Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.3 LAdmitted-Finance | -8.44% | ₹25.3 L | L1 | Admitted-Finance |
| 2 | L2₹26.1 L+₹82,735.67 (3.28%)Admitted-Finance | -5.44% | ₹26.1 L+₹82,735.67 (3.28%) | L2 | Admitted-Finance |
| 3 | L3₹27.0 L+₹1.8 L (7.03%)Admitted-Finance | -2.00% | ₹27.0 L+₹1.8 L (7.03%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical SHOP NO 6 VDS MARKET SECTOR 51 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹27.6 L
EMD Value
₹56,000
Closing Date
25 May 2026, 5:00 pmClosed
SM WC-8
Main Administrative Building Sector-6 Noida
M/o Village (Renovation of Pond in village Salarpur) Noida
2026_NOIDA_1146733_1
08/ SM (WC-8)/ET/2025-26
Open Tender
Civil Works - Others
Fixed-rate
90 days
Noida
Please refer to tender documents
3 documents required · 3 mandatory
₹2,124
Noida
₹56,000
16 Jun 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 292 | Sqm. | 20.47 | ₹5,977.24 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 25 | cum | 144.95 | ₹3,623.75 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 20 mm nominal size) | 5 | cum | 5,746.88 | ₹28,734.4 |
| 4 | Brick work with F.P.S. bricks of class designation 150 in superstructure above plinth level upto floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 22 | cum | 6,276.98 | ₹1,38,093.56 |
| 5 | 12 mm cement plaster :1:4 (1 cement : 4 coarse sand) | 541 | sqm | 176.77 | ₹95,632.57 |
| 6 | Neat cement punning | 62 | sqm | 39.13 | ₹2,426.06 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,538 | kg | 82.81 | ₹2,10,171.78 |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works above plinth level upto floor V level | 25 | cum | 8,654.75 | ₹2,16,368.75 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 84 | Sqm | 320.65 | ₹26,934.6 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | 47 | Sqm | 426.85 | ₹20,061.95 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Capability.xls
Additional Documents • 0.04 MB
TD08.pdf
Tender Documents • 2.30 MB
BOQ_2144611.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .