Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC PINARAYI P O THALASSERY KANNUR PIN 670741 | THALASSERY | KANNUR | KERALA | 670741 | 1 | Accepted-AOC awarded to lowest bidder |
| Sl No | Description | Qty | Unit | PINARAYI INDUSTRIAL CO OPERATIVE SOCIETY LTD L1 |
|---|---|---|---|---|
| 1.00Tarring | ||||
| 1.00 | 3.14 : Construction of Subgrade and Earthen Shoulders<br>
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 5.62 | cum | - |
| 1.00 | 3.3 : Construction of Embankment with Material Obtained from Roadway Cutting <br>
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 23.62 | cum | - |
| 1.00 | 3.5.3 : Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 23.62 | cum | - |
| 1.00 | 3.15.2 : Compacting Original Ground<br>
(ii) Compacting original ground supporting subgrade<br>
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 95.15 | cum | - |
| 1.00 | 4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 41.47 | cum | - |
| 1.01 | 4.9 : Wet Mix Macadam <br>
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br>
By Mechanical Means with 1 km lead | 62.2 | cum | - |
| 1.01 | 75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 414.66 | sqm | - |
| 1.01 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 414.66 | sqm | - |
| 1.01 | 75.5.9.2.2.Pd : Plastic Roads - Bitumen - S-65 <br> 20 mm thick Open- Graded Premix Carpet using Bituminous ( Penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearinf course on a previously prepared base, including mixing in a suitable plant,laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B Type C as Techinical Specification Clause 508 (with 7% of bitumen replaced by shreadded waste plastice) <br> Case - I By Manual Means <br> <br> (II) Bitumen (S-65) ( VG-30) | 414.66 | sqm | - |
Tender Value
₹5.2 L
EMD Value
₹15,000
Closing Date
4 Nov 2019, 6:00 pmClosed
THE ASSISTANT ENGINEER
THE ASSISTANT ENGINEER EDAKKAD BLOCK PANCHAYATH CHALA EAST PIN 670621
2019/68672 Edakkad BP Proj.No. 47/19-20 -Kollanchal Mukku Mavilayi Road tarring in Chembilode GP
2019_LSGD_305682_4
D2/AEE/EKD/TENDER/03(A)
Open Tender
Civil Works - Roads
Item Rate
150 days
CHEMBILODE
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,356
Yes
online
₹15,000
Yes
18 May 2026
26 Oct 2019
6 Nov 2019
26 Oct 2019
4 Nov 2019
27 Oct 2019
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_431493.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .