| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.7 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹29.8 L+₹1.2 L (4.04%)Rejected-AOC | 2 | Rejected-AOC second lowest |
Tender Value
₹23.3 L
EMD Value
₹50,000
Closing Date
5 Aug 2019, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP-Pamba-M and M festival in 1195 ME-Disposal of garbages at Pamba-Overhauling and operation of Incinerator Unit II and III including supply of spares and labour(New Incinerator)
2019_TDB_288704_1
SDP/EE/ET-11/2019-20
Open Tender
Civil Works - Others
Item Rate
90 days
Pamba
Refer NIT
6 documents required · 6 mandatory
₹2,800
online
₹50,000
14 Oct 2020
27 Jul 2019
7 Aug 2019
27 Jul 2019
5 Aug 2019
27 Jul 2019
Amount
APPENDIX A Maintenance to the droplet separator unit of each Incinerator by dismantling the unit from the incinerator assembly , and de-ashing the same using suitable chemical solution, Re assembling the unit using new high quality gasket, nuts, bolts and painting using heat resistant hammer tone painting .The work includes repairing and cleaning of ‘U’ bend connecting the droplet separator with ID fan consumables.
Maintenance to the ventury scrubbing unit of each incinerator by dismantling all the water inlet connections from the unit, cleaning the spray nozzles, inside surface, damper mechanism, thermo well and re assembling the unit using new gaskets, nuts bolts etc. the defective gaskets, nuts bots , . The rate inclusive all taxes cost of consumables etc.
Dismantling, overhauling, cleaning, and minor repair works to the FD fan assembly .The work includes complete cleaning of the impeller, motor, coupling and re assembling , and necessary patch work to the casing and painting . The rate inclusive of all taxes transportation and cost of consumables.
Maintenance, repairing and complete overhauling of primary chamber. (2 set) Cleaning the refractory lined furnace walls, arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined charging door and ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats) of primary chamber out surface using heat resistant aluminium paint. The rates inclusive of all taxes, charges for tools and tackles, consumables and transportation charges.
Maintenance, repairing and complete overhauling of secondary chamber . (2 set)Cleaning the refractory lined furnace walls, arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats)of secondary chamber out surface using heat resistant aluminium paint. The rates inclusive of all taxes, charges for tools and tackles, consumables and transportation charges.
Dismantling of horizontal refractory lined duct connecting the secondary chamber with ventury scrubber , removing the defective refractory layer form the duct, cleaning and re casting the duct using refractory cement (grade whytete/K). the work also includes providing necessary ‘Y’ type jagers inside the surface for strengthening the refractory lining. The rate inclusive of all taxes cost of consumables , all tools , tackles , like tri-pole for lifting the duct.
Complete dismantling of mono -bloc burner assembly in primary and secondary chamber for the incinerators, cleaning of electrodes, solenoid valves, blower fans, transformer, burner rod, nozzle, photocell, sight glass, diffuser plate, cone etc., Reassembling and tuning of burner assembly for proper combustion of system. The rate inclusive of all taxes.
Labour charges for cleaning of fuel day tank, fuel lines, fuel filter , Rectification of leakages to the fuel line, valves, fuel pump, Replacement of gland packing, gaskets, oil seal for both the incinerators . The rate is inclusive of all taxes etc
Repairing and replacing the defective control panel ( without internal instruments like contactors, relays and isolater) with a new control panel shell made of CR sheet , powder coated . The work includes dismantling all the instruments like contactors, relays , connectors, wires , cables, controls , and isolator from the defective control panel, re fixing/replacing the above instruments after proper inspection- to the new control panel, re wiring the new control panel using new control/power cables, connectors, legs, fixtures like G channel, C channel , indication lamps , glands, screws etc and fixing the new control panel to the wall using structural supports
Dismantling overhauling cleaning and minor repair works to the ID fan assembly. The work includes reassembling the blower unit, motor, shaft, impeller, bearing block, in proper alignment and carrying out necessary cleaning and surface finishing for the outer casing, , necesssary patch work to the casing and repainting using heat resistant hammer tone paint and labour charges for replacing of bearings ,greasing of bearing and dyanamic balancing of impeller .The rate inclusive of all taxes transportation and cost of consumables.
Design , supply, fabrication of MS duct for replacing the defective duct portion between ID fan and chimney and emergency stack from ventury scrubber - duct having 400 mm dia , 4mm thick , with mitter bend flanges, drain point , etc coated with 2 coats of aluminum paint . The rate is inclusive of dismantling of existing duct , transportation charges etc
APPENDIX B - Spare Parts Thermocouple K Type (For primary chamber)
Thermocouple KER 710 (For secondary chamber)
Nozzle
V Belt B-97
RTD assembly for ventury outlet
Electrode Assembly
Hose Metallic Braided 3/8 x 40
Digital Temperature Controller 0-1200degC
Contactor 32 A,230 V coil
Contactor 18 A ,230 V coil
Overload Relay 14-23A
Overload Relay 4.5-6.5A
Overload Relay 1.4-2.3A
Diffuser Plate
Transformer 14.5 KVA
Solenoid Valve
Single phase preventer
Fuel pump AJ-6
APPENDIX C - Labour Charges Engaging overall Supervisor for 75 days. (1 No. /3Shift /day)(3*75=225 Nos.)
Engaging SCAVENGER for loading of garbages into the incinerator for 75 days.(2 Nos. of machines)(3 Nos./shift for 3 shifts/day /machine)(3*3*2*75)=1350 Nos.)
Engaging SCAVENGER to segregate plastic materials from the garbages for 67 days.(5 Nos./shift for 3 shifts/day)(3*5*75)=1125 Nos.)
Yellow mask
MattyMask
Rubber Gloves 14"
Rubber Gloves 18"
CINZAC ENGINEERS (INDIA) PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_393031.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .