Tender ID
Tender Value
₹56.1 L
EMD Value
₹56,000
Closing Date
26 Feb 2026, 6:00 pmClosed
Executive Engineer, N. P. Mechanical Division, Ekta Nagar
Installation, Testing, Commissioning and Maintenance of Non-Clog Submersible Pumps of Various Capacities for Dewatering of Stilling Basin at Sardar Sarovar Dam for the year 2026, Ekta Nagar.
278070
23 of 2025-26
Open
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Works
Narmada
19 documents required · 14 mandatory · 5 optional
₹2,832
Yes
Executive Engineer, N.P.Mechanical Division, Kevadia Colony (Ekta Nagar)
₹56,000
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Name of work : Installation, Testing, Commissioning and Maintenance of Non-
Clog Submersible Pumps of Various Capacities for Dewatering of Stilling Basin
at Sardar Sarovar Dam for the year 2026, Ekta Nagar.
Item Description of Item (with brief
No specification and reference to book Qty Unit Unit Rate Amount
of specifications)
Supply of M.S. Specials Flange, Bend,
Tee, Nut, Bolt Etc.
Providing and erecting cable end
termination kit heat shrinkable for 1.00 Nos.
11KV XLPE cable 3 Core 185 Sqmm
Providing and erecting cable end
termination kit heat shrinkable for 1.00 Nos.
11KV XLPE cable 3 Core 185 Sqmm
Solder less crimping type Aluminium
lugs conforming to IS suitable for cable
of following size evenly crimped with 6.00 Nos.
4 high pressure tool & connected to 80.00
switchgear terminals with
brass/cadmium plated nut bolts in an
approved manner.
Hiring of JCB including driver & diesel
Hour Hiring of Hydra / Crane with 90.00 Days
Driver (8 working Hours in Day) Hiring
Supply of PVC Heavy duty Grey colour 500.00 Mtr.
Hose pipe 150mm with both side flange.
Supply of PVC Heavy duty Grey colour 100.00 Mtr.
Hose pipe 50mm with both side flange.
Installation, testing and commissioning
8 of all supplied electrical & mechanical 1.00 Job 16,62,500.00
items for the dewatering system.
Dismantling of existing Electrical-
Mechanical equipments, accessories
etc. covering with plastic & 1.00 Job
transportation & stacking as per the
Instruction given by Engineer In-
Comprehensive Operation & Maintance
of pumping comprising of plant
machineries and Electrical equipments
installed at site by Engineering
necessary operators, Electrical
Wireman, Helpers, Chokidar etc. as per
requirement with providing & utilizing
necessary lubricants, tool kit and all 6.00 Months
other running consumables as well as
routine plant and emergency break
down maintenance and all minor
preventive repairs to all installed plant
machineries/equipments and
preparation of maintenance and
preservation record for pumping
machinery utilization, energy
consumption qty. of water pumped etc.
and submitted to office in prescribed
proforma including stationary
materials as per instruction of
Engineer-in-Charge.
Total amount in Rs. (Excl. GST) 56,05,069.30/-
Total amount in Rs. (Excl. GST) 56,05,069.30/-
In Words: Rupees Fifty Six Lakh Five Thousand Sixty Nine and Thirty Paise Only
Divisional Accountant Executive Engineer
N.P. Mechanical Division N.P. Mechanical Division
Ekta Nagar Ekta Nagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule-B.pdf
SBD of Dewatering of SB.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .