| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.0 CrAdmitted-Finance 3 6 H S TOWER L ROAD BISTUPUR JAMSHEDPUR JHARKHAND 831001 | EAST SINGHBUM | JHARKHAND | 831001 | L1 | Admitted-Finance | |
| 2 | L2₹62.3 Cr+₹30.9 L (0.50%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹63.7 Cr+₹1.7 Cr (2.70%)Admitted-Finance PATHARGAMA GODDA | PATHARGAMA | GODDA | JHARKHAND | L3 | Admitted-Finance | |
| 4 | L4₹67.7 Cr+₹5.7 Cr (9.16%)Admitted-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | L4 | Admitted-Finance | |
| 5 | L5₹70.1 Cr+₹8.1 Cr (13.1%)Admitted-Finance PREM KUNJ APARTMENT FLAT NO 3C MPD ROAD JAGDISHPUR BHAGALPUR BIHAR | BHAGALPUR | BIHAR | 811211 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MINI CONSTRUCTION L6 | Sri Ram Enterprises L5 | M/s Ganga Construction L7 | M/S S K TEKRIWAL L3 | TRIVENI ENGICONS PRIVATE LIMITED L1 | K. K. Builders Pvt. Ltd. L2 | VELJI RATNA SORATHIA INFRA PVT. LTD L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. SOR2.03(i) | 23.1 | Hect. | 97,500 ₹22,52,250 | 96,464.46 ₹22,28,329.03 | 96,906.95 ₹22,38,550.6 | 87,614.51 ₹20,23,895.18 | 45,000 ₹10,39,500 | 35,000 ₹8,08,500 Lowest | 97,000 ₹22,40,700 |
| 2.00 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (i) 300-600 mm .SOR2.01+2.02 | 5 | each | 300 ₹1,500 | 667.84 ₹3,339.2 | 670.91 ₹3,354.53 | 606.57 ₹3,032.85 | 700 ₹3,500 | 10 ₹50 Lowest | 573 ₹2,865 |
| 3.00 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (ii) 600-900 mm.SOR2.01+2.02 | 159 | each | 500 ₹79,500 | 1,008.9 ₹1,60,415.1 | 1,013.53 ₹1,61,151.59 | 916.34 ₹1,45,698.06 | 700 ₹1,11,300 | 10 ₹1,590 Lowest | 900 ₹1,43,100 |
| 4.00 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (iii) 900-1800 mm.SOR2.01+2.02 | 312 | each | 800 ₹2,49,600 | 1,563.93 ₹4,87,946.16 | 1,571.11 ₹4,90,185.07 | 1,420.45 ₹4,43,180.4 | 1,200 ₹3,74,400 | 10 ₹3,120 Lowest | 1,500 ₹4,68,000 |
| 5.00 | Cutting of trees, including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (iv) >1800 mm.SOR2.01+2.02 | 144 | each | 1,400 ₹2,01,600 | 2,772.63 ₹3,99,258.72 | 2,785.35 ₹4,01,090.62 | 2,518.26 ₹3,62,629.44 | 1,200 ₹1,72,800 | 10 ₹1,440 Lowest | 2,700 ₹3,88,800 |
| 6.00 | Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately SOR 2.14 | 27 | Nos. | 200 ₹5,400 | 201.76 ₹5,447.52 | 202.68 ₹5,472.48 | 183.25 ₹4,947.75 | 100 ₹2,700 Lowest | 100 ₹2,700 Lowest | 200 ₹5,400 |
| 7.00 | Dismantalling of Stone masonary in cement mortar-do-do-all complete job as per specification and direction of E/I
SOR 2.04(iii)B | 2,076.62 | m3 | 300 ₹6,22,986 | 312.07 ₹6,48,050.8 | 313.5 ₹6,51,017.26 | 283.44 ₹5,88,597.17 | 100 ₹2,07,662 Lowest | 300 ₹6,22,986 | 300 ₹6,22,986 |
| 8.00 | Dismantalling of stone masonary in cement mortar-do-do-all complete job as per specification and direction of E/I
PCC M15 and above 2.04 (i) (B) | 340.29 | m3 | 400 ₹1,36,116 | 493.12 ₹1,67,803.8 | 495.38 ₹1,68,572.18 | 447.88 ₹1,52,409.09 | 100 ₹34,029 Lowest | 500 ₹1,70,145 | 450 ₹1,53,130.5 |
| 9.00 | Dismantalling of stone masonary in cement mortar-do-do-all complete job as per specification and direction of E/I
RCC M20 and aboveSOR 2.4II(B) | 68.4 | m3 | 500 ₹34,200 | 966.83 ₹66,131.17 | 971.26 ₹66,434.53 | 878.13 ₹60,064.09 | 100 ₹6,840 Lowest | 600 ₹41,040 | 900 ₹61,560 |
| 10.00 | Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works.SOR 2.04(ix)B | 142.5 | m | 750 ₹1,06,875 | 867.64 ₹1,23,638.7 | 871.62 ₹1,24,205.85 | 788.04 ₹1,12,295.7 | 125 ₹17,812.5 Lowest | 800 ₹1,14,000 | 800 ₹1,14,000 |
Tender Value
₹64.3 Cr
EMD Value
₹64.3 L
Closing Date
11 Jun 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer, RCD, Road Division, Manoharpur
Reconstruction/Strengthening of Goilkera (On Chaibasa-Saitwa road MDR-186) to Roam via Kentar, Kara, Khajuria (Total Length 0.00 k.m. to 22.00 k.m.)
2026_CECOM_113796_1
RCD/Manoharpur/02/2026-27
Open Tender
Civil Works - Roads
Item Rate
450 days
Goilkera
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹64.3 L
CE (Comm) RCD Dhurwa Ranchi
25 Sept 2026
14 May 2026
12 Jun 2026
14 May 2026
11 Jun 2026
14 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. SOR2.03(i) | 23.1 | Hect. | 88,499.5 | ₹20,44,338.45 |
| 2 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (i) 300-600 mm .SOR2.01+2.02 | 5 | each | 612.7 | ₹3,063.5 |
| 3 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (ii) 600-900 mm.SOR2.01+2.02 | 159 | each | 925.6 | ₹1,47,170.4 |
| 4 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (iii) 900-1800 mm.SOR2.01+2.02 | 312 | each | 1,434.8 | ₹4,47,657.6 |
| 5 | Cutting of trees, including cutting of trunks,branches and removal of stumps,roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. (iv) >1800 mm.SOR2.01+2.02 | 144 | each | 2,543.7 | ₹3,66,292.8 |
| 6 | Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately SOR 2.14 | 27 | Nos. | 185.1 | ₹4,997.7 |
| 7 | Dismantalling of Stone masonary in cement mortar-do-do-all complete job as per specification and direction of E/I
SOR 2.04(iii)B | 2,076.62 | m3 | 286.3 | ₹5,94,536.31 |
| 8 | Dismantalling of stone masonary in cement mortar-do-do-all complete job as per specification and direction of E/I
PCC M15 and above 2.04 (i) (B) | 340.29 | m3 | 452.4 | ₹1,53,947.2 |
| 9 | Dismantalling of stone masonary in cement mortar-do-do-all complete job as per specification and direction of E/I
RCC M20 and aboveSOR 2.4II(B) | 68.4 | m3 | 887 | ₹60,670.8 |
| 10 | Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works.SOR 2.04(ix)B | 142.5 | m | 796 | ₹1,13,430 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
FOB.pdf
Additional Documents • 0.08 MB
BOQ_153771.xls
BOQ • 0.34 MB
SBD.pdf
Tender Documents • 1.53 MB
Corrigendum.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .