 30 3.75 0.00
Over Existing CC Road 970 3.75 0.00
Extra Widining ( 3% ) 239.63
for bus/vehicle stopage Lay Bay 0.00
19 5.6 Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 Bitumen(S-65) VG-30
Extra Widining at Structure 5 6.15 2.95 0.00
Over Existing CC Road 0 970 3.75 0.05 0.00
Extra Widining ( As per Curve design ) 0.00 0.05 0.00
for bus/vehicle stopage Lay Bay 1 0 0.00
20 5.13(ii) 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight. Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification (ii) Bitumen (VG-30)
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 5 6.15 2.95 90.71
Approach for Anganbadi School at Rd 500 m LHS 1 80 3.75 300.00
Approach for Anganbadi School at Rd 2130 m RHS 1 70 2.95 206.50
Approach for Anganbadi School at Rd 1130 m RHS 0 30 1.50 0.00
Approach for School at Rd 2220 m RHS 0 60 3.75 0.00
Approach for Anganbadi School at Rd 2860 m LHS 0 30 3.75 0.00
Over Existing CC Road 970 3.75 0.00
Extra Widining ( 3% ) 239.63
for bus/vehicle stopage Lay Bay 0 0.00
21 5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B(ii) Bitumen (VG-30)
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 5 6 2.95 90.71
Approach for Anganbadi School at Rd 500 m LHS 1 80 3.75 300.00
Approach for Anganbadi School at Rd 2130 m RHS 1 70 2.95 206.50
Approach for Anganbadi School at Rd 1130 m RHS 0 30 1.50 0.00
Approach for School at Rd 2220 m RHS 0 60 3.75 0.00
Approach for Anganbadi School at Rd 2860 m LHS 0 30 3.75 0.00
Extra Widining ( 3% ) 239.63
for bus/vehicle stopage Lay Bay 1 0 0.00
5.7 Mix Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509, Viscocity grade (VG) Bitumen specification as per IS 73:2006
Type B (II)Bitumen (VG-30)
Extra Widining at Structure at Rd 12 , 180 , 1320 , 2515 6.15 2.95 0.00
Extra Widining ( 3% )
7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 600 mm Dia field crossing -
7.6 Providing and laying reinforced cement concrete pipe NP3 for culverts/Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
(D) 300 mm Dia -4no. from( Rd 2260 to 2730 m) 0 7.5 0 Rmt 1129 0
Total of (A) Flexible Pavement 8642304
(B) Pucca Drain
22 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
Widening of Ext CC road from 3.0 to 3.75 m - Rd 29470 to 30440 = 970 m 970 0.75 0.2 0.00 cum 3731.00 0
22 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge.
For CC drain Rd 1710 to 2150 RHS
For CC Shoulder Rd 2650 to 2830 & 5520 to 5820 m 0 1.00 0.15 0.000
6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications. Rd 450 to 550 m in both side 100 0.000 Rmt 2471.00 0
23 7.10 (iv) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20 ( For drain Cover - ) 100 1.50 0.70 0.1 10.50 Cum 4280.00 44940
24 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 ( For drain Cover )
Main bar 12 mm dia 150 mm c/c 100 11 0.62 0.89 606.98
Distribution bar 10 mm dia 200 mm c/c 100 4 1.42 0.617 350.46
Total of (B) Pucca Drain 474467
(C) Protection Work
25 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .
Oridanary soil (i) upto 3 m depth
both side of existing CDs at RDs 645 & 850
Long wall 2*2 3 0.6 0
Short wall 2*4 3 0.6 0
Appron 2*2 3 3 0
Long wall 1*2 4 0.6 1 0
Short wall 1*4 3 0.6 1 0
Appron 1*2 4 3 0.8 0
both side of existing CDs at RDs 2300,2500,3115,3500
Retaining Wall - 265 to 335 RHS & 2730 to 2770 LHS 1 140.00 1.70 1.4 333.20
26 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Side of retaning Retaining Wall (0.15+1.15)/2 = 0.65 m 1 140 0.650 3.0 273.00 Cum 732.00 199836
27 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
both side of existing CDs at RDs 645 & 850
Long wall PCC 2*2 3 0.60 0.00
Short wall PCC 2*4 3 0.60 0.00
Inner side 2 4 7.50 0.00
Long wall PCC 1*2 4 0.60 0.20 0.00
Short wall PCC 1*4 3 0.60 0.20 0.00
Retaining Wall - 265 to 335 RHS & 2730 to 2770 LHS 1 140 1.70 0.2 47.60
Toe wall - Rd 400 to 420 R/S & 1190 to 1220 L/S
3 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
(I) Stone/Boulder Rd 810 to 880 LHS 1 0 2.00 0.23 0.00 Cum 1440.00 0
27 7.31 Providing and laying cement concrete wearing courese M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 ( Rd 310 , 3475 ,3775 , 4250 = 4x15 = 60 m ) 60.00 7.50 0.075 0.00 Cum 9091.00 0
6 7.41 (iii) Filler Joint III) Providing and fixing 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 0 8.10 0.00 Rmt 141.00 0
7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
For Raising ht of parapet wall in Ext Culvert -Rd 2300 , 2500 , 2850 , 3115,3500 5*2 10.00 0.40 0 0.00 cum 5223.00 0
7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
50Kg per cum for parapet wall 0.00 mt 54560.00 0
7 7.36 (i) P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) Nominal mix (1:2.5:5) 2 0.00 6.70 0.15 0.00 Cum 3498.00 0
8 7.37 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 2 0.00 6.70 0.2 0.00 Cum 10416.00 0
7.2(i) Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Total of (C) Protection Work 2265136
( D) Rigid Pavement
4.1(d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (d)Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available.
junction at Rd 720 in both side 30 4.05 0.15 0.00
Widening of road (3.0 m to 3.75 m )
4.8 Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
junction at Rd 720 in both side 0 30 3.75 0.075 0.00
4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401.
7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 15(Nominal mix (1:2.5:5)
For CC Shoulder Rd 450 to 610 & 1560 to 1650 0 0.9 0.175 0.00
Widening of road (3.0 m to 3.75 m )
For Rocky area , Profile & camber correction with M15 ( Rd 360 to 660 & 2460 to 2830) 670 3.75 0.100 0.00
Profile & camber correction of old Ext CC road 0.2 0 3.75 0.15 0.00
6.1 PWD SOR 2015 Dry Lean Cement Concrete Sub-base as per IRC:SP-49 (Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601.)
6.1(ii) Cement Concrete Pavement (ii) Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
6.2 Roller Compacted Concrete Pavement Construction of Roller Compacted Concrete Pavement (RCCP) with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum aggregate cement ratio of 5:1 mm and with minimum cemnt content of 310 kg per cum, aggregate gradation to be as per Table 602.2 after blending, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with 80-100 kN smooth wheel, tandem vibratory roller, to achieve, the designed flexural strength, finishing and curing as per drawings and Technical Specification Clause 1502
6.7 Cement Concrete cell fill Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Approach at Rd 0 10 3.750 0.1 0.00
6.8 Construction of Panel concrete , plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.PCC Grade M-30 Each panel(0.5mx0.5m to 1.00 mx1.00m) thickness 100 mm
junction at Rd 720 in both side 0 30 3.750 0.10 0.00
Total of ( D) Rigid Pavement 0
(E) TRAFFIC SIGNS AND OTHER APPURTENANCES
28 9.2(A) Cautionary, mandatory, informatory direction and place identification sign boards. (A)Semi-Reflective Traffic signs upto 0.90 sqm Direction and place indentification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 0.90 0.90 0.00 sqm 4729.00 0
8.4 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Retro- reflectrorized Traffic signs (Providing and fixing of retroreflectrorized cautionary, mandatory and informatory sign as perIRC:67-2012 made of Micro prismatic grade type reflective sheetingvide clause 801.3, fixed over aluminum sheeting, 1.5 mm thicksupported on a mild steel frame of size 40 x 40 x 5 mm and mild steelangle iron post 75 mm x75 mm x 6mm firmly fixed to the ground bymeans of properly designed foundation with M15 grade cementconcrete 45 cm x 45cm x 60cm, 60 cm below ground level as perapproved drawing) ( i ) 90 cm equilateral triangle 0.00 each 5170.00 0.00
9.21(B) Retro-Reflective Traffic signs Direction and place identification signs up to 0.9 Sqm. Providing and erecting direction and place identification of Retro reflectivesheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mmthick M.S. Sheet duly stoveenameled paint white colour in front and greycolour on back with reflective border of 70 mm width and required message,letters, figures with reflective tape of engineering grade as per MORI)specifications ofrequired shade and colour. Supported and welded on twonos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height dutystrengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed tothe ground by means of properly designed foundations with M-15 gradecement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 18 0.90 0.90 14.58 sqm 6244.00 91037.52
29 9.16 Providing and fixing LOGO BOARD Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 1 1.00 Each 6626.00 6626
30 9.2(B) Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 8 1.20 1.20 11.52 sqm 4667.00 53764
31 9.8 Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) 5th Kilometre Stone (precast) 0 0 Each 3700.00 0
(ii) Ordinary Kilometer Stone (Precast) 4 4 Each 2194.00 8776
(iii) 200 m stone (precast) 12 12 Each 463.00 5556
32 9.17 Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 180 180 Each 472.00 84960
9.21(A) A typical design of PMGSY informatory Sign Board is shown in fig. 12ffi.1The specification and installation details ofthe typical sign board are givenbelow: (i) The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7The top most plate will be in diamond shape of 600 mn x 600 mm sizr, rivetedover welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back onedges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s.angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The mainIower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S.angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets overangle iron frame will be done neatly to have plain surface on one side. Theangle iron frames of the lower most plate and the middle plate will be weldedto two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mmapart centre to centre. The top of the middle plate wilt be flushed with the topof 75 nm dia medium steel tube posts and these posts will be embedded incement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm belowground level. The height of bottom of the lower nost plate will be 1200 mmfrom normal ground level and the bottom of middle plate will be 100 mmabove the top level of the lower most plate. The diamond shaped platemounted over angle iron frame will be connected to middle plate by squaremedium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of100 mm between the diamond shaped plate and middle plate and this squaresection will be welded to the bottom point of the diamond shaped plate.(ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo ontop plates shall be as per clause 1701.4.6 messages/Borders. All the section offrame and posts will be painted with primer and two coats of Epoxy paint Thesteel tube below ground level will be painted with three coats of Epoxy paintThe design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height. 2 2 No. 17699.00 35398
33 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project (B) Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on bothsides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 0 Each 13749.00 0
34 9.15 (A) 10.15(A) Providing and fixing 'Citizen Information Board' of PMGSY Project(A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 2 2 Each 14015.00 28030
35 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.)
On center line of road 2130.00 0.10 0.00
All junction 9.00 15.00 0.1 0.00
36 9.19(A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. A For 7.50 M Formation Width 1 1 no 22547.00 22547
35 8.23 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Providing & Fixing tree studs in Square/ Round shape of 4” side/diameter made of 2 mm aluminum substrate (Confirming to IS:736-Material Designation 24345 or 1900) end reflective surface of High Intensity grade as specified in section 800.1.3 of MORT&H duly treated with HLVA and fixing the same with four Nos. high strength nails confirming to 1S:1367 on trees at site each 750.00 0 each 67.00 0
Total of (E) TRAFFIC SIGNS 593998
Total Pavement Cost 11975905
(G) State funded works
38 2.14 Removal of Telephone/Electric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202. 1 0 0.00 Nos 100000.00 0
Inauguration Stone 1 1 1 Nos 10000.00 10000
Rate diff for Hard shoulder 0.00 cum 178.00 0
(F)Preperation of DPR with survey 1 2.13 2.13 km 20000 42600
Total work under State fund 52600
GRAND TOTAL 12028505
(H) CD Repair work and provision of field crossing
7 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
(I) Stone/Boulder
41 10.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301
42 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Total of (G) CD dismenteling and repair cost 0
S.No. Item of work Cost total cost
(A ) Pavement Work
1 Flexiable Pavement Cost 8642304 11975905
2 Protection work 2265136
3 Pucca Drain 474467
4 Rigid Pavement 0
5 Road furniture 593998
1 1x 1.50m Slab culvert (1 no) 0
2 1x6.0 m Slab culvert ( 1 no) 0
Total cost Of road ( A + B ) 13314264
Add 12 % GST 1597712
Total Cost including GST 14911976
(C ) Cost of utility shifting & DPR preparation 52600
Add 12 % GST 6312
Total cost 58912
(D) Maintenance cost 852000
Add 12 % GST 102240
total maintenance cost incl. GST 954240
Total cost of Road with Maintenance ( Excl. GST) 14218864
Total cost of Road with Maintenance ( Incl. GST) 15925128
Consultant Sub engineer Assistant Engineer 0
0 PIU PMGSY PIU PMGSY 0 0
Bill of Quantity
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Rajpur Sidhbaba road To Bijaghora Pahuch marg
Length of Road:- 2.13 Km SOR :- FEB - 2018
Sr. no SSR I.No. Description of Item Unit Rate Qty Amount
1 2.1 Setting out :- Setting out work complete wiyh construction of bench mark ( min 1 / km ), working bench mark ( min 4/km ) and near all bridges & CD works made of bricks/ stone masonary or concrete and reference pillars made of Precast concrete poles/ concrete filled 100 mmdia AC pipe @ 100 m interval of as required on both sides of the formation width , marking on central line , setting out curves and recording of central line levels and other required levels and distance etc. including setting out of CD & bridges with required reference pillars and marking etc. as directed by Engineer - in - charge km 14968.00 2.13 31882
2 2.3(A) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. sqm 5.00 8520.00 42600
3 2.2 Clearing Grass and Removal of Rubbish: Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. sqm 1.00 6390.00 6390
5 2.11 Dismantling of cement concrete pavements Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000m. Cum 1680.00 0.00 0
4 3.1 Scarifying Existing Granular Surface to a Depth of 50 mm Scarifying existing granular/bituminous surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. sqm 15.00 90.00 1350
5 3.2 Compacting original ground / Existing Embankement (i)Compacting original ground supporting embankement/subgrade Loosing , levelling and compacting original ground supporting embankement / subgrade to facilitate placement of first layer of embankement , scarified to a depth of 150 mm mixed with water at OMC and then compacted by compacted by rolling to achieve minimum dry density as given in table 300.1 and 300.2 for embankement construction as per Technical Specification Clause 301.4.1 ( Rd 700 to 850 m ) Cum 21.00 0.00 0
5 2.10 (A) Removing all types of Hume pipes and stacking within a lead of 1000 m i/c Earthwork and Dismantling of masonary works as per Technical Specification clause 202 (A) Upto 600 mm dia Hume pipe - Rmt 164.00 15.00 2460
6 2.10 (B) (B) above 600 mm to 900 mm dia Hume pipe - Rmt 222.00 0.00 0
7 2.10 (C ) (C) 900 mm dia Hume pipe - Rmt 380.00 0.00 0
8 3.8(i) Surface drain in soil- Construction of unlined surface drains of average cross section 0.4 sqm in soil to specified lines , grades , levels and dimension . Excavated material to be used in embankement with a lift upto 3 m and lead of 50 m ( average lead 25 m ) as per Technical Specification Clause 307 Rmt 63.00 400.00 25200
9 2.6 ( B) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (B) Cement Concrete Cum 414.00 0.00 0
2.6(C) Dismentling of Structures Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of masonry , cement concrete , wood work i/c T&P and scaffolding wherever necessary Sorting the dismantled material disposal of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (C) Reinforced Cement Concrete cum 1045.00 0.00 0
11 2.8(A) Dismentling of Stone masonary as per Technical Specification clause 202. Dismantling of Exisisting structure like culvert , bridges retaining walls and other structure comprising of stone masonry i/c of unserviceable material with all lifts and lead of 1000m as per Technical Specification clause 202 (A) Rubble Stone masonary in lime / cement/ mud mortar Cum 250.00 0.00 0
10 3.5(i) Excavation in cutting in soil with lead upto 50m:--Excavation for roadway in soil for caryying of cut earth to embankment site with all lift and lead upto 50m as per technical specification clause no. 302.3 Cu.m 65.00 644.96 41922
13 8.3(ii)A Excavation in hilly areas in soil by mechanical means including cutting andtrimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per technicalspecification cum 85.00 0.00 0
11 3.3(i) Construction of embankment with material obtained from roadway cutting:--a.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Cu.m 55.00 282.68 15548
12 3.4(ii) Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5) Cu.m 176.00 11648.50 2050135
13 3.12 (a) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR more than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b). Cu.m 180.00 1669.92 300586
17 3.12 (a) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Cu.m 200.00 1480.99 296198
14 4.1(a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a)Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III) Cu.m 650.00 1858.24 1207855
19 4.1(d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (d)Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available. Cu.m 1150.00 0.00 0
15 4.12 Construction of hard shoulder as per technical specification clause 407:---Construction of hard shoulder with selected granular material having CBR value not less than 15 including all leads & lift, watering & compaction with smooth wheeled roller to achieve the desired density as per technical specification clause 407 & 401. Cu.m 358.00 0.00 0
16 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 Cum 911.00 18.88 17201
22 4.8(1) WBM Grading 2:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405.WBM Grading2 Cu.m 1374.00 0.00 0
17 4.8 Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. Cu.m 1478.00 1487.30 2198230
24 4.7(3) WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to prope Cu.m 1513.00 0.00 0
18 5.1 Prime coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 Sq.m 43.00 9859.34 423952
19 5.2(ii) Tack coat (ii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Sq.m 13.00 9859.34 128171
20 5.6 Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 Bitumen(S-65) VG-30 cum 7593.00 0.00 0
5.13 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight. Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification sqm 128.00 9859.34 1261995
21 5.5B(ii) Seal Coat Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Case II - Type B sqm 43.00 9859.34 423952
5.7 Mix Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509, Viscocity grade (VG) Bitumen specification as per IS 73:2006 Type B (II)Bitumen (VG-30) sqm 140.00 0.00 0
22 7.4(B) Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(B)1000 mm dia Rmt 4632.00 37.50 173700
23 7.6 (A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106 (A) 600 mm dia Rmt 2928.00 60.00 175680
35 6.1 Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including eveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Cum. 5097.00 0.00 0
6.7 Cement Concrete cell fill Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 cum 5836.00 0.00 0
6.1 PWD SOR 2015 Dry Lean Cement Concrete Sub-base as per IRC:SP-49 (Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601.) cum 2332.00 0.00 0
6.2 Roller Compacted Concrete Pavement Construction of Roller Compacted Concrete Pavement (RCCP) with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum aggregate cement ratio of 5:1 mm and with minimum cemnt content of 310 kg per cum, aggregate gradation to be as per Table 602.2 after blending, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with 80-100 kN smooth wheel, tandem vibratory roller, to achieve, the designed flexural strength, finishing and curing as per drawings and Technical Specification Clause 1502 cum 4529.00 0.00 0
6.8 Construction of Panel concrete , plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.PCC Grade M-30 Each panel(0.5mx0.5m to 1.00 mx1.00m) thickness 100 mm cum 5680.00 0.00 0
24 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge. cum 3811.00 99.00 377289
6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications. Rd 450 to 550 m in both side Rmt 2471.00 0.00 0
7.10(iv) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20 ( For drain Cover - ) Cum 4280.00 10.50 44940
25 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth Cum 253.00 599.87 151767
26 7.1(II) Ordanary Rock ( Not Requiring Blasting) Cum 316.00 0.00 0
27 7.10 (I) Providing concrete for plain/ reinforced concrete in open foundations complet as per drawings and technical specification Clause 802,803,1202 & 1203 I. P.C.C. Grade M-10 cum 3648.00 0.00 0
28 7.10(II) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C.M-15 Cum 3731.00 698.09 2604567
29 7.10 (V) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C -M-25 cum 4605.00 0.00 0
30 7.26 Providing pressure relief pipes 100 mm dia in bottom Slab of box cell Nos on a filter media base of 500 mm x 500mm as per drawing and as per drawing and technical specificationsClause 1205.5.7 No 546.00 0.00 0
31 7.18(I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C grade M 15 (Nominal mix (1:2.5:5) Cum 3848.00 102.38 393954
32 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix) Cum 5223.00 0.00 0
41 7.27(I) (i) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20 (i) For nominal mix 1:2:4 Cum 4530.00 0
33 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MT 54560.00 0.96 52238
34 7.13 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 0.00 53495.00 0.00 0
35 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 No 239.00 0.00 0
44 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 Cum 1291.00 0.00 0
36 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 No. 1511.00 0.00 0
37 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications m 308.00 0.00 0
38 7.31 Providing and laying cement concrete wearing courese M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 Rmt 9091.00 0.00 0
48 7.41 (iii) Filler Joint III) Providing and fixing 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications Cum 141.00 0.00 0
49 7.36 (i) P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) Nominal mix (1:2.5:5) Cum 3498.00 0.00 0
50 7.37 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 Cum 10416.00 0.00 0
39 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material Cum 732.00 369.54 270504
40 7.8 Filling in Foundation Trenches as per drawing and technical specification Clause 1108 & 305.3.9 Sand Filling Cum 911.00 0.00 0
41 7.2(I) Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 Cum 1440.00 0.00 0
52 10.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301 Cum 1440.00 0.00 0
53 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder Cum 1440.00 0.00 0
54 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 Cum 1660.00 0.00 0
55 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 Rm 2054.00 0.00 0
42 9.2(A) Cautionary, mandatory, informatory direction and place identification sign boards. (A)Semi-Reflective Traffic signs upto 0.90 sqm Direction and place indentification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 sqm 4729.00 0.00 0
8.4 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Retro- reflectrorized Traffic signs (Providing and fixing of retroreflectrorized cautionary, mandatory and informatory sign as perIRC:67-2012 made of Micro prismatic grade type reflective sheetingvide clause 801.3, fixed over aluminum sheeting, 1.5 mm thicksupported on a mild steel frame of size 40 x 40 x 5 mm and mild steelangle iron post 75 mm x75 mm x 6mm firmly fixed to the ground bymeans of properly designed foundation with M15 grade cementconcrete 45 cm x 45cm x 60cm, 60 cm below ground level as perapproved drawing) ( i ) 90 cm equilateral triangle each 5170.00 0.00 0
9.21(B) Retro-Reflective Traffic signs Direction and place identification signs up to 0.9 Sqm. Providing and erecting direction and place identification of Retro reflectivesheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mmthick M.S. Sheet duly stoveenameled paint white colour in front and greycolour on back with reflective border of 70 mm width and required message,letters, figures with reflective tape of engineering grade as per MORI)specifications ofrequired shade and colour. Supported and welded on twonos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height dutystrengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed tothe ground by means of properly designed foundations with M-15 gradecement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 sqm 6244.00 14.58 91038
43 9.16 Providing and fixing LOGO BOARD Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. sqm 6626.00 1.00 6626
44 9.2(B) Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 sqm 4667.00 11.52 53764
45 9.8 (I) Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (i) 5th Kilometre Stone (precast) Each 3700.00 0.00 0
46 9.8 (II) Ordinary Kilometer Stone (Precast) Each 2194.00 4.00 8776
47 9.8 (III) 200 m stone (precast) Each 463.00 12.00 5556
48 9.17 Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. Each 472.00 180.00 84960
49 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project (B) Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on bothsides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 Each 13749.00 0.00 0
9.21(A) A typical design of PMGSY informatory Sign Board is shown in fig. 12ffi.1The specification and installation details ofthe typical sign board are givenbelow: (i) The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7The top most plate will be in diamond shape of 600 mn x 600 mm sizr, rivetedover welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back onedges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s.angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The mainIower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S.angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets overangle iron frame will be done neatly to have plain surface on one side. Theangle iron frames of the lower most plate and the middle plate will be weldedto two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mmapart centre to centre. The top of the middle plate wilt be flushed with the topof 75 nm dia medium steel tube posts and these posts will be embedded incement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm belowground level. The height of bottom of the lower nost plate will be 1200 mmfrom normal ground level and the bottom of middle plate will be 100 mmabove the top level of the lower most plate. The diamond shaped platemounted over angle iron frame will be connected to middle plate by squaremedium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of100 mm between the diamond shaped plate and middle plate and this squaresection will be welded to the bottom point of the diamond shaped plate.(ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo ontop plates shall be as per clause 1701.4.6 messages/Borders. All the section offrame and posts will be painted with primer and two coats of Epoxy paint Thesteel tube below ground level will be painted with three coats of Epoxy paintThe design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height. No. 2.00 17699.00 35398
50 9.15 (A) 10.15(A) Providing and fixing 'Citizen Information Board' of PMGSY Project(A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back Each 14015.00 2.00 28030
51 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) Sq.m 604.00 426.00 257304
8.23 SOR for Road Works, C.G,. P.W.D. w.e.f 01-01-2015 Providing & Fixing tree studs in Square/ Round shape of 4” side/diameter made of 2 mm aluminum substrate (Confirming to IS:736-Material Designation 24345 or 1900) end reflective surface of High Intensity grade as specified in section 800.1.3 of MORT&H duly treated with HLVA and fixing the same with four Nos. high strength nails confirming to 1S:1367 on trees at site each each 67.00 0.00 0
52 9.19(A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. A For 7.50 M Formation Width each 22547.00 1.00 22547
53 DPR Preperation km 20000.00 2.13 42600
2.14 Removal of Telephone/Electric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202. each 100000.00 0.00 0
Road Inaugration Stone Each 10000.00 1.00 10000
Total Construction Cost 13366864 13663614 -296750
66 Maintenance of Road for Ist Year after Construction per km 30000.00 2.13 63900
67 Maintenance of Road for IInd Year after Construction per km 40000.00 2.13 85200
68 Maintenance of Road for IIIrd Year after Construction per km 70000.00 2.13 149100
69 Maintenance of Road for IVth Year after Construction per km 110000.00 2.13 234300
70 Maintenance of Road for Vth Year after Construction per km 150000.00 2.13 319500
Total maintenance cost 852000
GRAND TOTAL 14218864
Add GST 18% 2559396
Total cost incluiding 18 % GST 16778260
Sub engineer Asst. Engineer EXECUTIVE ENGINEER
GOVT OF CHHATTISGARH
DEPARTMENT OF PANCHAYAT AND RURAL DEVELOPMENT
CHHATTISGARH RURAL ROAD DEVELOPMENT AGENCY
PMGSY - IV Scheme
PRADHAN MANTRI GRAM SADAK YOJANA
NAME OF ROAD : Rajpur Sidhbaba road To Bijaghora Pahuch marg
BLOCK : Thakatpur
DISTRICT : Bilaspur
LENGTH (in km) : 2.13 km Flexible 2.130 Rigid 0.000
NO OF CD : 5 Nos. LSB
Description COST (in Lakh Rs)
Cost Cost per km GST cost Cost with GST Per km cost with GST
FLEXIBLE PAVEMENT 86.42 40.57 15.56 101.98 47.88
RIGID PAVEMENT : 0.00 #DIV/0! 0.00 0.00 #DIV/0!
OTHERS Protection,drain,road furniture etc) 33.34 15.65 6.00 39.34 18.47
OTHER STATE WORKS 0.53 0.25 0.09 0.62 0.29 120.29
TOTAL COST WITH MAINT : 145.16 68.15 26.13 171.28 80.42
RENEWAL COST WITH 5 yr MAINT : 51.12 24.00 9.20 60.32 28.32
TOTAL COST WITH MAINT : 196.28 92.15 35.33 231.61 108.74
0 0 ANAND VIBHOR
BILASPUR (C.G.)
Proforma C (2021)- Part-1
PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY-III)
CHECKLIST FOR PIU & STA
( For Indvidual Road Works )
Final Proposal Details (To be filled by PIU & Verified by STA)
1. Location State: Chhattisgarh District : Bilaspur Block: Thakatpur
2. Package Number
3. Name of the Road (as per OMMAS) Rajpur Sidhbaba road To Bijaghora Pahuch marg
4. Planning (Check from CUCPL and GeoSadak)
a Is the road a part of DRRP and Approved CUCPL (Mark ✔ as appropriate) Yes No
b Is the road proposal uploaded on GeoSadak (Mark ✔ as appropriate) Yes No
Screenshot of the proposed alignment from the GeoSadak to be attached with the DPR
c Indicate coordinates of Starting and Ending point of the Proposed Road Starting Point Ending Point
Longitude 81.950629 81.945712
d Details regarding the components of the candidate road?
Component Roads DRRP Road Number Road Name Trace Map Rank PCI DRRP Length considered (km)
Component Road 1
Component Road 2
Component Road 3 `
e Through Route/ MRL Number T - OR MRL-
f Name of benefited habitations (benefited habitation report generated from OMMAS to be attached with the DPR)
Sl. No. Name of Habitation Habitation served with Population
SC Population % of SC Population with respect to total Population ST Population % of ST Population with respect to total Population Other than ST/SC population Total population
g Names of facilities along the Candidate road (For PMGSY-IV facilities, report generated from OMMAS to be attached with the DPR)
Sl. No. Name of Facilities Sl. No. Name of Facilities Sl. No. Name of Facilities Sl. No. Name of Facilities
h Utility value
j Whether the proposed road leads to (Mark ✔ as appropriate) MDR SH NH
k Average PCI of the road to which proposed TR or MRL will be connected
l Average PCI value of proposed road
m If PCI of MDR / SH / NH is 3 or below , whether the State is undertaking for upgrading it from State fund available (Mark ✔ as appropriate) Yes No
5. Eligible CUCPL length (km) -
6. Total Proposed Length (km) - 2.13 In Built up area (km) - #VALUE! In Open Area (km) - #VALUE!
7. Is there any variation between eligible CUCPL length and Proposed length (Mark ✔ as appropriate) Yes No
If Yes, Reason for variation to be mentioned
8. Existing status of proposed road (PMGSY/ Non-PMGSY Portion)
Chainage Length (km) Year of Construction* Corresponding existing PCU/day Corresponding Design Traffic Category
Non-PMGSY Portion
Note : *Actual date of completion of previous construction/ upgradation.
9. Existing Surface Status of proposed road
Existing Surface Status
Track/ Earthen Gravel/ Moorum WBM Brick Soling Bituminous Wearing Course CC
Chainage Length (km) Chainage Length (km) Chainage Length (km) Chainage Length (km) Chainage Length (km) Chainage Length (km)
Total 2.130 Total Total Total Total Total 0.000
10. Type of proposal
Chainage Length (km)
Riding Quality Improvement (RQI) to
Upgradation without widening to
Upgradation with widening to
New Construction (From existing non-BT portion) 0.00 to 2.13 2.13
11. Type of Pavement Proposed
Chainage Length (km)
Flexible 0.000 to 2.130 2.130
12. a. Whether the Proposed Road has the desired Road Land Width (RLW ) to accommodate required carriageway/ roadway (Mark ✔ as appropriate) Yes No
If No, what measure has been taken in DPR chainage wise Chainage Measures taken
b Indicate the widths of the following for the proposed road Existing Widths (m) Proposed Widths (m)
In the Built Up Area In the Open Area In the Built Up Area In the Open Area
i) Carriageway 3.0 3.4 3.75 3.75
ii) Roadway 5.0 6.0 5.55 7.5
iii) Road Land Width 7.0 11.0 6.85 12.0
13. INDEX MAP (not to scale ) : To be attached saperately
F- Rajpur H2/F2 H3/F3
F-Facilities name
14. Traffic Data
Month & Year of Traffic Volume Count = 15/03/2026 to 18/03/2026
Days Motorised Traffic Non Motorised Traffic
Cars, Jeep, Vans, Three Wheelers Motorised two Wheelers Light Commercial Vehicle Trucks Agricultural Tractors Trallers Buses Cycles Cycle Rickshawa Animal Drawn Vechicle
Loaded Unloaded Over loaded Loaded Unloaded Over loaded Loaded Unloaded Over loaded SWC Num. Tyred
3 days traffic count is required in case design is done using IRC SP:72-2015 and 7 day count required in case design is done with IRC 37:2018
a Traffic Details in case design is done as per SP IRC 72:2015
ADT in the year of Traffic Count = 422
Growth rate adopted (%) = 6% Base Year Traffic AADT (T) = 375
Design Life (Years) = 10
Number of Harvesting Seasons = 1
No. of Days in Each Harvesting Season (t) = 75 Cumulative ESAL = 236560
Value of (n) assumed = 1 Traffic Category = T5
b Traffic Details in case design is done as per IRC 37-2018
A= Intitial traffic in the year of completion of construction in terms of the number of commericial vehicles per day 147.67
D= Lane distribution factor 1
F= Vehicle damage factor
n= Design life in years 10
r= growth rate adopted % 6%
N= The cumulative number of standard axles to be catered for the design in terms of msa 0.2366
Projected Commercial Vehicle Per Day
c Projected Passenger Car Unit (PCU/day) 752.83
15. Design Subgrade CBR ( for Different Sections atleast one Test/km ) =
Chainage-wise 400 1500 2100 0 0 0
PLASTIC Limit (PL) 19.55 17.82 19.50 0.00 0.00
Plasticity Index (PI) 15.84 16.40 15.39 0.00 0.00
16. Relavant Method & Codes used for Pavement Design
a Method Used for Designing of Pavement ((Mark ✔ as appropriate) Conventional New Technology
b If New Technology is used, indicate the name (Please indicate New Technology used in Subgrade, Sub-Base, Base, Surface Course layer separately) Surface Course Waste plastic
Surface Course 0
c Code used for designing Flexible pavement (Mark ✔ as appropriate) IRC:SP:72-2015 IRC:37-2018
d Code used for designing Rigid Pavement (Mark ✔ as appropriate) IRC:SP:62-2014 IRC:58-2011
e Any other Codes used for New Technology/ Other, please indicate
17. Existing and Proposed Pavement Cross Section drawing & details both for flexible and rigid (Separately Chainage-wise)
i) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From 0 To 1000
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
ii) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From 1000 To 2000
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
iii) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From 2000 To 3000
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
iv) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From 3000 To 4000
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
v) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From 4000 To 5000
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
Separate cross section drawings along with tabular details of the pavement layers should be repeated (chainage wise) for each type of cross section encountered.
18. Sources and the Lead distances of Materials are as under (Lead to be measured from the mid-point of the proposed road)
Sl. No. Material Source Lead Distance (km) Sl. No. Material Source Lead Distance (km)
1 Earth for embankment construction Local 1 6 M-Sand Arpa river 25
2 Murrum/ Carted soil (Subgrade) Local 2 7 Cement Korba 42
3 Murrum/ Gravel for shoulder (Subgrade) Local 2 8 Emulsion Vishakapatnam 700
4 Aggregate Daija 10 9 Bitumen Vishakapatnam 700
5 Sand Arpa river 25 10 Steel Korba 42
19. Cost Details of proposal (Please fill all the entries or write "NA" wherever applicable )
a Pavement Components
Description of layer Quantity Unit Rate in Rs. Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Flexible pavement
Preparatory & Earthwork
i Clearing & scarifying Sqm 50340 9061.2 0.594 0.279 2.13
ii Earth Work - in Excavation/ Cutting 644.96 Cum 65.00 41922 7546 0.495 0.232 2.13
iii Earthwork- in Filling (Embankment-)utilised 282.68 Cum 55.00 15548 2799 0.183 0.086 2.13
in Filling (Embankment)- Borrow 11648.50 Cum 176.00 2050135 369024 24.192 11.358 2.13
iv Subgrade (if provided seperately) 2.13
a. Subgrade (Using local Soil) NA Cum 0 2.13
b. Subgrade (Carted Soil) NA Cum 2.13
c. Treated Subgrade (Stabilized Subgrade) NA Cum 2.13
v Shoulders 2.13
a. Earthen Shoulder CBR more than 7 1669.92 Cum 180.00 300586 54105 3.547 1.665 2.13
b. Gravel Shoulder NA Cum 2.13
c. GSB Quality Shoulder NA Cum 2.13
Sub-Base Course 2.13
vii Soil + Aggregate Mix NA Cum 2.13
viii Stabilised sub base NA Cum 2.13
Base Course 2.13
ix WBM Gr -II NA Cum 2.13
x WBM Gr -III NA Cum 2.13
xii Stabilised base NA Cum 2.13
Bituminous Course 2.13
xv Binder Course (BM/ DBM ) BM 0.00 Cum 7593.00 0 0 0.000 0.000 2.13
xvi Surface Course (OGPC/ SDBC/ BC) OGPC 9859.34 Sqm/ Cum 128.00 1261995 227159 14.892 6.991 2.13
xviii Surface Course with Surface Dressing 2.13
a. Single Coat Surface Dressing NA Sqm 2.13
b. Double Coat Surface Dressing (with or without Pre-Coating indicate) Indicate Type NA Sqm 2.13
Total cost of Flexible pavement (a) 8398884 1511799 99.107 46.529 2.13
Cement Concrete Road
PCC M15 ( for widening & shoulder ) 0.00 Cum 3731.00 0 0 0.000 #DIV/0! 0
xxi Concrete for Pavement (M30) on existing CC Pavement NA Cum 0 0.000 #DIV/0! 0
xxii Concrete for Pavement (M30) for newly proposed CC Pavement portion 0.00 Cum 5097.00 0 0 0.000 #DIV/0! 0
xxiii ICBP NA Sqm 0 0.000 #DIV/0! 0
xxiv Cell Filled Concrete Pavement 0.00 Cum 5836.00 0 0 0.000 #DIV/0! 0
xxv Panelled Cement Concrete Pavement 0.00 Cum 5680.00 0 0 0.000 #DIV/0! 0
xxvi Hard shoulder 0.00 Cum 358.00 0 0 0.000 #DIV/0! 0
Total cost of Concrete Pavement (b) 0 0 0.000 #DIV/0! 0
Total cost of Pavement (a + b) 8398884 1511799 99.107 46.529 2.13
Cost deduction due to higher specification in pavement design**
Final Pavement Cost after deduction 8398884 1511799 99.107 46.529
Note : ** The details of Higher Specification considered in pavement design over & above admissible guidelines need to be provided under 19 (g) and detailed calculation of the same to be attached with the DPR separately.
b Cross Drainage (CD) Works
i Existing CD (requiring repair)
Type of CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
ii Existing CD (requiring replacement)
Type of Existing CD/FC Type of Proposed CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
Field crossing 1x600 mm 1x1000 mm dia HPC 66 1.00
Field crossing 1x600 mm 1x1000 mm dia HPC 786 1.00
Field crossing 1x600 mm 1x1000 mm dia HPC 1020 1.00
Field crossing 1x600 mm 1x1000 mm dia HPC 1100 1.00
Field crossing 1x600 mm 1x1000 mm dia HPC 1245 1.00
HPC 1x600 mm Canal crossing 1583 1.00
Field crossing 3Rx1000 mm 1x 3.00 m slab culvert 0 1.00
iii New proposed CD
Type of CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
1x1.50 m span Slab culvert 0 0 0.00 0.00
1x2.00 m span Slab culvert 0 0 0.00 0.00
1x3.00 m span Slab culvert 0 0 0.00 0.00
1x5.00 m span Slab culvert 0 0 0.00 0.00
1x6.00 m span Slab culvert 0 0 0.00 0.00
2x5.0 m span Slab culvert 0 0 0.00 0.00
3x5.0 m span Slab culvert 0 0 0.00 0.00
2x6.00 m span Slab culvert 0 0 0.00 0.00
Note: Similar type of CDs may be grouped together for each category
Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total Cost of CD works 1338358.94 240904.61 15.79 7.414
c Protection works Chainage (Expand as applicable)
From To Length( m) Amount in Lakhs Average cost/ m in Lakhs
Retaining wall i Both side 1580 1650 140 1872049.2 13371.78
iii Both side 0 0 0
vi Both side 0 0 0
Toe wall i Both side 1245 1315 140 393086.4 2807.76
iii Both side 0 0 0
Pitching / turfing for slopes i
Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total cost of Protection works 2265135.6 407724.408 26.729 12.549
d Side Drains (if Provided) Chainage (Expand as applicable)
From To Length( m) Amount in Lakhs Average cost / m in Lakhs
Pucca Drain (U/ V/ Trapezoidal/ etc) i RHS 520 790 270 474467 1078.33
vi Both Side 0 0 0
Earthen/ Kacha Drain i RHS 0 0 0 25200 63.00
ii Both Side 0 0 0
iv Both Side 0 0 0
Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total cost of Side Drains works 499667 89940 5.90 2.77
e Road Logo, other Road Furniture including Road safety signs (Expand as applicable)
Sl. No. Type of Road Furniture Chainage Number Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
i Direction and place identification signs up to 0.9 Sqm. 18 91038 16387 1.074 0.504 2.13
iii Semi-Reflective Traffic signsmore than 0.90 sqm sign board 8 53764 9677 0.634 0.298 2.13
iv PMGSY informatory Sign Board 2 35398 6372 0.418 0.196 2.13
v Citizen Information Board' of PMGSY Project 2 28030 5045 0.331 0.155 2.13
vi 5thKm /Oridanary KM/200 m / Guard Stone 99292 17873 1.172 0.550 2.13
vii Road marking 257304 46315 3.036 1.425 2.13
viii Speed Braker 1 22547 4058 0.266 0.125 2.13
Total cost of Road Furniture 593998 106920 7.009 3.291 2.13
f Any other Provisions
Sl. No. Items (Please Specify) Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
ii Dismentaling concrete & Removing pipe 2460 443 0.029 0.014 2.13
iii Compacting original ground 0 0 0.000 0.000 2.13
iv Bedding for Causeway / pipes Type B (First Class) Bedding 8199 1476 0.097 0.045 2.13
v Providing and laying reinforced cement concrete pipe NP3 (600 mm/450mm/300mm) 175680 31622 2.073 0.973 2.13
Total cost of Other Provisions 218221 39280 2.575 1.209 2.13
g Other Items under Higher Specifications (Additional Cost to be borne by the State, apart from those under 19(a) to 19(f))
Sl. No. Items Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
i Land Acquisition
ii Shifting of Utilities 0 0 0.000 0.000 2.13
iii Plantation 2.13
iv Any other (Please specify) 2.13
a Inauguration Stone 10000 1800 0.118 0.055 2.13
b Preperation of DPR with survey 42600 7668 0.503 0.236 2.13
Total cost of Higher Specification 52600 9468 0.621 0.291 2.13
h Total Construction Cost - Sum of 19 (a) to 19 (g) Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total Construction Cost of the Project 13366864 2406036 157.729 74.051 296750 2.13
20. Five Year Routine Maintenance
To be estimated as per provision of Operation Manual Year Cost (I/C GST) in Lakhs % of Total construction cost Cost /km in Lakhs
Renewal coat after 5 years 50.268 31.87 14.962 157.729 2.13
Total Maintenance with renewal Cost 60.3216 38.24 17.955 157.729 2.13
Maintenance after 6th years renewal coat I 0.75402 0.48 0.224 157.729 2.13
Total Maintenance Cost 10.0536 6.37 2.992 157.729 2.13
Grand Total of maintenance 70.3752 44.62 20.947 157.729 2.13
21.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase (Mark ✔ as appropriate) Vetted at NRIDA Year of SoR
Yes No CG SOR Feb 2018
22. Final Project Cost Abstract :
Cost sharing pattern between MoRD and State (Mark ✔ as appropriate) General Area (60:40) Special Area (90:10)
Item as per Entry 19 above Total Cost in Lakhs GST in Lakhs Total Cost (I/C GST) in Lakhs MoRD Share in Lakhs State Share in Lakhs Average Cost/ km (I/C GST) in Lakhs
19(g) Higher Specifications 0.526 0.095 0.621 Not Applicable 0.621 0.291 2.13
Total Project Construction Cost (Excluding Maintenance Cost) 133.669 24.060 157.729 94.265 63.464 74.051 2.13
Note : In calculating MoRD and State Share for items 19 (a) to 19 (f) above, a proper calculation sheet should be attached if specifications/ provisions higher than those prescribed in the guidelines have been taken in the estimate e.g. extra width of road or crust thickness or provisions of bituminous layer over & above that allowed in the guidelines. In such cases, the extra cost should be fully booked under State Share. All such extra amount, over and above the sharing pattern between Centre and the State, so booked in the state share for items 19(a) to 19(f) above, plus the amount under 19(g) will become the total amount of higher specification.
Certified that the source of materials & lead distance is shortest, and other information provided above is correct
Prepared By (Signature) Checked By at PIU/ Circle office (Signature) Technical Scrutiny at STA by: (Signature)
Designation Designation Designation
Counter Signatures of Co-ordinator STA :
Proforma C (2021)- Part-2
PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY-III)
CHECKLIST FOR PIU (To be filled handwritten by PIU Head)
Sl No Items To be filled by PIU (Yes/No) Reference wherever applicable (Page no. in the DPR)
1 Whether the transect walk photographs, Minutes of Transect walk, Grama Sabha approval attached with the DPR ? Yes
2 Whether the benefited habitations and PMGSY-III facility report generated from OMMAS attached with the DPR ?
3 Whether the proposal uploaded on GeoSadak and screenshot of the proposed alignment is attached with the DPR ?
4 Whether clear coloured & geotagged photographs at 100m interval depicting road pavement condition are attached ? Yes
5 Is the PCI value (as in CUCPL) for the proposed road is in corroboration with photographs attached? (Approved CUCPL to be attached in DPR)
6 Is the road eligible for upgradation based on PCI value ?
7 Is any portion/ road proposed under Riding Quality Improvement (RQI) ?
8 Is any portion of the road is within design life period of 10 years or PCI more than 3?
a If yes, whether the additional cost for such portion of length uploaded under Higher Specification Cost on OMMAS?
b If not, whether detailed reasons indicated in the DPR?
9 Whether required roadway land width of 9 m and 7.50 m for 5.50 m and 3.75 m carriageway width respectively available througout or as per codal provision depending upon terrain ?
a If no, whether chainage wise details of available land width is attached with the DPR?
b If no, whether land acquisition proposed for obtaining required land width?
10 Whether the road has Geometrics as per Rural Roads Manual (RRM) / Latest Circulars of NRIDA?
11 Whether the radius of the curves provided are adequate as per codal provisions for design speed on rural roads? Yes
If not, whether precautions have been taken and included in the DPR?
12 Is Road Plan, L & X section and Junction design drawings attached ? Yes
13 Whether soil test report showing (a) Gradation (b) Plasticity limits (LL, PL & PI) (c) Standard Proctor Compaction (MDD & OMC) (d) CBR tests on existing subgrade soil is attached ? Yes
14 Whether stabilisation of subgrade proposed in case subgrade CBR is less than 5% for pavement in widening portion or for new pavement construction?
15 If stabilisation of subgrade is proposed, whether the test report of stabilised subgrade for determining 'Optimum stabiliser content' and 'subgrade strength achieved after stabilisation' is attached ?
16 Whether any carted soil is proposed for improvement of sub grade/ shoulder?
If yes, whether test results of carted soil is attached with the DPR?
17 Whether the test results of GSB material is attached with the DPR?
18 Whether 3 days/ 7 days traffic survey details attached with the DPR? Yes
19 Whether 3rd party Traffic verification using ATCC is carried out for more than 1 MSA traffic as per guidelines/ as per latest circular and reports attached with the DPR?
20 Whether Axle load Surveys carried out for more than 1 MSA traffic and reports attached with the DPR?
21 Is the carriageway width (single lane or intermediate lane) of the proposed road is as per PCU/day consideration? (Refer to IRC 64:1990)
22 Whether existing road pavement has been divided into different sections (chainage starting from and chainage up to) depending upon extent of distress for strengthening/ rehabilitation of the proposed road section-wise?
If not, whether detailed reasons indicated in the DPR ?
23 Is the Pavement design done as per latest version of IRC Code? IRC SP:72-2015 and IRC SP:62-2014 or IRC 37-2018 and IRC 58-2011 IRC SP:72-2015 and IRC SP:62-2014
24 Whether earth obtained from cutting section has been propsed for using in filling section? (Cutting from High embankment, side drains, protection work, CD work, etc.) Yes
If not, whether detailed reasons indicated in the DPR ?
25 Whether hard rock or ordinary rock classification and quantity of hard rock or ordinary rock cutting proposed are justified based on previous experiences and rock outcrops seen in that area? No
If yes, whether due credit given to hard rock ?
26 Whether the km wise existing pavement crust details (pavement layer details and their thickness, year of construction) are properly filled in Part-1 of Proforma C ? Yes
27 Whether the proper weightage is given for the existing crust thickness while designing overlay thickness?
28 Whether overlay thickness is as per Clause 2.2.3 of IRC SP: 72-2015 based on traffic category ?
29 Whether the Binder Course/ Surfacing Course has been proposed as per IRC SP:72 - 2015 or IRC 37-2018 ? Yes
If not, whether detailed reasons indicated in the DPR ?
30 Is Location of CDs, drains and Protections marked in L and X section drawings? Yes
31 Whether length of existing/ proposed CDs/ Bridges deducted from pavement quantity calculation? Yes
32 Whether the clear coloured photographs at the location of existing and Proposed CD structures, and protection structures are attached ? Yes
33 Whether hydraulic calculation for each CD structures attached? Yes
34 Whether latest rainfall data used for the design ? Yes
35 Is the provision of CD structures and design is as per site requirement and as per relevant IRC codes? Yes
36 In case of CD structures which have been proposed for replacement, whether you have ensured that such CDs are beyond repair and hence they need to be replaced? Yes
37 Is the provision of Protection work and design is as per site requirement and as per relevant IRC codes? Yes
38 Whether drainage plan attached with the DPR?
39 Whether Road Safety Audit (RSA) report attached and uploaded on OMMAS ?
40 Is the provision of road safety furniture proposed as per RSA and site requirement? Yes
41 Is the road safety furniture items (Retroreflective road signs, thermoplastic reflective paint for road markings, Advance warning signs, Traffic calming measures, Crash barriers, hazard markers and parapets on bridges, etc.) proposed in DPR marked in the road plan Yes
42 Whether any New technology has been proposed ?
a If yes, whether the site jointly inspected by PIU, DPR consultant (technology provider) and STA regarding selection of technology ? If yes, date on which site inspection was made. Date:
b If proposed, whether the requisite test results and other data is attached with the DPR ?
c Whether the comparative statement using conventional method and new technology is attached with the DPR ?
43 Whether the details of Higher Specification considered over & above admissible guidelines added under 19 (g) of Proforma C (Part-1) and detailed calculation of the same attached with the DPR ?
44 Whether the cost considered under 19 (g) of Proforma C (Part-1) uploaded under "Higher Specification" cost on OMMAS?
45 Whether Format F-9A and F-9B duly signed by Head of PIU are attached with the DPR ?
46 Whether the head of PIU inspected the site? If yes, date on which site inspection was made Date:
47 If yes, are you satisfied with the provisions made in the DPR as per site requirement and duly following guidelines/ IRC Codes ?
Total cost of construction after scrutiny by PIU/Circle-Office and before scrutiny at STA (I/C of GST) in Lakhs 157.729
Total Average cost/ km ( in Lakhs) 74.051
a Average Pavement cost/ km ( in Lakhs) 46.529
b Average CD Structures cost/ km ( in Lakhs) 7.414
c Average Other cost/ km ( in Lakhs) 20.108
Describe how the proposal meets PMGSY-III objectives (Maximum 100 words)
Signature of PIU Head
Note: Part-2 of Proforma C to be filled personally by concerned PIU Head
Proforma C (2021)- Part-3
PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY-III)
CHECKLIST FOR STA (To be filled handwritten by STA)
Name of the STA:
Sl No Items To be filled by STA (Yes/No) Reference wherever applicable (Page no. in the DPR)
1 Is the Part -I and Part-2 of Proforma C completely filled with signature? (Scrutiny by STA should only be done after it is completely filled and duly signed by the PIU officials)
If "Yes"- are you satisfied with overall entries made by PIU?
2 Whether clear coloured & geotagged photographs at 100m interval depicting road pavement condition are attached ?
3 Have you satisfied yourself that the proposed road is part of Candidate roads and approved CUCPL ? (Approved CUCPL to be attached in DPR)
4 Whether the benefited habitations and PMGSY-III facility report generated from OMMAS attached with the DPR ?
5 Whether the screenshot of the proposed alignment is attached with the DPR and have you verified the alignment from the GeoSadak ?
If yes, are you satisfied with the proposed alignment as Through Route/ Major Rural Link providing access to facilities viz. Education/ Hospitals/ Markets etc. to rural population as per the objectives of PMGSY-III?
6 Is the road eligible for upgradation based on PCI value ?
7 Is the PCI value (as in CUCPL) for the proposed road is in corroboration with photographs attached?
8 Is any portion/ road proposed under Riding Quality Improvement (RQI) ?
If yes, whether only wearing coat (OGPC and Seal Coat, SDBC, Surface dressing or BC) with some patch filling work proposed?
9 Have you verified the Format F-9A and F-9B duly signed by Head of PIU are attached with the DPR ?
10 Is any discrepancies/ abnormalities found in the soil test reports attached with the DPR? (if yes, STA can re-verify again from the STA laboratory). Are all the four requisite test results on subgrade soil (Gradation, plasticity limits, compaction and CBR) reported in DPR?
11 Whether stabilisation of subgrade proposed in case subgrade CBR is less than 5% for pavement widening portion or for new pavement construction?
12 Are you satisfied with the type of stabilization proposed and its test results attached with the DPR ?
13 If stabilization is not proposed for the subgrade CBR less than 5, are you satisfied with the reasons provided by the PIU ?
14 Whether 3 days/ 7 days traffic survey details attached with the DPR ?
15 Have you analysed the ATCC report and Axle load test data and yourself satisfied with the design traffic recommended for the projected traffic more than 1 MSA as per guidelines/ as per latest circular?
16 Whether existing road pavement has been divided into different sections (chainage starting from and chainage up to) depending upon extent of distress for strengthening/ rehabilitation of the proposed road section-wise?
If not, are you satisfied detailed reasons indicated in the DPR?
17 Whether the km wise existing crust details (layer thickness) properly entered in Part-1 of Proforma C?
18 Whether the proper weightage is given for the existing crust thickness during overlay design?
19 Whether overlay thickness is as per Clause 2.2.3 of IRC SP: 72-2015 based on traffic category?
20 If bituminous macadam usage is proposed, whether the design traffic is of T9 category as per IRC SP:72 - 2015.
21 Is hard shoulder proposed is as per IRC SP:72:2015 ?
22 Whether the road has Geometrics as per Rural Roads Manual (RRM) / Latest Circulars of NRIDA?
23 Whether the radius of the curves provided are adequate for design speed on rural roads?
If not, are you satisfied with the precautions taken and included in the DPR?
24 Is L and X section drawings, Junction design drawings attached ?
25 Is location of CDs, drains and Protections marked in L and X section drawings ?
26 Are you satisfied with the location and type of CDs proposed as per photographs and Hydraulic calculations ?
27 Are you satisfied with the location and type of Protection work proposed as per photographs and site requirement?
28 Whether Road Safety Audit Report attached and uploaded on OMMAS ?
29 Whether the road safety provisions in the DPR are as per RSA report?
30 Have you verified and satisfied yourself regarding the provisions in the DPR such as junction improvements, requirement of major CDs structures, pucca drains in habitation area, etc. from the satellite imagery of the proposal in GeoSadak?
31 Whether any New technology has been proposed ?
a If yes, whether the site jointly inspected by PIU, DPR consultant (technology provider) and STA regarding selection of new technology ?
b If proposed, whether the requisite test results and other data is attached with the DPR ?
c Whether the requisite pavement design based on Mix design/ test results attached in the DPR?
d Whether the comparative statement using conventional method and new technology is attached with the DPR ?
32 Whether the details of Higher Specification considered over & above admissible guidelines added under 19 (g) of Proforma C (Part-1) and detailed calculation of the same attached with the DPR ?
33 Whether the cost considered under 19 (g) of Proforma C (Part-1) uploaded under "Higher Specification" cost on OMMAS?
34 Are you satisfied with the provisions made in the DPR as per site reqirements and duly following guidelines/ IRC Codes ?
35 Is the Part-1 of Proforma C- "Final Proposal Details" properly/ completely filled with signatures after scrutiny at STA?
Total cost of construction after scrutiny by STA (Should match with Total Cost at Part-1 (I/C of GST)) in Lakhs
Total Average cost/ km ( in Lakhs)
a Average Pavement cost/ km ( in Lakhs)
b Average CD Structures cost/ km ( in Lakhs)
c Average Other cost/ km ( in Lakhs)
Specific Remarks, if any, by STA
Signature of STA Member Signature of STA Coordinator
Designation Designation
Note: Part-3 of Proforma C to be filled personally by concerned STA member responsible for scrutiny of DPR
Is the Part-1and Part-II of Proforma C- "Final Proposal Details" corrected based on the observations of STA?
Statement showng the details of Component wise cost of roads proposed under PM-JANMAN(PVTG) Format- I
CGRRDA dated 29.12.23 (Length in Km and Amount in Lakhs)
Sl. No. District Block Name of Road Pkg. No. Existing Surface Type Proposed Surface Type Proposed Pavement Details (Rs. In Lakhs) CDs (Rs. In Lakhs) Protection works (Road Part)(Rs. In Lakhs) Other Works Cost Total Project Cost (Rs in Lakhs) (24+27+30+34) Average Cost (Rs in Lakhs) / km (36/12) Carriage Width (in m) Roadway Width Traffic Category ESAL (MSA) 5% Accredited New Technology 10% Non Accredited New Technology Name of Benifit PVTG Habitations
Earthen Gravel CC BT CC BT Total (10+11) Earthwork including Shoulders GSB WBM G-II WBM G-III WMM Prime Coat Tack Coat BM/DBM OGPC /SDBC/BC/MSS Seal Coat CC Total Cost Average Cost/ km (24/12) No. Total Cost Avg Cost/No (27/26) Avg Cost/km (28/12) Total Cost Avg cost / km (31/12) Side Drain Road Furniture including Road safety signs & other Total Cost Avg cost / km (34/12) Existing Proposed Name of Technology Length of Technology Name of Technology Length of Technology
1 Bilaspur Thakatpur Rajpur Sidhbaba road To Bijaghora Pahuch marg - 0 0 0 0 2.13 0.00 2.13 27.04 12.08 0.00 0.00 21.98 4.24 1.28 0.00 12.62 4.24 0.00 83.49 39.20 5.00 16.35 3.27 1.54 22.65 10.63 5.00 9.15 14.15 6.64 136.64 64.15 0.00 3.75 7.50 T5 0.237 Waste plastic , Panel concrete & cell filled
Total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Detailed Estimate for Maintenance of Road (For 5 Years)
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg District :- Bilaspur
Length of Road:- 2.13 Km BLOCK :- Thakatpur
Sr.No. Description Length Unit Rate Amount
1 Maintenance of Road for Ist Year after Construction 2.130 Km 30000.00 63900 0.3
2 Maintenance of Road for IInd Year after Construction 2.130 Km 40000.00 85200 0.4
3 Maintenance of Road for IIIrd Year after Construction 2.130 Km 70000.00 149100 0.7
4 Maintenance of Road for IVth Year after Construction 2.130 Km 110000.00 234300 1.1
5 Maintenance of Road for Vth Year after Construction 2.130 Km 150000.00 319500 1.5
Total Rs. 852000
Renewal cost Rs 2000000.00 per km 2.130 2000000 4260000
Five year maintenance after renewal
Maintenance of Road for Ist Year after Renewal 2.130 Km 30000.00 63900
Maintenance of Road for IInd Year after Renewal 2.130 Km 40000.00 85200
Maintenance of Road for IIIrd Year after Renewal 2.130 Km 70000.00 149100
Maintenance of Road for IVth Year after Renewal 2.130 Km 110000.00 234300
Maintenance of Road for Vth Year after Renewal 2.130 Km 150000.00 319500
Total Rs. 852000
Consultant Sub engineer Assistant Engineer 0
PIU PMGSY 0 0 0
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR 1x1000MM DIA. HUME PIPE CULVERT ( ONE ROW )
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Format F-7
1Row 1000mm Dia
Sr. no SOR I.No. Description of Item No. Length (m) Width (m) Thickness (m) Qnty. Unit Rate(Rs) Amount( Rs/- )
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Head Wall 2 6.45 1.9 1.4 34.31 Cum
Pipe portion 1.0 4.0 1.6 0.9 5.58 Cum
D/S Portion (apron) 3 1.55 0.3 0.00 Cum
U/s portion (apron) 2.25 1.55 0.3 0.00 Cum
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Head Wall - Foundation 2 6.45 1.55 0.2 4.00
Head Wall - Upto NBL - Avg Width ( 1.10+1.56)/2 = 1.33m 2 6.15 1.40 1.2 20.66
Deduction for pipe -1 5.510 0.785 1.513 -6.544
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Deduct Pipe Portion -2 1.18 1.00 -2.35
4 7.4(B) Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(B)1000 mm dia
6 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing weep holes 0.00 Nos 239.00 0.00
5 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 1 5.10 1.55 0.25 1.98
6 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material 2 6.45 0.15 1.20 2.32 Cum
9 10.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301
9 6.16 Providing and fixing guard srone 200x200x250 And given 2 coats oil paint
10 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 2.30 2.00 0.10 0.00 Cum 1660.00 0.00
Total Total for one 1000mm dia. One row CD work is Rs /- 267671.79
Consultant Sub Engineer Assistant Engineer 0
0 PIU PMGSY PIU PMGSY 0 0
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR 3Rx1000MM DIA. HUME PIPE CULVERT ( Three ROW )
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Format F-7
1Row 1000mm Dia
Sr. no SOR I.No. Description of Item No. Length (m) Width (m) Thickness (m) Qnty. Unit Rate(Rs) Amount( Rs/- )
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Head Wall 2 6.45 1.9 1.4 34.31 Cum
Pipe portion 1.0 4.0 1.6 0.9 5.58 Cum
D/S Portion (apron) 3 1.55 0.3 0.00 Cum
U/s portion (apron) 2.25 1.55 0.3 0.00 Cum
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Head Wall - Foundation 2 6.45 1.55 0.2 4.00
Head Wall - Upto NBL - Avg Width ( 1.10+1.56)/2 = 1.33m 2 6.15 1.40 1.2 20.66
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Deduct Pipe Portion -2 1.18 1.00 -2.35
4 7.4(B) Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(B)1000 mm dia
6 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing weep holes 0.00 Nos 239.00 0.00
5 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 1 5.10 1.55 0.25 1.98
6 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material 2 6.45 0.15 1.20 2.32 Cum
9 10.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301
9 6.16 Providing and fixing guard srone 200x200x250 And given 2 coats oil paint
10 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 2.30 2.00 0.10 0.00 Cum 1660.00 0.00
Total Total for one 1000mm dia. One row CD work is Rs /- 237466.74
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 1.00M SPAN SLAB DRAIN Format F-7
2 M Salb Culvert
Location at RD :- 885 M
S.No. SOR Item No. Description of Item No. Length Width Height/ Depth Quantity Unit Rate Amount
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Abutments 2 7.7 1.40 0.60 12.94 cum
Wingwalls 1.80 1.80 1.40 0.00 cum
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC 2 7.7 1.40 0.20 4.31
Abutments-Bottom Block ( From foundation to NBL) 2 7.70 (1.20+0.70)/2 1.50 21.95
Wingwalls - Foundation PCC 1.8 1.8 0.20 0.00
Wingwalls -Bottom Block ( From foundation to NBL) 1.70 (1.20+1.60)/2 1.20 0.00
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 7.50 (0.70+1.20)/2 1.50 0.00
Top Block ( From NBL to Wing wall cap ) (1.8+2.3)/2 (0.40+1.00)/2 1.79 0.00
Wing wall cap 2.30 0.40 0.150 0.00
Wheel guard 0.40 0.40 0.60 0.00
Abutment cap 7.5 0.7 0.2 0.00
Dirt Wall 7.5 0.4 0 0.00
Road Karb 8 0.4 0.38 0.00
Wheel guard 0.40 0.40 0.60 0.00
Total 0.00 cum 3848.00 0
3 7.27(II) Providing and laying cement for rainforced cement conctete in super structure including centering & form awork complete as per drawing and specifications. (II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
4 7.28 Providing laying and placing in position HYSD rainforcement in super structure complete as per drawing and specification.
For Cap beam & dirt wall
Main bar - 12 mm dia@120 mm c/c 1 63 2.09 0.89 117.19
Distribution bar -8 mm dia@160 mm c/c 1 14 7.42 0.395 41.03
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 8 7.42 0.617 36.63
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 2.02 0.617 31.16
For chair - 12mm dia 1 12 0.94 0.89 10.04
Total 236.04 kg
(a) for slab @120 kg/cum of r.c.c content
(a) for surface reiinforcement @8kg/cum of PCC content
6 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 0 No 239.00 0
7 7.24 Providing and laying filter media with Granular crushed aggregates as per specification to a thickness of not less then 600mm with smaller size towards the soil and boulder size towards the wall and providing over the entire surface behind abutment, wing
Behind Abutments 0.60 4.91 1.00 0.00
Behind Returns 0.00 0.60 1.00 0.00
7 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 7.50 0.00 M 308.00 0
8 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2.00 0.00 No. 1,511 0
9 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Abutment - Upto NBL 7.70 (0.1+0.50)/2 1.20 0.00
Top Block - Behind abutment & wing wall (4.0+5.2)/2 (1.8+2.30)/2 1.50 0.00
10 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 2.00 2.00 0.23 0.00 Cum 1440 0.00
11 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 2.00 2.00 0.10 0.00 Cum 1660 0.00
GRAND TOTAL 143887
Consultant Sub Engineer Assistant Engineer 0
0 PIU PMGSY PIU PMGSY 0 0
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 1.50M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 900
1.5M Slab Culvert
Sr. NO SOR ITEM DESCRIPTION No. L B H Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
i) Upto 3m depth below av. GL
Retaning wall in all four side of culvert 5.00 1.7 1.40 0.000
2 II Ordanary Rock ( Not Requiring Blasting)
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC 2 8.9 2.2 0.20 7.832
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.7)/2 (1.50+2.00)/2 1.50 43.050
Wingwalls - Foundation PCC 4 1.50 2.00 0.20 2.400
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.50 (1.30+1.80)/2 1.50 13.950
Bed protection 1 7.50 1.50 0.20 2.250
Retaning wall in all four side of culvert
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.30)/2 1.80 27.000
Top Block ( From NBL to Wing wall cap ) 4 (1.7+2.3)/2 (0.40+1.10)/2 2.06 12.360
4 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
(II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.100
5 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.40 MT 54,560 21,706.24
For Cap beam & dirt wall 161.80
Main bar - 12 mm dia@120 mm c/c 1 64 2.09 0.89 119.05
Distribution bar -8 mm dia@160 mm c/c 1 14 7.42 0.395 41.03
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 8 7.42 0.617 36.63
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 2.02 0.617 31.16
For chair - 12mm dia 1 12 0.94 0.89 10.04
(a) for surface reiinforcement @8kg/cum of PCC content
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 14 14.00 No 239.00 3,346.00
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 0.60 4.91 1.00 0.00
Behind Returns 0.60 1.00 0.00
9 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 308.00 4,620.00
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2.00 0.00 No. 1,511.00 0.00
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (4.0+5.2)/2 (1.7+2.3)/2 1.80 33.12
12 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 1.50 1.50 0.23 0.00 Cum 1440.00 0.00
13 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 1.50 1.50 0.10 0.00 Cum 1660.00 0.00
Consultant Sub Engineer Assistant Engineer 0.00
0 PIU PMGSY PIU PMGSY 0 0
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 2.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 640
2 M Salb Culvert
Location at RD :- 885 M
S.No. SOR Item No. Description of Item No. Length Width Height/ Depth Quantity Unit Rate Amount
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Abutments 2 8.9 2.20 2.00 78.320 cum
Wingwalls 4 1.50 2.00 2.00 24.000 cum
Retaning wall in all four side of culvert 4 5.00 1.7 1.40 47.600
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC 2 8.9 2.2 0.20 7.832
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.7)/2 (1.50+2.00)/2 1.50 43.050
Wingwalls - Foundation PCC 4 1.50 2.00 0.20 2.400
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.50 (1.30+1.80)/2 1.50 13.950
Bed protection 1 7.50 2.0 0.20 3.000
Retaning wall in all four side of culvert
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.30)/2 1.80 27.000
Top Block ( From NBL to Wing wall cap ) 4 (2.7+3.3)/2 (0.40+1.10)/2 2.09 18.810
Wing wall cap 4 2.30 0.40 0.150 0.55
Wheel guard 2 0.40 0.40 0.60 0.19
Abutment cap 7.5 0.7 0.2 0.00
Dirt Wall 7.5 0.4 0 0.00
Road Karb 8 0.4 0.38 0.00
Wheel guard 0.40 0.40 0.60 0.00
4 7.27(II) Providing and laying cement for rainforced cement conctete in super structure including centering & form awork complete as per drawing and specifications. (II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
5 7.28 Providing laying and placing in position HYSD rainforcement in super structure complete as per drawing and specification.
For Cap beam & dirt wall 161.80
Main bar - 12 mm dia@85 mm c/c 1 90 2.60 0.89 208.26
Distribution bar -10 mm dia@250 mm c/c 1 11 7.42 0.617 50.36
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 9 7.42 0.617 41.20
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 2.02 0.617 31.16
For chair - 12mm dia 1 12 1.05 0.89 11.21
Total 504.00 kg
(a) for slab @120 kg/cum of r.c.c content
(a) for surface reiinforcement @8kg/cum of PCC content
6 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 14 10.00 No 239.00 2390
7 7.24 Providing and laying filter media with Granular crushed aggregates as per specification to a thickness of not less then 600mm with smaller size towards the soil and boulder size towards the wall and providing over the entire surface behind abutment, wing
Behind Abutments 0.60 4.91 1.00 0.00
Behind Returns 0.00 0.60 1.00 0.00
8 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 M 308 4620
9 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 1,511 6,044
10 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (4.0+5.2)/2 (1.7+2.3)/2 1.80 33.12
11 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 1.50 1.50 0.23 0.00 Cum 1440 0.00
12 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 1.50 1.50 0.10 0.00 Cum 1660 0.00
GRAND TOTAL 832093
Consultant Sub Engineer Assistant Engineer 0
0 PIU PMGSY PIU PMGSY 0 0
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 3 X 5.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 9.30 2.60 0.20 9.67 Cum
Returns 4 3.40 2.45 0.20 6.66 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
PCC Grade M-15 ( Nominal Mix 1:2.5:5)
Abutments 2 9.3 2.60 0.20 9.67
Bottom Block( From foundation to NBL) 2 (7.7+9.1)/2 (1.70+2.40)/2 2.10 72.32
Wingwalls - Foundation PCC 4 3.40 2.45 0.20 6.66
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.40 (1.55+2.25)/2 2.10 54.26
Pier -Bottom Block ( From foundation to NBL) 2 8.70 1.20 2.10 43.85
Bed protection 3 7.50 5.0 0.20 22.500
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Abutment cap 7.50 0.70 0.20 0.00
Top Block ( up to Abutment cap bottom) 4 (4.30+3.50)/2 (0.40+1.35)/2 2.88 39.31
Wing wall cap 4 4.30 0.40 0.150 1.03
Coping above Return Wall 3.35 0.40 0.15 0.00
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 4.87 MT 54,560 265,764
For Cap beam & dirt wall 265.15
Surface Area of Return 2.16 1.40 0.00
Surface Area of Pier 18.30 4.15 0.00
Distribution bar -12 mm dia@175 mm c/c 3 31 7.42 0.890 614.15
Top - Longitudinal bar - 10 mm dia@300 mm c/c 3 18 7.42 0.617 247.22
Top - Transerves bar - 10 mm dia@300 mm c/c 3 25 5.32 0.617 246.18
For chair - 20mm dia 3 16 1.59 2.47 188.51
For Kerb 120kg/Cum 3 1.94 5.81
For Abutment Cap '@ 85.0 kg / sqm 3 0.00 0.00
For Ballast wall '@ 75.00 kg / cum 3 0.00 0.00
For Surface Reinforcement @5kg /Sqm 3 20.40 3.20 5.00 979.20
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20 No 239.00 4780
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 2.40 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 21.00 0.00 Rm 2054.00 0
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 3 4.00 12.00 No. 1511.00 18132
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (3.5+5.2)/2 (2.7+3.30)/2 2.40 62.640
12 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 4 7.50 30.00 RM 308.00 9240
13 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 5.00 3.00 0.23 13.80 Cum 1440.00 19872
14 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 5.00 3.00 0.10 6.00 Cum 1660.00 9960
TOTAL Rs. 2053454
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 3.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 1700
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
Retaning wall in all four side of culvert 4 5.00 1.7 1.40 47.600
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 8.9 2.30 0.20 8.19 Cum
Wingwalls 4 1.40 2.10 0.20 2.35 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC 2 8.9 2.30 0.20 8.19
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.70)/2 (1.60+2.10)/2 1.50 45.51
Wingwalls - Foundation PCC 4 1.40 2.10 0.20 2.35
Wingwalls -Bottom Block ( From foundation to NBL) 4 1.40 (1.40+1.90)/2 1.50 13.86
Bed protection 1 7.50 3.0 0.20 4.500
Retaning wall in all four side of culvert
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.40)/2 2.10 33.08
Top Block ( From NBL to Wing wall cap ) 4 (1.6+2.3)/2 (0.40+1.20)/2 2.45 15.29
Wing wall cap 4 2.30 0.40 0.150 0.55
Wheel guard 2 0.40 0.40 0.60 0.19
5 7.27 (II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Providing laying and placing in position HYSD rainforcement in super structure complete as per drawing and specification. 0.75 MT 54560 41183
For Cap beam & dirt wall 167.21
Main bar - 16 mm dia@125 mm c/c 1 61 3.63 1.58 349.57
Distribution bar -10 mm dia@175 mm c/c 1 21 7.42 0.617 96.14
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 13 7.42 0.617 59.52
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 3.52 0.617 54.30
For chair - 16mm dia 1 14 1.27 1.58 28.09
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20.00 No 239 4780
8 7.24 Providing and laying filter media with Granular crushed aggregates as per specification to a thickness of not less then 600mm with smaller size towards the soil and boulder size towards the wall and providing over the entire surface behind abutment, wing
Behind Abutments 0.60 4.91 2.00 0.00
Behind Returns 0.60 1.50 0.00
9 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 M 308 4620
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 1511 6044
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (3.7+5.2)/2 (1.7+2.30)/2 2.10 37.38
12 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 2.00 2.50 0.23 0.00 Cum 1440 0.00
13 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 2.00 2.50 0.10 0.00 Cum 1660 0.00
TOTAL Rs. 899830.14
Consultant Sub Engineer Assistant Engineer 0
0 PIU PMGSY PIU PMGSY 0 0
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR CONSTRUCTION OF DROSS DRAINAGE WORKS SLAB CULVERTS OF 4.00 M.SPAN
4 M Salb Culvert
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Total No.Of Slab Culvert:
Location at RD :- M
Sno. SOR Item No. Description of Item Length Width Height/ Depth Quantity Unit Rate Amount
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Ordanary Rock ( Not Requiring Blasting)
Abutments 2 9.1 2.33 0.2 8.49 Cum
Wingwalls 4 1.8 2.13 0.2 3.07 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Foundation concrete Abutement 2 9.1 2.53 0.2 9.22
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
II ( i) Abutment upto Bed 2 8.9 2.33 0.2 8.29
Abutment From Bed to below cap level (1.53 + 0.70)/2 =1.4 2 7.5 1.40 2.500 52.50
Returns for copping 1.8 0.4 0.15 0.00
Abutment Top 2 7.5 0.7 0.2 2.10
5 7.27(II) Providing and laying cement for rainforced cement conctete in super structure including centering & form awork complete as per drawing and specifications. (II)R.C.C. M 25 ( Dssign Mix)
6 7.28 Providing laying and placing in position HYSD rainforcement in super structure complete as per drawing and specification.
(a) for slab @120 kg/cum of r.c.c content 1149
(a) for surface reiinforcement @8kg/cum of PCC content 322
7 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 0 0.60 4.91 1.50 0.00
Behind Returns 0 1.80 0.60 1.50 0.00
8 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20 No 239 4780
9 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 308 4620
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 1 4.00 4.00 No. 1511 6,044
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
12 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 0 5.00 2.00 0.23 0.00 Cum 1440.00 0
13 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 0 5.00 2.00 0.10 0.00 Cum 1660.00 0.00
GRAND TOTAL 853242
Consultant Sub Engineer Assistant Engineer 0
0 PIU PMGSY PIU PMGSY 0 0
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 5.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 1800
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 9.1 2.50 0.20 9.10 Cum
Returns 4 3.40 2.35 0.20 6.39 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC 2 9.1 2.50 0.20 9.10
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+8.9)/2 (1.70+2.30)/2 1.80 59.76
Wingwalls - Foundation PCC 4 3.40 2.35 0.20 6.39
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.40 (1.55+2.15)/2 1.80 45.29
Bed protection 1 7.50 5.0 0.20 7.500
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.50)/2 2.40 39.60
Top Block ( From NBL to Wing wall cap ) 4 (4.30+3.50)/2 (0.40+1.35)/2 2.88 39.31
Wing wall cap 4 4.30 0.40 0.150 1.03
Wheel guard 2 0.40 0.40 0.60 0.19
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 2.08 MT 54560 113754
For Cap beam & dirt wall 172.01
Main bar - 20 mm dia@140 mm c/c 1 55 5.81 2.47 789.56
Distribution bar -12 mm dia@175 mm c/c 1 34 7.42 0.890 224.53
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 20 7.42 0.617 91.56
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 5.72 0.617 88.23
For chair - 20mm dia 1 18 1.49 2.47 66.25
Surface Reinforcement for - Abutment & wing wall @ 5kg/sqm 2 20.40 3.20 5.00 652.80
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20.00 No 239 4780
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 3.00 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 1511 6044
10 7.23 (I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (3.5+5.2)/2 (2.7+3.30)/2 2.40 62.64
11 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 308 4620
12 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 3.00 2.00 0.23 5.52 Cum 1440.00 7948.80
13 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 3.00 2.00 0.10 2.40 Cum 1660.00 3984.00
TOTAL Rs. 1162956.03
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 1 X 6.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 1980
Sr. NO SOR No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
Retaning wall in all four side of culvert 5.00 1.7 1.40 0.000
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 9.3 2.80 0.30 15.62 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
Abutments- Foundation PCC 2 9.3 2.80 0.20 10.42
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+9.100)/2 (1.90+2.60)/2 2.10 79.38
Wingwalls - Foundation PCC 4 3.20 2.70 0.20 6.91
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.20 (1.80+2.5)/2 2.10 57.79
Bed protection 1 7.50 6.0 0.20 9.000
Retaning wall in all four side of culvert
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.70)/2 3.00 54.00
Top Block ( From NBL to Wing wall cap ) 4 (3.3+4.3)/2 (0.40+1.60)/2 3.53 53.66
Wing wall cap 4 4.30 0.40 0.150 1.03
Wheel guard 2 0.40 0.40 0.60 0.19
Top Block ( From Abutment cap bottom to cap top)
Coping above Return Wall 4.30 0.40 0.15 0.00
Wheel guard 0.40 0.40 0.60 0.00
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5(II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 2.85 MT 54,560.00 155,589
For Cap beam & dirt wall 175.01
Distribution bar -12 mm dia@150 mm c/c 1 46 7.42 0.890 303.77
Top - Longitudinal bar - 10 mm dia@300 mm c/c 1 23 7.42 0.617 105.30
Top - Transerves bar - 10 mm dia@300 mm c/c 1 25 6.72 0.617 103.66
For chair - 20mm dia 1 20 1.59 2.47 78.55
Surface Reinforcement for - Abutment & wing wall @ 5kg/sqm 2 22.80 4.20 5.00 957.60
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 24 24.00 No 239.00 5,736
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 3.00 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 14.10 0.00 Rm 2,054 0
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 2.00 4.00 No. 1,511 6,044
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (2.8+5.2)/2 (3.3+4.30)/2 3.00 91.20
12 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 2 7.50 15.00 m 308 4620
13 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 3.00 2.00 0.23 5.52 Cum 1440.00 7,949
14 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 3.00 2.00 0.10 2.40 Cum 1660.00 3,984
TOTAL Rs. 1516116
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 2 X 6.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
A i) Upto 3m depth below av. GL
I Ordanary Soil
Retaning wall in all four side of culvert 4 5.00 1.7 1.40 47.600
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 9.3 2.80 0.30 15.62 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
PCC Grade M-15 ( Nominal Mix 1:2.5:5)
Abutments- Foundation PCC 2 9.3 2.80 0.20 10.42
Abutments-Bottom Block ( From foundation to NBL) 2 (7.7+9.100)/2 (1.90+2.60)/2 2.10 79.38
Wingwalls - Foundation PCC 4 3.20 2.70 0.20 6.91
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.20 (1.80+2.5)/2 2.10 57.79
Pier - Foundation PCC 1 8.90 1.40 0.20 2.49
Pier -Bottom Block ( From foundation to NBL) 1 8.70 1.20 2.10 21.92
Bed protection 2 7.50 6.0 0.20 18.000
Retaning wall in all four side of culvert
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
PCC Grade M-20 ( Nominal Mix 1:2:4)
Top Block ( From NBL to Abutment cap ) 2 7.50 (0.70+1.70)/2 3.00 54.00
Top Block ( From NBL to Wing wall cap ) 4 (3.3+4.3)/2 (0.40+1.60)/2 3.53 53.66
Wing wall cap 4 4.30 0.40 0.150 1.03
For Guard stone 2 22.00 0.40 0.375 6.60
Wheel guard 2 0.40 0.40 0.60 0.19
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5(II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 4.80 MT 54,560 261,640
For Cap beam & dirt wall 265.15
Distribution bar -12 mm dia@150 mm c/c 2 43 7.42 0.890 567.93
Top - Longitudinal bar - 10 mm dia@300 mm c/c 2 22 7.42 0.617 201.44
Top - Transerves bar - 10 mm dia@300 mm c/c 2 25 6.32 0.617 194.97
For chair - 20mm dia 2 15 1.59 2.47 117.82
Surface Reinforcement for - Abutment & wing wall @ 5kg/sqm 2 22.80 4.20 5.00 957.60
Surface Reinforcement for - Pier @ 5kg/sqm 1 19.00 4.20 5.00 399.00
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 24 24.00 No 239 5,736
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 3.00 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 20.00 0.00 Rm 2,054 0
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 4.00 8.00 No. 1,511 12,088
11 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 3 7.50 22.50 sqm 308.00 6,930
12 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Abutment - Upto NBL 2 9.30 (0.1+0.60)/2 2.10 12.05
Top Block - Behind abutment & wing wall 2 (2.8+5.2)/2 (3.3+4.30)/2 3.00 91.20
13 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 3.00 2.00 0.23 0.00 Cum 1440 0
14 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 3.00 2.00 0.10 0.00 Cum 1660 0
TOTAL Rs. 2105374
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
DETAIL ESTIMATE FOR 2 X 5.00M SPAN SLAB CULVERT Format F-7
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg RD:- 0
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B H Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
i) Upto 3m depth below av. GL
I Ordanary Soil
2 II Ordanary Rock ( Not Requiring Blasting)
Abutments 2 9.10 2.50 0.20 9.10 Cum
Returns 4 3.40 2.35 0.20 6.39 Cum
3 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II)P.C.C grade M 15(Nominal mix (1:2.5:5)
PCC Grade M-15 ( Nominal Mix 1:2.5:5)
Abutments 2 8.9 1.40 0.20 4.98
Bottom Block( From foundation to NBL) 2 (7.7+8.9)/2 (1.70+2.30)/2 1.80 59.76
Wingwalls - Foundation PCC 4 3.40 1.40 0.20 3.81
Wingwalls -Bottom Block ( From foundation to NBL) 4 3.40 (1.55+2.15)/2 1.80 45.29
Pier -Bottom Block ( From foundation to NBL) 1 8.70 1.20 1.80 18.79
Bed protection 2 7.50 5.0 0.20 15.000
4 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Abutment cap 7.50 0.70 0.20 0.00
Top Block ( up to Abutment cap bottom) 4 (4.30+3.50)/2 (0.40+1.35)/2 2.88 39.31
Wing wall cap 4 4.30 0.40 0.150 1.03
Coping above Return Wall 3.35 0.40 0.15 0.00
5 7.27(II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5 (II)R.C.C. M 25 ( Dssign Mix)
R.C.C. M 25 ( Dssign Mix)
Abutment cap 2 7.50 0.70 0.20 2.10
6 7.28 Supplying, fitting and placing HYSD bar reinforcement in superstructure complet as per drawing and technical specifications Clause 1002, 1010 and 1202. 3.33 MT 54,560 181,787
For Cap beam & dirt wall 265.15
Surface Area of Return 2.16 1.40 0.00
Surface Area of Pier 18.30 4.15 0.00
Distribution bar -12 mm dia@175 mm c/c 2 31 7.42 0.890 409.44
Top - Longitudinal bar - 10 mm dia@300 mm c/c 2 18 7.42 0.617 164.81
Top - Transerves bar - 10 mm dia@300 mm c/c 2 25 5.32 0.617 164.12
For chair - 20mm dia 2 16 1.59 2.47 125.67
For Kerb 120kg/Cum 1.94 0.00
For Abutment Cap '@ 85.0 kg / sqm 0.00 0.00
For Ballast wall '@ 75.00 kg / cum 0.00 0.00
For Surface Reinforcement @5kg /Sqm 2 20.40 3.20 5.00 652.80
7 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 20 20 No 239.00 4780
8 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutments 6.50 0.30 2.40 0.00
Behind Returns 3.35 0.30 1.50 0.00
9 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 21.00 0.00 Rm 2054.00 0
10 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 2 4.00 8.00 No. 1511.00 12088
11 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
Top Block - Behind abutment & wing wall 2 (3.5+5.2)/2 (2.7+3.30)/2 2.40 62.640
12 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 3 7.50 22.50 RM 308.00 6930
13 10.5(I) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I)Stone/Boulder 4 2.00 3.00 0.23 5.52 Cum 1440.00 7949
14 10.6 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 4 2.00 3.00 0.10 2.40 Cum 1660.00 3984
TOTAL Rs. 1504065
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
Pradhan Mantri Gram Sadak Yojana (PMGSY)
CHECK LIST FOR P.I.U & S.T.A
(For Individual Road works)
To be filled by PIU.
1. Location:- State:- District:- Bilaspur Block:- Thakatpur
2. Package No:-
3.Name of the Road: From: Rajpur Sidhbaba road To: Bijaghora Pahuch marg
4. Total Length (Km) 2.130 In Built up area : 0.000 Km In Open Area : 2.130 Km
5. Estimated Cost (GoI+State) Rs.: 160.61 Lakhs 161.23 Lakh (including GST+Cess)
Govt of India Cost Borne by State Govt
Item Length km Cost (Lakhs) Cost(Lakhs) iGST Item Cost(Lakhs) Cost(Lakhs) iGST
Flexible Pavement 2.13 113.82 134.31 Electric Telephone shifting 0.00 0.00
Rigid Pavement 0 0.00 0.00 Hard shoulder diff 0.00 0.00
Others (CD work) 2.13 16.35 19.29 Road Inauguration 0.10 0.12
Social Economic & Safegaurd 5.94 7.01 Any other Item
6. Type of Proposal:- New connectivity/ Up gradation
o If the proposed road is a New connectivity YES / NO
. Is the road a part of core network YES / NO
. If Yes, Through / Link Route Number T- & L -
. Name of the unconected Target Habitation (s) (to be crosschecked with CN-6)
. Population sub served by the proposed road
. Does the Proposed Road lead up to the Habitation for which it is supposed to provide connectivity (In other words are you sure that the road is not being made partially?) YES / NO
. Does the Proposed Road connect the unconnected Habitation to (A) (B)
(a) Another Habitation having All- weather road.
(b) Directly to an All weather road.
If (b), indicate the nature of road to which the proposed road leads. RR MDR SH NH
o If the proposal is for up gradation
- Is the road a part of the core network
- Is it associated Through Route or not
- Age of the Road
- Is it certified that there are no other Unconnected Eligible Habitations in the district. N/A
7 a) Whether the Proposed Road has the desired carriageway width, YES/NO
Roadway width and Road Land Width (RLW).
b) Indicate the actual widths adopted for In the In the
the Proposed road. Built Up Area (m) open Area (m)
a) Carriageway 5.50 5.50
b) Roadway 9.00 9.00
c) Road Land Width 12 m 12 m
INDEX MAP (Not to scale) : Attached
Bilaspur mungeli Road
Rajpur Sidhbaba road 2130.000 Bijaghora Pahuch marg
CD1 CD2 CD3 CD4 CD5 CD6 CD7 CD8 CD9 CD10
Cross Section Details
a) Cross Section of the existing road showing different component layers:
Soil having CBR 10 to 15
Embankment Height varies from 0 - 350 mm
(in some places it is below than side levels)
b) Cross Section of the proposed road showing different component layers:
(Should be per Actual Provisions of DPR)
Note: All Dimention in mm.
Name of Road : Rajpur Sidhbaba road To Bijaghora Pahuch marg
8. Base year traffic volume Enclosed Revised traffic Data and Design separately (Designed as per IRC SP:72 - 2015)
Month & Year of Traffic Volume
Motorised Traffic Non Motorised Traffic
Days Cars, Jeep, Vans, Three Wheelers Motorised two Wheelers Light Commercial Vehicle Trucks Agricultural Tractors Trallers Buses Cycles Cycle Rickshawa Animal Drawn Vechicle
L U OL L U OL L U OL SWC Num. Tyred
ADT in the year of Traffic Count =
Growth rate adopted (%) = 6.0% Base Year Traffic AADT (T) =
Design Life = 1 0 years
Number of Harvesting Seasons = 3
No. of Days in Each Harvesting Season (t) = 75
Value of (n) = 1
Traffic Category = T 9
9. Subgrade CBR (for Different Sections =
10. Cost Details Cost Rs. Cost/km (Rs)
A. General Costs 13663614
Cost of Preparation of DPR 0
B. Pavement Components
Description of the layer Thickness in (mm) Quantity Cost Rs. Cost/km (Rs.)
Earth work - in Excavation/ Cutting 644.96 41922 19682
Earth work - in Filling (Embankment) 13601.10 2366269 1110924
Subgrade/earthen shoulder (if provided seperately) 150 1480.99 296198 139060
Shoulders ( if not considered in the Earthwork) 0
Granular Sub base 175 0.00 0 0
Soil + Aggregate Mix 0
C. Bituminous Layers 0
Prime Coat (0.7 to 1.00 kg /sqm ) SS-1 9859.34 423952 199038
Surface Dressing 0
D. Cement Concrete Road PQC (M 30) 100 0.00 0 0
Dry lean concrete 100 0.00 0 0
Name of Road : Rajpur Sidhbaba road To Bijaghora Pahuch marg
No. of Existing CD Works
Do they require any improvement- specify the nature of improvement proposed
If Yes, cost of improvement
If yes, their Number and Cost of improvement New Praposed
Cost of Proposed CD Works 1338359 628338
Cost in Rs Cost /Km (Rs)
F. Protection Works
Retaning Wall 140 m Toe Wall 140 m Pitching 0 m 2739602 1286198
G. Pucca Side Drains (if provided) Length 440 377289 177131
H. Road Logo, other Road Furniture 593998 278872
I. Any other Provisions - Field Drains,Clearing and grubbing,Setting out,Dismanteling pipes,Dismanteling Pavements 1473677 691867
Total Cost of the Project (Rs) 13663614 6414842
Total Cost of the Project (Rs) with GST 16123064 7569514
Name of the Road Rajpur Sidhbaba road To Bijaghora Pahuch marg
I. Five Year Routine maintenance:
Year Cost in lakhs % of Const. Cost Cost /km
Total Maint. Cost 852000 5.28 400000
Total Maint. Cost with GST 1005360 6.24 472000
11 Whether the road has Geometrics as per Rural Roads Manual (RRM) YES / NO
12 Whether CD works / Protection works are provided as per RRM / Latest Circulars of NRRDA/ Respective Codes. YES / NO
13 Whether the Cost estimates are as per standard data analysis and S.S.R YES / NO
14 Sources and the Lead distances of Materials are as under
Material Source Lead Distance Material Source Lead Distance
Earth with in 1-2 km
Aggregate Aggregate
Prepared By: Checked By: Scrutinized By:
PRADHAN MANTRI GRAM SADAK YOJANA(PMGSY)
State : Chattisgarh District : Bilaspur Package No.:
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Material Source Lead(In Km)
Analysis Of Rates :
SI.No. SI.No.as per Mord SDB for Rural Roads Description Units Qty. Rate (Rs) Amount (Rs)
A. Construction Activities
B. Construction Activities (Year wise)
1 . Rate Analysis shall cover all the items such as Site Clearance . Earth Work Drainage , Granular
Sub Base , &Surface Course , CD works , Traffic Signs , PMGSY Board & Logo &
Maintenance actvities .
2 . Where local materials is used at site and the specifications & rate analysis are not found in BOS
& SDB,for Rural Roads,the analysis &nomenclature of the item can be suitably used based on
other standards such as PWD Schedule or Rate or assesment based on field observation .
3 . Comleted items rate including lead for carriage of material should be shown
Pradhan Mantri Gram Sadak Yojana
CERTIFICATE OF GROUND VERIFICATION FROM EXECUTIVE ENGINEER / HEAD PIU
Name of Road Rajpur Sidhbaba road To Bijaghora Pahuch marg
Dharamjaygarh Pathalgaon Road To Bhalupakhna
1 a) Certified that the land width for the road is available and that no additional land is required ; or
b) Certified that land width for the road is likely to be available as certified by the Panchayats.
2 a) Certified that no forest land is involved along the entire road way ; or
b) Certified that the case for permission under Forest conservation Act has been moved to the Forest
3 Certified that the DPR has been checked at site by
EXECUTIVE ENGINEER
Pradhan Mantri Gram Sadak Yojana
LIST OF DPRS VERIFIED ON GROUND
S. No. DPRs seen on ground by DPR Nos % of total number
EXECUTIVE ENGINEER
Community Consultation Checklist – Engineering
Question Yes No N/a
1. Has the PIU conducted a survey using the GSS app?
2. Has the feedback from the SC/ST population been taken into consideration during the survey conducted through the GSS app by the PIU?
3. Are there any flood prone areas on the road? No
1.1 Are locations specified and inspected?
1.2. Is high flood level specified for each stretch?
1.3 Are locations specified and inspected?
4. Are there any locations on the road where irrigations ducts need to be provided? No
2.1 Are locations specified and inspected?
5. Can the road be used as a shortcut by through traffic? Yes
6. Does the road lead to any quarries, mining areas, brick kilns, logging areas, tourist attractions etc.? Yes
7. Are there plans to build new schools, hospitals, temples etc No
8. Is there potential for double connectivity?
If yes on any of 3-6: Yes
6.1 Is information on location, size and nature of additional traffic generators and specific routes obtained? Yes
9. Is there a need for deviations from existing track? No
7.1 Were the proposals for deviation shown on site and explained to the community?
7.2 Is the land availability checked?
7.3 If there is a need for donation, were the owners consulted regarding their agreement to donate the land?
10. Is there a need for speed breakers? Yes
8.1 Is location and rational for speed breakers identified? Yes
8.2 Is rationale verified and checked on site? Yes
8.3 Are alternative or additional locations discussed? Yes
11. Are all existing intersections checked with the community on site? Yes
9.1 Is the use of intersecting roads identified (e.g. school children, farm machinery, etc)? Yes
12. Are proposed culvert locations verified with the community? Yes
10.1 Is there a need for additional culverts? Yes
10.2 If yes, are locations identified? Yes
For DPR consultant For PIU For PIC
Design Report & Field survey details
6 Detail of Temporary Benchmarks Yes
7 Traffic survey details Yes
8 Material test reports Yes
9 Pavement & curve Design Yes
10 Hydraulic Design ( Detail of Exi. & proposed CD works ) Yes
C. List of Figures
1 Figure 1 :- road Map of India & state
2 Figure 2 :- District Map
3 Figure 3 :- Block Map
4 Figure 4 :- Strip plan
5 Figure 5 :- Quarry Map
Design Report & Field survey details
6 Detail of Temporary Benchmarks Yes
7 Traffic survey details Yes
8 Material test reports Yes
9 Pavement & curve Design Yes
10 Hydraulic Design ( Detail of Exi. & proposed CD works ) Yes
1 Annexure 1 :- Detail of soil test
2 Annexure 2 :- detailed hydraulic calculation of all replaced and proposed new culvert
3 Annexure 3 :- chainages wise cut/Fill volume
4 Annexure 4 :- Transit walk Report
Drawing & detail of structure & Protection work
2) Detail X - section
3) Detail L- section
PRADHAN MANTRI GRAM SADAK YOJANA
(Ministry Of Rural Development, Govt of India)
COST ESTIMATE FOR 600MM DIA. HUME PIPE CULVERT ( ONE ROW )
Road Name:- Thakatpur To Hardi Package No. :-
Length of Road:- 10.71 Km 1Row 1000mm Dia
Block :- Takhatpur
District :- Bilaspur
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Format F-6
Sr. no SOR Item No. CSR I.M. Page no Description of Item No. Length (m) Width (m) Thickness (m) Qnty. Unit Rate(Rs) Amount( Rs/- )
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material .Oridanary soil (i) upto 3 m depth
Head Wall 4.3 1.3 1 0.00 Cum
Pipe portion 10 1.1 0.8 0.00 Cum
D/S Portion (apron) 3 1.55 0.3 0.00 Cum
U/s portion (apron) 2.25 1.55 0.3 0.00 Cum
2 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
3 7.18 (I) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m (I)P.C.C grade M 15 (Nominal mix (1:2.5:5)
Deduct Pipe Portion 0.76 0.50 0.00
End Piller 0.40 0.40 0.40 0.00
2 7.6(A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106 (A) 600 mm dia
6 12.9 Providing weepholes in brick masonry/stone masony, plain /reinforced conecrete abutment, wing wall with 100mm dia AC pice extending though the full width of the structures with slope of 1(v) towards drawing face complete as per drawing and technicals
Providing weep holes Nos 239.00 0.00
3 7.3(ii) Bedding for Causeway / pipes Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 For Field Crossing 10.00 1.00 0.15 0.00
8 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material 4.30 0.15 0.68 0.00 Cum
9 14.1 Providing and Laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragement weighing less than 25Kg laid dry complete as per drawing and technical specifications Clause 1301
9 6.16 Providing and fixing guard srone 200x200x250 And given 2 coats oil paint
10 14.4 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
11 14.5 Providing and laying Filter Material underneath pitcing in slopes complete as per drewing specifications Clause 1302 Stone / Boulder 2.30 4.00 0.10 0.00 Cum 1660.00 0.00
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg Location :-
DETAILED ESTIMATE . BOX CULVERT - 3M X 3M X 5 No. ( 1 unit )
Sr. NO SOR REF. No. ITEM DESCRIPTION No. L B D Total Qty. UNIT RATE AMOUNT
1 7.1(I) Excavation for structuresas per drawing and technical specifications Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and othar deletercus material and dis posal upto a lead of 50m dressing of sides and bottom a
Cutoff Wall - Long Wall 2 17.00 0.60 2.15 43.86
Retaning Wall B/s 2 20.00 1.90 1.40 106.40
Add 10 % For Slope 42.14
2 7.10 (V) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
C.O. Wall - Long Wall 2 17.00 0.30 2.00 20.40
3 7.8(i) Filling in Foundation Trenches as per drawing and technical specification Clause 1108 & 305.3.9
Sand Filling 1 17.00 7.50 0.10 12.75
4 7.2(I) Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
5 7.10 (I) Providing concrete for plain/ reinforced concrete in open foundations complet as per drawings and technical specification Clause 802,803,1202 & 1203
I. P.C.C. Grade M-10 For Foundation 1 17.00 7.50 0.10 12.75
6 7.26 Providing pressure relief pipes 100 mm dia in bottom Slab of box cell Nos on a filter media base of 500 mm x 500mm as per drawing and as per drawing and technical specificationsClause 1205.5.7
7 7.27 (II) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specificationsClause 800, 1205.4 and 1205.5
Verticals - Inner 4 7.50 0.30 3.00 27.00
8 7.10 (II) Providing concrete for plain/ reinforced concrete in open foundations complet as per drawings and technical specification Clause 802,803,1202 & 1203
II. P.C.C. Grade M-15 For Foundation
Cutoff Wall - Long Wall 2 17.00 0.60 0.15 3.06
Retaning Wall U/S 2 20 1.90 0.20 15.20
Retaning Wall U/S 2 20 1.05 4.00 168.00
9 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
10 7.13 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
cutoff Wall 0.87 MT 53495.00 46540.65
11 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
12 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 0.00 No 239 0
13 7.23(I) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (I) Granular material
14 7.41(II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Total 2,544,120
Consultant Sub Engineer Assistant Engineer EXECUTIVE ENGINEER
MAP OF 2 X 5.00 M SPAN SLAB CULVERT AT
RCC M25 Slab 0.43 m th RCC M25 Slab 0.43 m th
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
SECTION RETURN WALL
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
MAP OF ( 4 X 6.00 M ) SPAN SLAB CULVERT AT SONHAT TO KACCHDI ROAD
DRAWAN BY SUBMITTED BY APPROVED BY
SCALE : NOT TO SCALE DRG NO
Pradhan Mantri Gram Sadak Yojana (Project Proposals-2017-18)
General Breakup of Cost in different Component of Roads
Name of Road Rajpur Sidhbaba road To Bijaghora Pahuch marg
Block Thakatpur
S.No Name of Road Cost of Road work Per Km CD Works Average Cost (Per Km) Remarks
From To Road Length(Km) Site Clearence Earth Work GSB WBM-II WMM WBM-III Shoulder CC Road Bitumen Work Road Furniture Dismantling Field Drains Protection DPR Preperation Other State by borne GST 12% Total Cost Per Km Number of CD Cost of CD GST 12% Cost CD per Km
Consultant Assistant Engineer Executive Engineer Cum Member Secretary
Anand Vibhor Bilaspur CGRRDA
Pradhan Mantri Gram Sadak Yojana (Project Proposals-2017-18)
Name of State: Chattisgarh
S No Name of Road New Connectivity Upgradation Total Cost (in Lakhs) Average Cost (Per KM)
Total Length In Kms Cost (Including CD works( (in Lakhs Average Cost (Per Km) No of Habitation Benifited No of SC/ST Habitations Total Length In Kms Cost (Including CD works( (in Lakhs Average Cost (Per Km) No of Habitation Benifited No of SC/ST Habitations
1 Rajpur Sidhbaba road To Bijaghora Pahuch marg 2.13 152.7502338 71.71 - - 152.75 71.71
Consultant Assistant Engineer EXECUTIVE ENGINEER
0 CGRRDA CGRRDA
Pradhan Mantri Gram Sadak Yojana
Name of the State :- Chhattisgarh
S.No Name of Block Roads Details Habitation being Connected Pavement CD Works Total Cost Average Cost (Per K.M)
From To Name Population Road Lengths (K.m) Esttimated Cost Average Cost No of CD Estameted Cost Average Cost
1 Thakatpur Rajpur Sidhbaba road Bijaghora Pahuch marg 2.13 134.44 #DIV/0! 3 18.31 8.6 152.75 71.71
Consultant Assistant Engineer CGRRDA
0 CGRRDA Project Implementation Unit
Bilaspur Bilaspur
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
(Ministry of Rural Development, Govt. of India)
ROADS PROPOSED IN PMGSY CONNECTIVITY (PAVEMENTS LAYER )
Name of Road Block
S.No. Name of Places / Villages New Constriction/ Up gradation( Use N/U ) Facility accessed (Use A/B/C/D ) Road Length ( Km ) Existing Surface Type Details of Thickness & Cost For Pavement Layers
From To Details Clearing & Grubing Earth Work Sub Grade /Modified Soil Sub base (G.S.B.) WMM WBM G-2 WBM G-3 C.C. Pavement Hard Shoulder Prime Coat Tack Coat PMC with Seal Coat Dismantling Protection Road Furniture DPR Preperation GST @12% Total Cost of Pavement ( sum of 9 to 22)
1 Rajpur Sidhbaba road Bijaghora Pahuch marg U B 2.13 Earthan/WBM Thickness( mm ) 175 0 0 0 200 150 20
Consultant Assistant Engineer EXECUTIVE ENGINEER
Anand Vibhor CGRRDA CGRRDA
Bilaspur Bilaspur
This document was exported from Numbers. Each table was converted to an Excel worksheet. All other objects on each Numbers sheet were placed on separate worksheets. Please be aware that formula calculations may differ in Excel.
Numbers Sheet Name Numbers Table Name Excel Worksheet Name
Form II Maintanance
Table 1 Form II Maintanance
Horizontal curve detail
Table 1 Horizontal curve detail
Table 1 Top Cover Page
Pavement Estmate
Table 1 Pavement Estmate
Table 1 Abstract
Table 1 600mmHP
Table 1 3x3x5x3Unit
Table 1 1000mmHP
Table 1 1.0 m Slab
Table 1 1.5m Slab
Table 1 2.0 m Slab
Table 1 CD BOQ 3.0
Table 1 4m Slab
Table 1 CD 5.0 BOQ
Table 1 2x6m slab
Table 1 CD 6.0 BOQ
Table 1 2x5m slab
2 x 5.0 m SPAN map
Table 1 2 x 5.0 m SPAN map
Pipe Catchment(Correct)
Table 1 Pipe Catchment(Correct)
Catchment slabCorrect(1.50)
Table 1 Catchment slabCorrect(1.50)
Catchment slabCorrect(3.0)
Table 1 Catchment slabCorrect(3.0)
Catchment slabCorrect(6.0)
Table 1 Catchment slabCorrect(6.0)
geometric feature
Table 1 geometric feature
Table 1 Contents
Table 1 Basic Sheet
Table 1 Check list
Table 1 FORMAT F-1 REV
Table 1 F - 9 A
Table 1 Sheet 1
Table 1 Format-2A
Table 1 P-III(2)
Table 1 P-III(1)
Table 1 P-IV (a)
Table 8.2 – Horizontal Curve details
Curve No. IP Chainage Radius Ls Speed S.E. Def Angle Lc Ltotal Hand of Curve Area of Extra widening
(m) (m) (Kmph) D M S (m) (m)
No Steep curves 376.77
DETAILS OF STEEL FOR BOX
Symbol Shape Dia (mm) Spacing (mm) Length (mm) No. Total length (m) Weight (kg)
Add 10% extra 767.23 Kg
Total 8439.54 Kg
say - for one box 8.44 MT
for two box 15.44 MT
Geometric Feature of Road
PROJECT IMPLEMENTATION UNIT
Classification of Road :- Village Road
Road Passes through :- Plain - Hilly terrain
Geometric design of road is done considering:- 50-Km/Hr. rolling design speed.
Land width:- 15m minimum in open area
Building line :- 25m (Distance Between Building Lines)
Control Line :- 35M (Distance Between Building Lines)
Road Way :- Width 7.5M
Clear Width at C.D. Structures 6.6 Meter:- 6.6M
Carriage Way :- 3.75M
Shoulder :- 1.875m both side
Earthen Side Slope 1:2
Camber:- Carriage Way-3.5%
WBM Shoulder :- 4.50%
Slopping Sight Distance:- 60M
Intermediate Sight Dist:- 235M
Super elevation :- e= V2 /225R Limited to 7%
Hence Minimum Radian:- 180M
Maximum Radius:- 280M
Beyond 280m Radius Super Elevation is not required
Length of Transition Curve-25 To 40M
Extra Winding is required at Curve.
Ruling Gradient 1:30
Limiting Gradient 1:20
S.No. Description Remark Page Nos
1 State map , District map , Block map & photographs of exisisting road Yes
2 Proposed Index map Yes
3 Exisisting road inventory Yes
4 Introduction Yes
5 Gometric design standard Yes
Design Report & Field survey details
6 Detail of Temporary Benchmarks Yes
7 Traffic survey details Yes
8 Material test reports Yes
9 Pavement & curve Design Yes
10 Hydraulic Design ( Detail of Exi. & proposed CD works ) Yes
Bill of Quantities
11 Format F-1 : Summary sheet Yes
12 Format F-2A : Road - wise Summary of cost of Pavement Yes
13 Format F-2B : Road - wise Summary of cost of CD Works Yes
14 Format F-3 : Typical Cross Section of Road for New Construction Yes
15 Format F-4 : Details of Existing Roads proposed for Upgradation N.A.
16 Format F-4A : Association of Routes N.A.
17 Format F-5 : Typical Cross Section of Road for Upgradation N.A.
18 Format F-6 : Detailed Estimates for Pavement Yes
19 Format F-7 : Detailed Estimates for CD Works Yes
20 Format F-8 : Rate Analysis N.A.
21 Format F-9A : Summary of Onsite Verification of DPRs by Executive Engineer Yes
22 Format F-9B : List of DPRs verified on Ground Yes
23 Proforma C : Road wise Checklist Yes
24 Proforma B : Summary of Road Work Yes
25 Transect Walk Details Yes
26 Drawing of CD works Yes
27 Future Maintenance & construction programe Yes
28 Earth Work Qty ( cutting & filling ) Yes
29 Detail Cross Section Yes
30 Detail Longitudinal Section Yes
Compatibility Report for Sample DPR 2019 CG exl new.xls
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Minor loss of fidelity # of occurrences
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned. 28
'9.Pavement design'!C51:L51
'9.Pavement design'!L52:L57
'9.Pavement design'!C61:F61
'9.Pavement design'!C65:G65
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned. 267 Defined Names
Earlier versions of Excel do not support color formatting in header and footer text. The color formatting information will be displayed as plain text in earlier versions of Excel. 1
Compatibility Report for Sample DPR 2019 CG exl new.xls
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Minor loss of fidelity # of occurrences
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned. 28
'9.Pavement design'!C51:L51
'9.Pavement design'!L52:L57
'9.Pavement design'!C61:F61
'9.Pavement design'!C65:G65
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned. 267 Defined Names
Earlier versions of Excel do not support color formatting in header and footer text. The color formatting information will be displayed as plain text in earlier versions of Excel. 1
Community Consultation Checklist – Engineering
Question Yes No N/a
1. Are there any flood prone areas on the road? No
1.1 Are locations specified and inspected?
1.2. Is high flood level specified for each stretch?
1.3 Are locations specified and inspected?
2. Are there any locations on the road where irrigations ducts need to be provided? No
2.1 Are locations specified and inspected?
3. Can the road be used as a shortcut by through traffic? No
4. Does the road lead to any quarries, mining areas, brick kilns, logging areas, tourist attractions etc.? No
5. Are there plans to build new schools, hospitals, temples etc No
6. Is there potential for double connectivity? No
If yes on any of 3-6:
6.1 Is information on location, size and nature of additional traffic generators and specific routes obtained?
7. Is there a need for deviations from existing track? No
7.1 Were the proposals for deviation shown on site and explained to the community?
7.2 Is the land availability checked?
7.3 If there is a need for donation, were the owners consulted regarding their agreement to donate the land? No
8. Is there a need for speed breakers? Yes
8.1 Is location and rational for speed breakers identified? Yes
8.2 Is rationale verified and checked on site? Yes
8.3 Are alternative or additional locations discussed? Yes
9. Are all existing intersections checked with the community on site? Yes
9.1 Is the use of intersecting roads identified (e.g. school children, farm machinery, etc)?
10. Are proposed culvert locations verified with the community? Yes
10.1 Is there a need for additional culverts? Yes
10.2 If yes, are locations identified? Yes
11.1 If yes, are locations identified?
For DPR consultant For PIU For PIC
PCC M-15 0.30 m 600 mm dia NP3 pipe
600 mm dia NP-3 pipe 0.80 m 1.90m 0.80 m 1.90 m
25 cm th Ist class bedding
PRADHAN MANTRI GRAM SADAK YOUJNA
1.25 m 5.20 m 1.25 m PROJECT IMPLITATION UNIT PMGSY CHATTISGARG GOVT.
Block :- Thakatpur Dist. :- Bilaspur
PLAN Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
Construction of 600 mm dia HPC
S.NO. Chain age in Km Pipe Culvert with Dia & no of Rows Slab Culvert with Span in Mt Box Culvert with cell size in Mt Vented Causeway with pipe dia and no. of Rows Flush Causeway Minor Bridge with Span Arrangement in MTs Status of Retaining wall if any ( type ie CC / Brick ) and height in MTs. Type of Culvert Condition S. No. Chainage Descripction Type Condition Row of vcw pipe
HPC Detail 2 389 1x600 mm 0 0 0
11 3632 2Rx1200 mm 13 4517 1x600 mm 0 0 Canal Culvert
12 3758 1x600 mm 14 4795 #REF! 0 0 D/SFace wall damage
13 4517 1x600 mm 15 5183 1x600 mm 0 0 Replace by 1x1000 mm dia HPC
15 5183 1x600 mm 17 5923 1x600 mm 0 0 Replace by 1x1000 mm dia HPC
16 5552 1x600 mm 18 6261 1x600 mm 0 0 D/S bed protection required
17 5923 1x600 mm 19 6395 1x600 mm 0 0 D/SFace wall damage
21 7280 #REF! 23 7955 1x600 mm 0 0 Replace by 2x1000 mm dia HPC
22 7473 #REF! 24 8026 1x1.00 m 0 0 Face wall damage
28 9515 0 30 10156 #REF! 0 0 D/S protection wall required
31 10224 #REF! 33 11008 0 0 0 D/SFace wall damage
37 0 0 0 0 D/S protection wall required
41 0 0 0 0 Replace by 1x1000 mm dia HPC
Proposed New cd culvert
S. No. Chainage Descripction Type Condition
1 66 HPC HPC Replace
2 786 HPC HPC Replace
3 1100 HPC HPC Replace
HPC 1x1000 mm dia HPC 1x1000 mm dia HPC
Slab culvert 1 x 2.00 m 1 x 2.00 m
Slab culvert 1 x 2.00 m 1 x 2.00 m
Slab culvert 1 x 1.50 m 1 x 1.50 m
#REF! #REF! #REF!
Slab culvert 1 x 6.00 m 1 x 6.00 m
HPC 1x1000 mm 1x1000 mm
HPC 1x1000 mm 1x1000 mm
#REF! #REF! #REF!
HPC 1x1000 mm dia HPC 1x1000 mm dia HPC
HPC 1x1000 mm 1x1000 mm
HPC 1x1000 mm 1x1000 mm
HPC 1x1000 mm 1x1000 mm
HPC 1x1000 mm 1x1000 mm
Slab culvert 1 x 2.00 m 1 x 2.00 m
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Slab culvert 2 x 6.00 m 2 x 6.00 m
Slab culvert 2 x 6.00 m 2 x 6.00 m
HPC 1x1000 mm 1x1000 mm
Slab culvert 1 x 2.00 m 1 x 2.00 m
S.NO. RD Type of Structure RAMP
S.NO. Type of Structure Chainage
1 200 NP2 Pipes 300 mm dia 15.00 m 1 NP3 Pipes 600 mm dia 10.00 m 450
2 400 NP2 Pipes 300 mm dia 15.00 m 2 NP3 Pipes 600 mm dia 10.00 m 1150
3 600 NP2 Pipes 300 mm dia 15.00 m 3 NP3 Pipes 600 mm dia 10.00 m 2360
4 800 NP2 Pipes 300 mm dia 15.00 m
5 1000 NP2 Pipes 300 mm dia 15.00 m
6 1200 NP2 Pipes 300 mm dia 15.00 m
7 1400 NP2 Pipes 300 mm dia 15.00 m
8 1600 NP2 Pipes 300 mm dia 15.00 m Total 3
9 1800 NP2 Pipes 300 mm dia 15.00 m
10 2000 NP2 Pipes 300 mm dia 15.00 m
11 2200 NP2 Pipes 300 mm dia 15.00 m
12 2400 NP2 Pipes 300 mm dia 15.00 m
13 2600 NP2 Pipes 300 mm dia 15.00 m
14 2800 NP2 Pipes 300 mm dia 15.00 m
15 3000 NP2 Pipes 300 mm dia 15.00 m
Wheel Guard on VCW
3 x 1000mm Vented Causeway
3 x 1000mm Vented Causeway
12 x 1000mm Vented Causeway
3.6 List of TBM
S. No. TBM No Chainage Location RL Remark
Left Object Right Object
Total:- 0 1 TBM -1 407603.703,2604801.959 TBMCULL14 531.023 TBMCULL14
3 TBM -3 407674.626,2598673.715 CULLTBMD2 502.016 CULLTBMD2
S.NO. Ch. Type of Structure 5 TBM -4 407181.486,2600497.387 CULLTBMD4 502.451 CULLTBMD4
6 TBM -5 407308.02,2604812.168 CULLTBMD15 523.112 CULLTBMD15
1 4565 NP3 Pipes 600 mm dia 10.00 m 7 TBM -6 407104.984,2604799.047 CULLTBM16 522.512 CULLTBM16
15 TBM -14 407308.02,2604812.168 CULLTBMD15 523.112 CULLTBMD15
18 TBM -17 406651.104,2601127.989 CULLTBMD5 506.249 CULLTBMD5
19 TBM -17 A 406477.249,2601393.141 CULLTBMD6 508.135 CULLTBMD6
Total No. 2 20 TBM -18 406468.178,2601443.328 CULLTBM57 510.523 CULLTBM57
21 TBM -19 406476.545,2601580.628 CULLTBMD8 509.601 CULLTBMD8
Rajpur Sidhbaba road CH Rajpur Sidhbaba road
Start Point 0 Start Point
Proposed 3.75m Existing
Earthan/ Moorum
Bijaghora Pahuch marg Bijaghora Pahuch marg
NAME OF ROAD :-
Existing Struture Details
VILLAGE :- Bijaghora Pahuch marg
2.1 Km End Chainage
CD32 10362 M #REF!
CD31 10224 M #REF!
Existing Slab Culvert
CD30 10156 M #REF!
Existing Slab culvert - Canal culvert
CD23 7955 M 1x600 mm
CD22 7473 M #REF!
CD21 7280 M #REF!
CD20 6504 M #REF!
CD19 6395 M 1x600 mm
CD18 6261 M 1x600 mm
CD17 5923 M 1x600 mm
CD16 5552 M 1x600 mm
CD15 5183 M 1x600 mm
CD14 4795 M #REF!
CD13 4517 M 1x600 mm
CD12 3758 M 1x600 mm
CD11 3632 M 2Rx1200 mm
CD10 3478 M 6Rx600 mm
CD9 3082 M 1x600 mm
CD8 2364 M 1Rx600 mm
CD7 1689 M 1x600 mm
CD6 1582 M 4Rx1000 mm
CD5 894 M 1x600 mm
CD4 845 M 1x600 mm
CD3 760 M 1x600 mm
CD2 389 M 1x600 mm
CD1 66 M 1x600 mm
Starting Point 0.0 m
Rajpur Sidhbaba road
NAME OF ROAD :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
DISTRICT :- Bilaspur
BLOCK :- Thakatpur
LENGTH :- 2.13 km
Proposed Struture Details
VILLAGE :- Bijaghora Pahuch marg
2.130 Km End Chainage
Slab culvert 1 x 2.00 m
Slab culvert 2 x 6.00 m
Slab culvert 2 x 6.00 m
Slab culvert 1 x 2.00 m
HPC 1x1000 mm dia HPC
Slab culvert 1 x 6.00 m
Slab culvert 1 x 1.50 m
Slab culvert 1 x 2.00 m
Slab culvert 1 x 2.00 m
HPC 1x1000 mm dia HPC
Starting Point 0.0 m
Rajpur Sidhbaba road
This is to be certified that , the proposed road Rajpur Sidhbaba road To Bijaghora Pahuch marg
of Kota block of Dist. Bilaspur , is the part of core network having Road no. in core
network is The proposed road is new connectivity road , having length of
EXECUTIVE ENGINEER
C. List of figures
S.No. Details Page No.
1 Figure-1 :- Road Map of India and state
2 Figure-2 :- District Map
3 Figure-3 :- Block Maps showing all existing connectivity like District/block HQ, new townships, National and State highway network, mandis, hospitals, colleges, schools etc.
4 Figure-4 :- Strip plan showing land and alignment details
5 Figure -5 :- Quarry Map
S,No. Details Page No.
1 Annexure-1 :- Details of soil tests (Section 4.2)
2 Annexure-2 :- Detailed hydraulic calculation of all replaced and proposed new culverts (Section 6.7)
3 Annexure-3 :- Chainages-wise Cut/fill volume
4 Annexure-4 :- Transect walk report
Design of pucca drain
Name of Road :- Rajpur Sidhbaba road To Bijaghora Pahuch marg
As per SP-20 Page no.113,115 and 117
These data may be adopted for design of rural road drains
width at bottom= 300 mm
Maximum Discharge= 0.50 cum/sec
Shape:- Trapezoidal
minimum Longitudinal slope-: 0.5 per sent = 0.005
Side slope not exceeding 1 in 4
Velocity= Not exceeding 6.0m/sec
For open channel drain
Q= A*V < 0.50 cum/sec
Where V= (1/n) R2/3 S1/2 < 6.0 m/sec
Q= Discharge in cum/sec
V=Mean Velocity in m/sec
n= manning's roughness coefficient = 0.014
R= Hydraulic radius in m' which'is area of flow cross section divided by wetted perimeter
S= Energy slope of channel = 1/ 96 0.0104
A= Area of flow cross section in sqm = 0.27 m2
Adopted Section- As per SP-20 page no 113
V= 2.23 < 6.0 m/sec OK
Consultant Asst. Engineer 0
Anand Vibhor 0 0
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.11 MB
5423138219147850775_153496_1278507194557121433_80616_Guidelines to Bidders.pdf
NIT • 0.13 MB
1163037169483644615_199805_Tender Document MMGSVY NIT 1198.pdf
NIT • 1.35 MB
7155446953941475093_199805_CG-MM-BSP-18 2 Road Combine.xlsx
BOQ • 11.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .