Tender Value
₹1.0 Cr
EMD Value
₹1 L
Closing Date
24 Sept 2026, 3:00 pm2d left
Registrar, Sardar Patel University
SITC of 88 Tr HVAC Systems at Gyanodaya Bhavan of Sardar Patel University, Vallabh Vidyanagar
338391
USIC/HVAC/25082026
Open
Air Conditioner Services
Works
Anand
₹2,400
Registrar, Sardar Patel University
₹1 L
24 Sept 2026
1 Sept 2026
28 Sept 2026
1 Sept 2026
18 Sept 2026
1 Sept 2026
BILL OF QUANTITIES- HVAC SYSTEM
The work includes supply, Installation, fabrication, erection, testing & commissioning of the complete Air
Distribution system. The tenderer shall fill in the columns of rate & amount & submit the same along with the all
technical details as per Technical Specification.
Sr. No. DESCRIPTION UNIT QTY SITC Rate SITC Amount
PART - A VRF SYSTEM
1 Supply Installation, Testing , Commissioning of VRF/VRF System
Supply ,installtion, testing & commissioning of Outdoor
machines for air conditioning system, based on variable
refrigerant flow (Inverter Scroll type) with copper condenser
coil, necessary accessories for oil separation, dust removal,
flow control, interconnecting piping, condenser air fan,
electrical and microprocessor based panel, interconnecting
cabling, all housed inside a weather-proof cabinet suitable for
exposed installation on terrace.The panel must be 100%
compatible with BMS. The unit/s must also be provided with
self addressable control system for control of indoor & other
outdoor machines The VRF outdoor unit shall be capable of
delivering 100% of its rated cooling capacity at ambient
temperature of 39°C and should work without tripping at
52°C ambient, as verified by the manufacturer’s published
performance data. The inverter scroll compressor(s) shall be
designed, developed, and manufactured by the VRF outdoor
unit OEM to ensure complete system compatibility, optimized
performance, enhanced reliability, and single-source
The outdoor unit heat exchanger shall be provided with a
factory-applied anti-corrosive black epoxy coating on the
condenser fins to provide superior protection against
corrosion in saline, coastal, industrial, and other corrosive
environments, thereby ensuring long-term durability and
sustained thermal performance throughout the equipment
life cycle. (Approved make: LG / Daikin/Voltas)
1.1 SITC of Out-door units
a 14 HP (For AHU) Nos. 8 300930
b 2 Odu Combination Kit (ahu) Nos. 4 22400
Supply, Installation, Testing , Commissioning & Balancing of
Air Handling Units
Supply, Installation, Testing & Commissioning of Double Skin
type Floor Mounted AHU/LOFT Mounted AHU/Ceiling
2.1 Suspended AHU as per approved dwg/requirement.
(PMP/Zeco/Waves/Edgetech/Hi-M Solutek)
Comprising of Following :
Frame Structure : Thermal break Extruded profile Aluminium
Panel Thickness : (43±2) mm thick
Inner Skin : 1 mm thick Plain GI Sheet
Outer Skin : 1 mm thick Pre-coated sheet
Drain Pan : 18G SS-304 Sheet Drain pan with 12 mm Nitrile
rubber insulation
Sealing Gasket : Food Grade
Fan Type : PLUG Type
Dampers : Opposed blade are foil low leakage Aluminium
anodised damper at supply ,return ,fresh air side .
Mixing Chamber with Access Door Along with Return Air (For
AHUs with Ducted Return as per technical specifications.)
Fresh Air dampers , 10 Micron flange type
Coil Section with Access Door: Along with 6 Row deep DX coil
with 12 FPI to suite TR mentioned.
Face velocity: Minimum 500 FPM
Fan section : Motor Efficiency Class Minimum IE-4
Motor shall be TEFC 50Hz, 415V, IP55 protect, foot mounted.
For VFD Motor Cable Length to be less than or equal to
meters and voltage to be 415Volts + 10% at motor terminal
Filter Frames: Should be made out of extruded aluminium
Box type section with food grade gasket arrangement around
filters frame to avoid leakages thru filter frames & it should
be washable type.
Cable Entry: Rockstage Gland Fixing Arrangement
Isolators: Rubber Block type isolators below fan structure
required to avoid vibration & direct contact of fan with AHU
structure and rubber pads for the placement of AHU with RCC
block (Minim 6 nos per AHU).
Automatic ELECTRICAL CONTROL Panel WITH VFD with
following details
Suitable rating incoming MCCB/MCB, VFD of (380-480 volt)
415 V with communication port for communication & BMS
connectivity (BACnet/Modbus).
Digital ammeter, CTs & control MCBs.
Phase indicating lights & control MCBs ( RYB)
Push buttons for manual start/stop of motor.
Indicating light for starter on/off/trip.
220/24V control transformer for 2 way motorized valve/
Expansion valve.
Interlocking terminals & wiring for fire damper, motorized
dampers etc. as per control scheme.
1. Necessary cabling work from AHU starter panel to AHU
(Average 10 rmt length) with internal unit wiring and
copper earthing of air handling unit motors from the panel
shall be included. (up to AHU starter panel power to be
provided by client /electrical vendor)
2. Noise level should be between 65-75 DBA at 1m.
3. AHU design should follow AMCA/AHRI/EN 1886 standard.
4. In case of ceiling Suspended AHU, prior approval must be
obtained from the civil contractor/client before installation.
2.1.1 Ceiling Suspended Air handling unit (CS-AHU)
COOLING LOAD (TR)
Supply, Installation, Testing , Commissioning of EEV KITS
with expansion valve for AHU unit's connected VRF / VRF
out door units ( All require accessories, Cables/ controls
consider for Hybrid units & VRF ODU to be consider) ( If
multi kit required as per TR will be included Consider as
a EEV KIT - for CS-AHU having capacity of 22.00 TR Set. 4 87800
B Installation, Testing, Commissioning & low side items
Interconnecting Copper piping between AHU & outdoor unit
a of suitable sizing. Copper piping will be duly insulated RMT 60 5570
Maxflow /RR / Mandev)
Interconnecting copper cabling between AHU & outdoor unit -
b Communication Cable (Polycab /RR / Finolex) RMT 90 517
c Condensate Drain Piping RMT 40 658
d Outdoor Stands (AHU) Nos. 8 10400
e Lifting & Shifting (AHU) Lot 1 198000
4.0 SITC of Remote control
a Corded remote controllers Nos. 4 3470
SITC of Central Controller W/o PC Monitoring Systems (BMS
Supply installation, testing and commissioning of Central
Remote Controller. System should have facilities for start,
stop, temperature setting, fan speed control, mode control,
Group control, emergency start & stop, BMS & fire alarm
system access and fault Diagnosis.
6.0 SITC of All refrigerant Joints (As per OEM)
Providing, fixing, testing and commissioning of Variable
refrigerant flow distribution REFNUTS / T Joints (pair) in the
suction & Liquid lines for various sizes of copper refrigerant Sets 4 12990
piping including insulation etc. as required.
SUB TOTAL-1 (High side Work)
7.0 Ducting & Lowside Work
Factory Fabricated Ducts as per “SMACNA” Standards &
Supply, Fabrication, installation and testing of sheet metal
RECTANGULAR ducts in accordance with the approved shop
drawings and as required by the specifications.The supports
should comprise of support channel made up of cold rolled
steel of quality DX51 or greater and should be hot dip
galvanised. All necessary accessories i.e. Threaded Rods, Nuts,
Washers should have a minimum strength class of 4.8.
All flanged joints to be sealed with 6 mm neoprene gaskets.
Duct joints shall be sealed using UL-listed water-based duct
sealant for class A air systems
(The Supports should be free from welding)
Minimum sizes Gauge Joint Type
9.2 Insulation Work & Acoustic Work
Providing & Fixing Duct thermal insulation with Closed cell
Elastomeric Foam made from EPDM with Alu Foil, having
drensity 40-60 kg/m3 & thickness of 19 mm for Supply Air
Duct & 13 mm for Return Air Duct Insulation as per the
specifications & it Shall not be used in high humidity areas
without vapor barrier. Base Material shall have fire class A
9.2.1 (Flame spread:20 & Smoke developed: 150) in accordance
with ASTM E-84 and flamabillity class V-0 as per UL
Thermal Conductivity is 0.035 w/m.k at 24°C mean
temperature and having µ value ≥ 7000 without any covering.
Material shall be Anti-fungal & Anti-Bacterial in accordance
with UL181 and ASTM E2180 respectively.
Providing and fixing Acoustic Insulation of open cell nitrile
rubber sheet having density of 180-220 kg/m3 and
recommanded thickness of 15 mm. Absorption coefficient
value of Insulation material shall be 0.90 for the 2000 Hz
frequency band in accordance to IS:8225/ISO:354/ASTM
423C. Material shall have fire class 1 as per BS 476 , part
9.2.2 Material Shall be EPA approved and Anti-Fungal & Anti-
Bacterial in accordance with ASTM G21 & ASTM E
respectively. It shall be fixed inside of the duct with the help
of adhesive as per the specifications given. Adhesive should
be synthetic resin-based, compatible with rubber & aluminum
as per the specifications given.
10.0 Underdeck Insulation
Supply & Installation of SMART Pre-Insulated PIR Panels for
Underdeck Insulation complete CFC,HCFC,HFC Free with
below thickness and with FSK Reinforced Aluminium on both
the side (Anti microbial, Anti fungal, Anti corrosion and UV
Protection coating) FSK facing to be overlapped by 75 mm
and sealed with aluminium foil tape. The panels must consist
of closed-cell, rigid cellular PIR foam insulation with no less
than 93% insulation thickness as specified, and the material
shall have COC(TUV) for Class O from any global lab and
should complied as per BS 476 Part 6 & Part 7, Panels should
be tested as per UL 181 & UL 94 , and having Density of 45(+-
3)kg/m3 and should have Thermal Conductivity 0.023 W/mK
Water absorption shall be not more than 0.03% as per EN
13403 standard and panel should be GreenPro, GRIHA, SGBC
and EPD certified. The panels should be fixed under RCC slab
with the help of G.I wire and 38 dia mm screw and washer
arrangement to avoid board sagging. Minimum 6-8 screws to
be used to fix for a Panel sizes of 4 mtr x 1.2 mtr PIR Panel.
a 20 mm thick MT2
SUB TOTAL-3 (Ducting & Lowside Work)
11.0 Ducting Air Distribution Products
Volume Control Damper :
High quality Galvanized Steel Frame with 1.2mm sheet of
thickness as standard. 125mm depth and standard flange
height of 25mm of frame. Blade shall be Double skinned high
11.1 quality extruded Aluminium aerofoil profiles. Drive shaft shall MT2 2 17420
be Electro-plated square rod with Self-lubricating nylon
bushings. Nylon gear for blade linkage with Galvanized Steel
locking hand quadrant. G.I angle of thickness 0.7mm for Blade
Continuous Grills : SITC of Al. extruded powder coated
150mm wide Continuous Grill without collar damper. It
should be powder coated with 60–80 µm thickness & RAL to
be coordinated.
SUB TOTAL-4 (Ducting Air Distribution Products)
TOTAL FOR AIR CONDITIONING WORK (VRF SYSTEM)
ESTIMATED TOTAL PROJECT VALUE FOR AIR CONDITIONING WORK (VRF SYSTEM)
1 Input power supply to units shall be in client's scope
2 Final Billing shall be done as per actual measurement
Scaffolding / ladder / Boom Lift / Scissor Lift for installation of Units shall be MANAGED BY
4 All Civil Work Related to HVAC System will be in Vednor's Scope
5 Zari work if required, shall be done by Vedor
The Quoted pirce is inclusive of safely uninstalling the Exisiting System and placing the entire lot at a
defined space in the same premises
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Conditions for Gyanodat Bhawan HVAC Tender.pdf
BOQ Upload R1.pdf
OEM Compliance Certificate.pdf
CORRIGENDUM
CORR BOQ Upload R3.pdf
CORRIGENDUM
CORR BOQ Upload R2.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .