Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.7 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹23.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹24.2 L+₹49,742.74 (2.10%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹24.2 L+₹49,742.74 (2.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.7 L
EMD Value
₹23,687
Closing Date
4 Jul 2026, 5:00 pmClosed
EXECUTIVE OFFICER, NAC KHARIAR ROAD
OFFICE OF EXECUTIVE OFFICER, NAC KHARIAR ROAD
CONSTRUCTION OF OFFICE CUM CHANGING ROOM AT NEW SWIMMING POOL WARD NO 3
2026_ORULB_132399_9
18681/KHRD
Open Tender
Civil Works - Others
Percentage
KHARIAR ROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
EXECUTIVE OFFICER, NAC KHARIAR ROAD
₹23,687
Yes
7 Jul 2026
20 Jun 2026
7 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 80.59 | CUM | 270.9 | ₹21,831.83 |
| 2 | Filling of Foundation and Plinth with excavated earth, well watered and rammed as per Direction of Engineer-in-Charge. | 53.73 | Cum | 150.5 | ₹8,086.37 |
| 3 | Supply & Filling in Foundation and Plinth with sand, well watered and rammed. | 39.07 | CUM | 505.04 | ₹19,731.91 |
| 4 | Plain Cement concrete (1:3:6) work as levelling course with 40 mm size hard granite metal. | 8.31 | Cum | 5,783.01 | ₹48,056.81 |
| 5 | Plain Cement Concrete of Grade M15 in Ground Floor complete as per Drawing and Technical Specifications. | 8.79 | Cum | 5,219.69 | ₹45,881.08 |
| 6 | R.C.C. work of M-25 grade with 20mm and 10mm down grade black hard granite (crusher broken) stone chips including hoisting, laying, and compacting, watering and curing for 28 days including all cost, conveyances, royalties and taxes of all materials and cost of labour with T & P required for the work etc. all complete in all respect. | 40.21 | CUM | 6,391.12 | ₹2,56,986.94 |
| 7 | Rigid and smooth Centering and Shuttering for R.C.C. works, dismantling them after casting and making good the finished surfaces including cost of materials, T&P etc. all complete. Footing | 36.72 | SQM | 247.51 | ₹9,088.57 |
| 8 | Plinth Beam | 52.96 | SQM | 247.51 | ₹13,108.13 |
| 9 | Columns | 39.6 | SQM | 1,182.83 | ₹46,840.07 |
| 10 | Roof Beams | 56.27 | SQM | 1,182.83 | ₹66,557.84 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.51 MB
BOQ_597114.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .