Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹0.13Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹10.7 LAdmitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S MD INFRACON BUILDERS L3 | FAYAZ AHMAD L6 | QAISAR MOHAMMAD SOFI L1 | MIR BUILDERS L2 | SHEIKH CONSTRUCTIONS L4 | A M CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) | |||||||||
| 1.10 | Dry | 14,311.43 | Cum | 111 ₹15,88,568.73 | 90 ₹12,88,028.7 | 70 ₹10,01,800.1 | 111 ₹15,88,568.73 | 30 ₹4,29,342.9 Lowest | 50.99 ₹7,29,739.82 |
| 1.20 | Wet | 14,311.43 | Cum | 184.95 ₹26,46,898.98 | 100 ₹14,31,143 | 70 ₹10,01,800.1 | 184 ₹26,33,303.12 | 50 ₹7,15,571.5 Lowest | 80.11 ₹11,46,488.66 |
| 2.00 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 406.06 | Cum | 187 ₹75,931.6 | 100 ₹40,606 | 70 ₹28,424.2 | 187 ₹75,933.22 | 50 ₹20,303 Lowest | 75.8 ₹30,779.35 |
| 3.00 | Supply of GI wire crates of specified size 16' * 16', made of 4mm dia GI wire with 4"*4" mesh (100 mm * 100 mm) including proper fabrication , weaving, binding and testing from any Government-approved testing agency , confirming to relevant IS standards and including carriage by all means up to site of work, stacking, handling and all incidental charges , complete in all respects as per directions of Engineer-in-Charge. | 20,400.96 | Sft | 24 ₹4,89,623.04 | 23 ₹4,69,222.08 | 20 ₹4,08,019.2 | 24 ₹4,89,623.04 | 24 ₹4,89,623.04 | 14.58 ₹2,97,446 Lowest |
| 4.00 | Hand-packing stones in wire-crates; excluding cost of crates and stones. | 471.39 | Cum | 371 ₹1,74,886.8 | 200 ₹94,278.6 | 100 ₹47,139.3 Lowest | 371 ₹1,74,886.8 | 300 ₹1,41,417.9 | 176.52 ₹83,210.29 |
| 5.00 | Dumping stone excluding cost of stones ( in Horizontal on level). | 297.47 | Cum | 237 ₹70,501.46 | 50 ₹14,873.73 Lowest | 100 ₹29,747.45 | 237 ₹70,501.46 | 200 ₹59,494.9 | 113.71 ₹33,825.83 |
| 6.00 | Supply of Stone boulder (nallah) nominal size 225 mm | 768.83 | Cum | 699.99 ₹5,38,173.45 | 700 ₹5,38,179.6 | 440 ₹3,38,284.32 | 700 ₹5,38,179.6 | 700 ₹5,38,179.6 | 340.48 ₹2,61,770.56 Lowest |
| 7.00Carriage of different materials by Mechanical Transport including loading ,unloading and stacking from different sources upto site of work. | |||||||||
| 8.00 | Stone boulders for an average lead of 9 km fro Arch Ganderbal | 768.83 | Cum | 309 ₹2,37,569.39 | 250 ₹1,92,207 | 200 ₹1,53,765.6 | 309 ₹2,37,567.85 | 300 ₹2,30,648.4 | 156.73 ₹1,20,498.41 Lowest |
Tender Value
₹58.2 L
EMD Value
₹1.7 L
Closing Date
9 Oct 2026, 4:00 pmClosed
Executive Engineer IFCD Ganderbal
Irrigation and FC DIvision Ganderbal
Construction of Flood Protection work on left side by way of toe protection crate work and channelization/cunnitte cutting of Nallah from intake upto Gadoora Bridge from 0 to 02kms
2026_IFC_326630_1
eNIT NO 26 OF 2026-27
Open Tender
Civil Works
Item Wise
180 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Executive Engineer IFCD Ganderbal
₹1.7 L
12 Oct 2026
30 Sept 2026
10 Oct 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) | |||||
| 1.1 | Dry | 14,311.43 | Cum | 111 | ₹15,88,568.73 |
| 1.2 | Wet | 14,311.43 | Cum | 184.95 | ₹26,46,898.98 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 406.06 | Cum | 187.3 | ₹76,055.04 |
| 3 | Supply of GI wire crates of specified size 16' * 16', made of 4mm dia GI wire with 4"*4" mesh (100 mm * 100 mm) including proper fabrication , weaving, binding and testing from any Government-approved testing agency , confirming to relevant IS standards and including carriage by all means up to site of work, stacking, handling and all incidental charges , complete in all respects as per directions of Engineer-in-Charge. | 20,400.96 | Sft | 24 | ₹4,89,623.04 |
| 4 | Hand-packing stones in wire-crates; excluding cost of crates and stones. | 471.39 | Cum | 371.15 | ₹1,74,957.51 |
| 5 | Dumping stone excluding cost of stones ( in Horizontal on level). | 297.47 | Cum | 237.9 | ₹70,769.18 |
| 6 | Supply of Stone boulder (nallah) nominal size 225 mm | 768.83 | Cum | 700 | ₹5,38,179.6 |
| 7Carriage of different materials by Mechanical Transport including loading ,unloading and stacking from different sources upto site of work. | |||||
| 8 | Stone boulders for an average lead of 9 km fro Arch Ganderbal | 768.83 | Cum | 309.88 | ₹2,38,244.42 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.07 MB
BOQ_1104942.xls
BOQ • 0.29 MB
corrigendum.pdf
PDF • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .