Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.2 LAccepted-AOC | l1 | Accepted-AOC aoc | |
| 2 | l2₹4.5 L+₹39,235 (9.44%)Rejected-Finance | l2 | Rejected-Finance l1 accepted | |
| 3 | l3₹7 L+₹2.8 L (68.4%)Rejected-Finance | l3 | Rejected-Finance l1 accepted | |
| 4 | l4₹9.1 L+₹5.0 L (119.5%)Rejected-Finance FCA 560 BLB EAST CHAWLA COLONY SAURAJ SINGH YADAV BALLABGARH VILLAGE TOWN CHAWLA COLONY CITY FARIDABAD FARIDABAD HARYANA 121004 INDIA | FARIDABAD | HARYANA | 121004 | l4 | Rejected-Finance l1 accepted | |
| 5 | l5₹12.3 L+₹8.2 L (196.2%)Rejected-Finance 3 NEW TRIMURTY CO OP HOUSING SOCIETY INGOLE NAGAR WARDHA ROAD NAGPUR 440005 MAHARASTRA | NAGPUR | NAGPUR | MAHARASHTRA | 440005 | l5 | Rejected-Finance l1 accepted |
Tender Value
Refer Docs
EMD Value
₹19,100
Closing Date
1 Jul 2021, 6:00 pmClosed
CWE AF TRIVANDRUM
CWE AF TRIVANDRUM HQ SAC IAF COMPLEX AKKULAM THURUVIKKAL POST TRIVANDRUM 11
SOIL INVESTIGATION FOR THE WORKS OF OTM AND MESSES FOR RADAR UNIT AT NELLORE FOR DOMESTIC ACCN FOR RADAR UNITS AND WIDENING OF PERIMETER AND CONNECTING ROADS AT AF STN SURYALANKA
2021_MES_445284_1
CWE(AF)/TVM/SUR/82356
Open Tender
Civil Works
Lump-sum
60 days
Suryalanka
As per NIT
7 documents required · 7 mandatory
₹500
AGE I AF Suryalanka
₹19,100
Yes
27 Jul 2021
24 May 2021
3 Jul 2021
24 May 2021
1 Jul 2021
18 Jun 2021
24 May 2021 - 31 May 2021
Amount
SCHEDULE 'A'
LOCATION: SURYALANKA SOIL INVESTIGATION FOR THE WORK OF DOMESTIC ACCOMODATION FOR RADAR UNITS AT AF STATION SURYALANAKA
(i) Mobilisation and demobilization of men and materials to site, Shifting from one point to another for commencement of work as required/directed by Engr-in-Charge. (ii) Soil Investigation (Depth upto 25m) - 5 nos: Field work by Auger/Calyx, Dia of borehole 150mm, upto 25m or 3.0m in the rock strata whichever is earlier. Conducting field investigation and laboratory tests as per IS 1892 - 1979 RA 2002 and as per specifications below :-(a) Grain size analysis, Identification & classification of soil. (b) Unit weight (bulk density), natural moisture content, liquid limit, plastic limit, shrinkage limit, plasticity index, specific gravity (c) Dry density, degree of saturation of soil (d) Differential Free Swell (%) & Swelling Pressure if expansive soil is encountered (e) Shear Parameters (C-Phi Analysis) (f) Consolidation test & permeability test (g) Chemical analysis of soil (h) Chemical analysis of ground water (water to be obtained from bottom of bore hole) (j) Depth of water table below Ground level (k) Presence of loose soil, if any and its depth (l) If weak soil with lesser N value as specified in table-1 of IS 1893 (Part -I) 2016 is encountered then evaluation of liquification potential shall be assessed and remedial actions to be adopted shall be specified. (m) Undisturbed soil samples shall be collected at 1.5 m interval and at change of strata (n) Bore hole dia shall be 150mm. Depth shall be as per directions. (o) SPT tests shall be done at 1.5 m interval (p) Crushing strength, degree of weathering (CR value) and RQD of rock Samples.
(q) As per IS-1892 clause 3.6.5.3, drilling for 3.0 m depth inside the rock is essential to ensure that boulders or layers of cemented soil are not mistaken for rock. (r) For open foudations, Calculation of Net SBC at 1.5m, 2.0m, 2.5m, 3.0m from shear as well as settlement criteria, SBC value shall be calculated based on C-Phi analysis as well as SPT value, For calulations formulae given in IS : 6403 shall be used. (s) If pile foundations are required then depth of piles shall be mentioned and pile capacity in compression, uplift & lateral loads shall be given for 300, 400, 450, 500 dia for under reamed piles & for 450, 500, 550, 600mm dia for long piles. (t) Recommendations regarding type of foundation to be adopted & Net SBC/Pile capacities to be adopted. Also recommendations shall be given regarding stability of soil and soil stabilization required, if any. (u) Bore hole positions duly marked on plan and their distance from adjacent prominent reference points. Plan size of the bldgs shall also be marked in the plan. This plan shall be signed by GE, AGE & soil consultant. (v) Bore log details shall be as per Appx 'D' of IS 1892. N values depthwise shall also be shown in bore log details. Bore log details shall be signed by GE, AGE & soil consultant. (iii) Vetting of soil investigation report by IIT/NIT
LOCATION: SURYALANKA SOIL INVESTIGATION FOR THE IMPROVEMENT AND WIDENING OF PERIMETER AND CONNECTING ROADS AT AF STN SURYALANKA
(i) Mobilisation and demobilization of men and materials to site, Shifting from one point to another.- 1 Nos (ii)CBR Test (2 nos):-Collecting samples at depth as required by engineer in charge. Performing relevant labouratory tests on the sample collection as mentioned below :- Sieve analysis, Soil Classification, Atterberg Limits, Proctor Density Test (OMC, MDD) and CBR Test (iii) Plate Load Test (K value test) (1 nos):- Setting up of equipment, Conducting Plate load test at site at depth as required by engineer incharge. It would be carried out in soil based on IS 9214-1979 and IS 1888 - 1982. (iv) Soil Investigation : (Depth upto 15m)(2 nos) :-Field work by Auger/Calyx upto 15m or 3.0m in the rock strata whichever is earlier. Conducting field investigation and laboratory tests as per IS 1892 - 1979 RA 2002 and as per specifications below :-(a) Grain size analysis, Identification & classification of soil. (b) Unit weight (bulk density), natural moisture content, liquid limit, plastic limit, shrinkage limit, plasticity index, specific gravity (c) Dry density, degree of saturation of soil (d) Differential Free Swell (%) & Swelling Pressure if expansive soil is encountered (e) Shear Parameters (C-Phi Analysis) (f) Consolidation test & permeability test (g) Chemical analysis of soil (h) Chemical analysis of ground water (water to be obtained from bottom of bore hole) (j) Depth of water table below Ground level (k) Presence of loose soil, if any and its depth (l) If weak soil with lesser N value as specified in table-1 of IS 1893 (Part -I) 2016 is encountered then evaluation of liquification potential shall be assessed and remedial actions to be adopted shall be specified.
(m) Undisturbed soil samples shall be collected at 1.5 m interval and at change of strata (n) Bore hole dia shall be 150mm. Depth shall be as per directions. (o) SPT tests shall be done at 1.5 m interval (p) Crushing strength, degree of weathering (CR value) and RQD of rock Samples. (q) As per IS-1892 clause 3.6.5.3, drilling for 3.0 m depth inside the rock is essential to ensure that boulders or layers of cemented soil are not mistaken for rock. (r) For open foudations, Calculation of Net SBC at 1.5m, 2.0m, 2.5m, 3.0m from shear as well as settlement criteria, SBC value shall be calculated based on C-Phi analysis as well as SPT value, For calulations formulae given in IS : 6403 shall be used. (s) If pile foundations are required then depth of piles shall be mentioned and pile capacity in compression, uplift & lateral loads shall be given for 300, 400, 450, 500 dia for under reamed piles & for 450, 500, 550, 600mm dia for long piles. (t) Recommendations regarding type of foundation to be adopted & Net SBC/Pile capacities to be adopted. Also recommendations shall be given regarding stability of soil and soil stabilization required, if any. (u) Bore hole positions duly marked on plan and their distance from adjacent prominent reference points. Plan size of the bldgs shall also be marked in the plan. This plan shall be signed by GE, AGE & soil consultant. (v) Bore log details shall be as per Appx 'D' of IS 1892. N values depthwise shall also be shown in bore log details. Bore log details shall be signed by GE, AGE & soil consultant .(iv) Vetting of soil investigation report by IIT/NIT
Total of Schedule 'A'
S.M. Consultants
Soigne Engineering Consultants
Shree Balaji Test House Pvt. Ltd.
M/S. BECQUEREL INDUSTRIES PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .