Tender Value
₹7.7 Cr
EMD Value
₹7.7 L
Closing Date
24 Aug 2026, 6:00 pm
Executive Engineer Unit-1 kherva
Construction of HDPE Pipelines network for supplying water to various village ponds from Modhera-Motidau S.S.Spreading canal Pipeline.
327344
09/2026-2027
Open
Civil Works - Lift Irrigation Schemes
Works
Mehsana
19 documents required · 19 mandatory
₹14,160
Executive Engineer, Unit 1(GWM), Kherva, Mehsana
₹7.7 L
24 Jul 2026
24 Jul 2026
24 Jul 2026
24 Aug 2026
24 Jul 2026
2. SUMMARY SCHEDULE
3. PAYMENT SCHEDULE
3.1 PREAMBLE TO PAYMENT SCHEDULE ___________________________________
1. The bidder shall quote his firm and fixed lump sum price for the entire work under this contract,
as defined in detail in various sections of this bid document. However, increase or decrease in
quantity of certain items mentioned under Payment Schedule will be paid or recovered on pro-
rata basis as per Point 6 of this section.
2. It will be entirely at the discretion of the Employer to either accept or reject the bidder’s design
proposal, without giving any reasons whatsoever and the bidder shall not be permitted to
withdraw his bid on this account.
execution, any variation in the quantities under these items mentioned below which unit is other
than lumpsum (LS), shall be paid / recovered based on actual quantity executed on site. The
bidder shall verify other principal items at his end independently and assess the same if required.
d) Sluice Valves
e) RCC Chamber for Valve
f) Pipe Pushing for Highway crossing
g) Air Vent Kundi
i) Railway Bend
k) Road sign Board
l) Crop compensation etc.
4. The details of deviation from technical specifications and conditions of contract are to be
furnished in separate Volume. Financial implications against each item mentioned is to be quoted
in Volume. Only cost of admissible/ acceptable deviations from technical specifications and
conditions of contract will be considered for final price evaluation and will be added/ subtracted
in the price bid amount for evaluation purpose.
5. The work includes necessary liaison, co-ordination for execution of work with the concerned
local bodies, affected people and authorities (including obtaining permissions, applying for
power supply connection etc.) on behalf of the department and it shall be the scope of the
contractor. The cost of such work shall be deemed to be included in the relevant item of Price
6. Land cost for pumping Station to be borne by the department as per Government rules and
regulation. Land cost for getting ROU for laying pipeline shall be paid by the department as per
government rules and regulation. All other charges for crop compensation including cost of
manholes, kundies etc. shall be paid by contractor. The cost of same shall deem to be included in
respective item. All other charges for crop compensation, damage to the properties, insurance,
NOC & other miscellaneous charges are to be paid by the contractor for the entire period of the
contract. The bidder is instructed to refer the tender conditions / documents and quote the price
7. All the statutory charges & other charges such as fees, insurance, damage, NOC etc. for laying
of pipeline below railway, NH, SH and all other roads and other crossings are to be paid by the
contractor. However, if the concerned department insists to pay such statutory charges through
the department / owner, such charges shall be paid by the department / owner and such amount
shall be adjusted /recovered from the contractor’s bills. If any deposit which is reimbursable only
after construction period and completion of Operation and Maintenance of 05 years shall be paid
by the department. The bidder is instructed to refer the tender conditions / documents and quote
the price accordingly.
8. The bidder is instructed to refer tender provision for disposal of the excavated stuff and for royalty
charges and quote the price accordingly.
9. Payment Schedule gives the basis of interim payment for design, procurement, and construction
of all the mentioned works.
10. The bidder shall be deemed to have allowed in his price for provision, maintenance, and final
removal of all temporary works of whatsoever nature required for construction including
temporary bunds, diverting water, pumping, dewatering etc. for the proper execution of works.
The rates shall also be deemed to be included any work and setting out that may be required to
be carried out for laying out of all the works involved.
11. Grand total prices shall be entered in figures and in words. Where, there is a discrepancy between
11. Grand total prices shall be entered in figures and in words. Where, there is a discrepancy between
figure in numbers and the amount entered in words, the later shall govern.
specifications, indicative drawings and other sections of these bid documents and these
documents are to be taken as mutually explanatory of one another.
13. Prices quoted by the bidder shall be fixed for the entire period of contract, except the variation in
taxes and Price variation clauses specified in the tender documents.
14. The prices quoted shall also include the cost of materials to be utilized for testing at various
15. The bidder should acquaint himself with the site condition, including the access to worksite. The
successful bidder shall have to make suitable access to worksites at his own cost. These accesses
will also be used by the other contractors working for the department and shall not be liable for
any compensation.
16. The contractor is requested to refer the reference Clause 45 of Volume I - Standard Bid
documents (SBD) regarding GST and other taxes.
17. The Contractor has to collect & dispose of Hard rock met during execution of entire work. The
payment of the same shall be recovered from him at Rs 211.00 per m3 (rate of GWRDC SOR,
2023-24, ch-1 it- 34) for the hard rock. The Royalty charges if any shall have to be paid by
18. One (1) Percent of value of work will be deducted from each bill towards labour welfare cess as
applicable as per Standard Bid documents in Volume – I. All testing charges shall be borne by
19. Payment Schedule for interim payment is furnished in this volume.
2. SUMMARY SCHEDULE
Name of work: Construction of HDPE Pipelines network for supplying water to various village ponds from
Modhera - Motidau S.S. Spreading canal pipeline.
Description Quantity Unit Amount
1 ITEM NO-1 Excavation of pipeline trenches/
foundation trenches in the strata shown below
including depositing the excavated stuff as and
where directed up to lead of 50 Mts. and 6.0 Mt
lift of excavation below average G.L. including
refilling, cleaning the site with thin jungle
cutting but excluding dewatering if any. (A)
Excavation in all sorts of soil.
(A) Excavation in all sorts of soil.
2 ITEM NO-2 Providing and supplying, 5170.00 Rmt 2668.42
lowering in standard length ISI mark high
density polyethylene H.D.P.E. pipes suitable
for portable water as per IS specification no
4984/1995 including all local and central taxes,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to the site, lowering and laying
with specials etc complete. (a) 10.00 kg/cm2
3 ITEM NO-3 Providing and supplying, 7680.00 Rmt 1777.60
lowering in standard length ISI mark high
density polyethylene H.D.P.E. pipes suitable
for portable water as per IS specification no
4984/1995 including all local and central taxes,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to the site, lowering and laying
with specials etc complete. (a) 6.00 kg/cm2
4 ITEM NO-4 Providing and supplying, 10383.00 Rmt 2323.00
lowering in standard length ISI mark high
density polyethylene H.D.P.E. pipes suitable
for portable water as per IS specification no
4984/1995 including all local and central taxes,
transportation, freight charges, octroi,
inspection charges, loading , unloading,
conveyance to the site, lowering and laying
with specials etc complete. (a) 6.00 kg/cm2
5 ITEM NO-5 Providing and jointing MS pipe of 120.00 Rmt 5317.65
required length with MS Flange of following
SUMMARY SCHEDULE
dia by necessary cutting and welding works and
laying the same in excavated trench of rising
main. Suction/delivery of pump motor after
laying the flanged pipes joint with necessary nut
bolt of required size by using rubber packing of
required thickness after fitting MS pipe paint
with anticorrosive paint etc. complete 300 MM
Dia 7.1 mm thick
6 ITEM NO-6 Providing, Supplying and Fixing 26.00 No 21525.00
I S I mark CI D/F sluice valve as per IS:14846
(Latest Edition) of following class & diameter
including all taxes, insurance, transportation,
freight charges, octroi, inspection charges,
loading, unloading, conveyances to
departmental store, stacking etc. complete.
Sluice valve 300 mm dia (PN-1, With Hand
Wheel/Cap Operated-PD Type Short Body)
7 ITEM NO-7 Drilling of 600 mm dia dia 264.00 Rmt 11604.15
Horizontal borehole for watermain pipeline
crossing under the road incl. in all strata with
required length incl. fixing of 500 mm dia
M.S./RCC casing pipe with pushing etc.
complete various size of pipe for 273.1 to
8 ITEM NO-8 Providing and constructing scour 18.00 No 38830.00
valve chamber for 280 mm dia pipeline
including excavation, refilling and site
clearance; providing and laying PCC in 1:4:8
and RCC 1:2:4 with centering and shuttering
including TMT reinforcement Fe-500, brick
masonry in C.M. 1:6 for chamber walls with
mm thick cement plaster in C.M. 1:3 and
providing and fixing M.S. cover fabricated
from 35×35×5 mm M.S. angle and 3 mm thick
M.S. plate with red oxide and two coats anti-
corrosive paint, including all materials, labour,
leads and lifts complete as per drawing and
direction of Engineer-in-Charge.
9 ITEM NO-9 Providing and constructing scour 8.00 No 38731.00
valve chamber for 315 mm dia pipeline
including excavation, refilling and site
clearance; providing and laying PCC in 1:4:8
and RCC 1:2:4 with centering and shuttering
including TMT reinforcement Fe-500, brick
masonry in C.M. 1:6 for chamber walls with
mm thick cement plaster in C.M. 1:3 and
providing and fixing M.S. cover fabricated
from 35×35×5 mm M.S. angle and 3 mm thick
M.S. plate with red oxide and two coats anti-
corrosive paint, including all materials, labour,
leads and lifts complete as per drawing and
direction of Engineer-in-Charge.
10 ITEM NO-10 Providing and constructing air 64.00 No 10167.06
vent kundi for 280 mm dia pipeline including
SUMMARY SCHEDULE
excavation of foundation trench in all kinds of
soil up to required depth including depositing
excavated earth within lead up to 50 m and lift
up to 6.0 m with refilling and site clearance;
providing and laying plain cement concrete in
C.C. 1:4:8 and C.C. 1:2:4 for foundation
including curing; providing and fixing 80 mm
dia G.I. pipe; and providing and fixing I.S.I.
mark double acting air valve 80 mm dia with
necessary fittings including testing, with all
materials, labour, leads and lifts complete as per
approved drawing and direction of Engineer-in-
11 ITEM NO-11 Providing and constructing air 52.00 No 10119.80
vent kundi for 315 mm dia pipeline including
excavation of foundation trench in all kinds of
soil up to required depth including depositing
excavated earth within lead up to 50 m and lift
up to 6.0 m with refilling and site clearance;
providing and laying plain cement concrete in
C.C. 1:4:8 and C.C. 1:2:4 for foundation
including curing; providing and fixing 80 mm
dia G.I. pipe; and providing and fixing I.S.I.
mark double acting air valve 80 mm dia with
necessary fittings including testing, with all
materials, labour, leads and lifts complete as per
approved drawing and direction of Engineer-in-
12 ITEM NO-12 Providing and constructing tail 14.00 No 181784.64
kundi for 280 mm dia pipeline including
excavation of foundation trench in all kinds of
soil up to required depth including depositing
excavated earth within lead up to 50 m and lift
up to 6.0 m with refilling and site clearance;
providing and laying plain cement concrete in
C.C. 1:4:8 and C.C. 1:2:4 for foundation
including curing; providing brick masonry with
conventional bricks in C.M. 1:6 for foundation
and walls including scaffolding and raking of
joints; providing cement plaster in C.M. 1:3
including finishing with floating coat of neat
cement slurry and curing; and providing cement
sand vata 10 cm × 10 cm quarter round in C.M.
1:1 with neat cement finishing, including all
materials, labour, leads and lifts complete as per
approved drawing and direction of Engineer-in-
13 ITEM NO-13 Providing and constructing tail 5.00 No 181690.54
kundi for 315 mm dia pipeline including
excavation of foundation trench in all kinds of
soil up to required depth including depositing
excavated earth within lead up to 50 m and lift
up to 6.0 m with refilling and site clearance;
providing and laying plain cement concrete in
SUMMARY SCHEDULE
C.C. 1:4:8 and C.C. 1:2:4 for foundation
including curing; providing brick masonry with
conventional bricks in C.M. 1:6 for foundation
and walls including scaffolding and raking of
joints; providing cement plaster in C.M. 1:3
including finishing with floating coat of neat
cement slurry and curing; and providing cement
sand vata 10 cm × 10 cm quarter round in C.M.
1:1 with neat cement finishing, including all
materials, labour, leads and lifts complete as per
approved drawing and direction of Engineer-in-
14 ITEM NO-14 Supplying & fixing portion 20.00 No 15292.41
submerged arc welded MS Railway bend
outside coated with best quality bituminous
paint having bewailed and plates or coil
confirming to ISI 3589/2001 or its latest
revision /ammendment for following thickness.
15 ITEM NO-15 Providing videography on 1.00 per 2222.00
occasion of function or for ongoing day
construction work including dubbing, titling
etc. complete including cost of cassette/CD.
16 ITEM NO-16 Supplying & Fixing Road Sign 23.22 Sqmt 2410.87
Board of MS Plate & Angel Iron Incl Painting
Lettering Etc. Comp. Incl. Fixing in CC (1:4:8)
With necessary Excavation Etc. Comp As per
IRC Type Design (Non-Reflective Type)
17 ItemNo.17 Cutting of existing M.S. Pipe and 10.00 Job 22180.61
fixing of 300 mm MS pipe with required Work
Generator machine, welding machine, Gas
cutter, labour and all material etc. complete.
18 ITEM NO-18 Crop Compensation 229690.00 Sqmt 15.15
I/ We am/ are willing to carry out the work at ______ % above/ below percent (Should be written in figures and
words) of the estimated rate mentioned above. Amount of my/ our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct ______ % below Add ______ % Above
Executive Engineer
Seal & Signature of Contractor Kherva
SUMMARY SCHEDULE
3. PAYMENT SCHEDULE
Terms of Payment for all Works – Payment Schedule
3.1 PREAMBLE TO PAYMENT SCHEDULE
Representative shall assess the value of each component as indicated in paragraph 4 herein
2. Percentages are indicated against each component of each item of Civil works specified in
related to the total costs of the concerned item as whole. A head titled (any other item(s)) is
included in each breakdown of schedule. The tenderer shall at the time of tendering indicate
any addition items which he considers necessary but cannot be covered by any of the heads
indicated in the breakup.
3. The percentage breakup as indicated in the Schedule may differ from that corresponding to
the tenderer’s scheme and design and he should take this into account while quoting his prices
4. The contractor shall after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities for all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used
for assessment of percentage progress of the component at any stage. Measurement shall be
jointly taken by the Employer's Representative and the Contractor, mutually agreed and
entered in the measurement books in the form and by the method approved by the Employer's
Representative and signed jointly by both the parties.
PAYMENT SCHEDULE
3.2 PAYMENT SCHEDULE
Percentage Payment to be
Item released of respective item
Description of Item
Excavation for pipeline trenches in all strata 60%
Refilling of Trenches. 40%
2 H.D.P.E Pipe (All Dia)
Manufacture & inspection completed at factory/ Plant & certificate
issued by TPI or approving authority and Supply of pipe & 60%
transportation to work site etc.
Excavation for pipeline trenches in all strata’s including bedding
Lowering, laying, jointing including all Field testing etc. Complete 20%
Refilling of Trenches. 10%
On Satisfactory trial run & commissioning including Hydro-
3 MS PIPE (All Dia)
Manufacture & Supply of Spirally Arc welded M.S. pipes with
necessary shop testing - On completion of Inside and Outside
Coating of pipeline transportation to work site etc. (Except inside 60%
& outside coating for length of maximum 15 cm on both end of
Excavation for pipeline trenches in all strata including bedding etc. 5%
Lowering, laying, jointing including all Field testing and
Ultrasonic test.
Refilling of Trenches. 10%
On Satisfactory completion of “C” value testing. 2%
On Satisfactory trial run & commissioning including Hydro-
4 SLUICE VALVE (All Dia)
On receipt of material at work site in good condition 65%
On erection of valves 30%
On hydraulic testing and satisfactory trial run & commissioning. 5%
The payment shall be made on successful completion of the said
work as per drawing.
On commissioning of system & NOC from respective authority 10%
6 SCOUR VALVE CHAMBER (All Dia)
The payment shall be made on successful completion of the said 90%
PAYMENT SCHEDULE
work as per drawing.
On satisfactory trial run & commissioning 10%
7 AIR VENT KUNDI -AIR VALVE (All Dia)
On receipt of material at work site in good condition 50%
On erection of valves and the payment shall be made on successful
completion of the said work as per drawing.
On hydraulic testing and satisfactory trial run & commissioning. 5%
8 TAIL KUNDI (All Dia)
The payment shall be made on successful completion of the said
work as per drawing.
On satisfactory trial run & commissioning 10%
On receipt of material at work site in good condition 65%
On erection of Bend 30%
On hydraulic testing and satisfactory trial run & commissioning. 5%
The payment shall be made on successful completion of the said
work as per instruction.
11 ROAD SIGN BOARD
On receipt of material at work site in good condition 70%
On erection of Board 30%
12 CUTTING MS PIPE
The payment shall be made on successful completion of the said
work as per drawing & instruction.
On satisfactory trial run & commissioning 10%
13 CROP COMPANSATION
The payment shall be made on successful completion of the said
work as per instruction.
On commissioning of system & NOC from respective authority 40%
PAYMENT SCHEDULE
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Vol 1 SBD_MMPL.pdf
DWG_3.1_1To9.pdf
R03 MMPL Price Bid With Price.pdf
TENDER NOTICE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].