Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.7 LAccepted-AOC 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | L1 | Accepted-AOC REASONABLE QUOTE | |
| 2 | L2₹49.6 L+₹3.9 L (8.59%)Rejected-Finance | L2 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹78,000
Closing Date
18 Nov 2020, 6:00 pmClosed
GE Jorhat
GE JORHAT,POST-ROWRIAH, JORHAT-785005, ASSAM
OUTSOURCING OF SERVICES FOR MANNING AND OPERATION OF WATER SUPPLY INSTALLATIONS AT ROWRIAH SARAIBARI AND LICHUBARI UNDER GE JORHAT
2020_MES_390602_1
8987/B/E8
Open Tender
Miscellaneous Services
Lump-sum
330 days
Jorhat
As per NIT
9 documents required · 9 mandatory
₹500
GE Jorhat
₹78,000
Yes
29 May 2021
28 Oct 2020
19 Nov 2020
28 Oct 2020
18 Nov 2020
30 Oct 2020
Amount
Outsourcing of services for manning and operation of water supply installations at Rowriah, Saraibari and Lichubari as listed in Schedule-A and to perform such services and execute such works upon the terms and condition contained or referred to in the tender documents and upon the conditions hereinafter contained as may be demanded duly covering for superintendence, overheads and profit, during the period of 11 month after the date of acceptance of tender as per Work Order No.1.
NOTES:- (a) Pre-priced rates inserted by the department are deemed to be at par with the Minimum Fair Wages circulated by Chief Labour Commissioner(Central) vide letter No.1/20(3)/ 2020-LS-II Dated 12 October 2020 applicable for 'C' Area. The lumpsum price shall be worked out by the bidder independently for works as listed in Schedule-A and as specified in Tender Documents and insert amount under Column 6 to cover all. (b) The Bidder's/Contractor's is to quote lump sum amount under Column 6 for works as listed in Schedule-A covering all the aspects mentioned in the tender documents including all taxes , overheads and profit but excluding for EPF,ESIC, LWC and Bonus which shall be quoted under respective Serial Item Nos in this BOQ, representing (%) percentage Above/Below (+or - denomination) the Lump Sum inserted by MES under Column 5 and which shall be worked out based on the difference of amount under Column 6. (c) The representing (%) percentage Above/Below (+or - denomination) the Lump Sum inserted by MES under Column 5 in case of EPF, ESIC and Bonus shall be worked out based on the difference of amount quoted by the bidder under the respective Serial Item Nos in this BOQ. (d) The representing (%) percentage Above/Below (+or - denomination) the Lump Sum worked out by the Bidder/Contractor under Column 6 in case of LWC shall be worked out based on the difference of amount quoted by the bidder under the respective Serial Item Nos in this BOQ. (e) Contribution towards Bonus, Contribution towards EPF and Contribution towards ESIC shall be payable only after submission of valid and authentic document in support of proof of payment by the Contractor.
Note:- Applicable for BOQ Serial Item No. 2 to 5 These Items are not pre priced by MES and the pre priced rate indicated as Rs.0.00 under Column 5 signifies this fact only.
Amount towards EPF (Employer's Contribution) on Serial Item No.1 Here in Before Note:- The representing (%) percentage wrt the Lump Sum inserted by MES under Column 5 shall be worked out based on the difference of amount quoted by the bidder against this item.
Amount towards ESIC (Employer's Contribution) on Serial Item No.1 Here in Before Note:- The representing (%) percentage wrt the Lump Sum inserted by MES under Column 5 shall be worked out based on the difference of amount quoted by the bidder against this item.
Amount towards Bonus on Serial Item No.1 Here in Before Note:- The representing (%) percentage wrt the Lump Sum inserted by MES under Column 5 shall be worked out based on the difference of amount quoted by the bidder against this item.
Amount towards LWC on Serial Item No.1 plus 2, 3 and 4 Here in Before Note:- The representing (%) percentage wrt the Lump Sum quoted by the bidder against Serial Item No.1 plus 2,3 and 4 Here in Before shall be worked out based on the difference of amount quoted by the bidder against this item.
TANKESWAR BORA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .