Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance SON OF YADU MISTRY HIRAK ROAD HARINA NEAR HANUMAN MANDIR NAWAGARH BARORA DHANBAD DHANBAD 828306 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828306 | +0.00% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 L+₹12,522.90 (3.90%)Admitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | +3.90% | ₹3.3 L+₹12,522.90 (3.90%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 L+₹20,550.40 (6.40%)Admitted-Finance 0 BHIMKANALI KHANUDIH BAGHMARA DHANBAD JHARKHAND 828306 | DHANBAD | JHARKHAND | 828306 | +6.40% | ₹3.4 L+₹20,550.40 (6.40%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
17 Aug 2026, 6:00 pmClosed
AREA MANAGER (ENM), BARORA AREA
EnM Department, Office of the General Manager, Barora Area, Nawagarh, Dhanbad
Complete repairing/rewinding of 11KV/440volt GEC Make 500 KVA power transformer Colliery Sl.No- Mur/TR/08(a) at Dozer section Muraidih under AMP Colliery.
2026_BCCL_363323_1
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/134
Open Tender
Electrical and Maintenance Works
Percentage
15 days
AMP COLLIERY, BARORA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,100
29 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
8 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | New Electrolytic Copper Strip for Primary side 03 limb x 40Kg.x3= 120 Kg (less scrap 120 Kg @ Rs.400/Kg) | 120 | Kg | 600 | ₹72,000 |
| 1.02 | New Electrolytic Copper Strip for Secondary side 03 limb x 65 Kg (less scrap 120 Kg @ Rs.400/Kg) | 195 | Kg | 600 | ₹1,17,000 |
| 1.03 | Re-Insulation primary & secondary side for T.P.C. Covering | 315 | Kg | 100 | ₹31,500 |
| 1.04 | Insulating Materials i.e. 10% of the cost of total copper value (315 Kg x 1000)*10% | 1 | AU | 31,500 | ₹31,500 |
| 1.05 | Corksheet changing for primary & secondary side and top cover etc. | 1 | AU | 3,000 | ₹3,000 |
| 1.06 | Transformer oil filtration | 550 | L | 7 | ₹3,850 |
| 1.07 | Iron nut & bolt H.T. bolt other size | 50 | EA | 20 | ₹1,000 |
| 1.08 | Core Varnishing | 1 | AU | 5,500 | ₹5,500 |
| 1.09 | Core heating & winding heating | 1,000 | AU | 6 | ₹6,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_376242.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .