| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shopixo L1 |
|---|---|---|---|---|
| 1.00BOQ | ||||
| 1.01 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +7.00 MTR TO +14.00 MTR | 1 | CUM | 11,200 ₹11,200 Lowest |
| 1.02 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR, 12MM THICK IN CM 1:4 INCLUDING NECESSARY SCAFFOLDING AND CURING ETC., COMPLETE FROM +5.00 TO +10.00 MTR LEVEL. | 25 | SQM | 950 ₹23,750 Lowest |
| 1.03 | SUPPLY OF STRUCTURAL STEEL WITHOUT ANY BENDS AS DIRECTED FOR COLUMN, BEAM, ROOF TRUSS & ROOF MONITOR, PURLIN, ETC., INCLUDING COST OF TRANSPORTATION TO SITE, LOADING, UNLOADING, LABOUR CHARGES ETC., COMPLETE. | 1 | MT | 1,08,000 ₹1,08,000 Lowest |
| 1.04 | SUPPLYING OF NON ASBESTOS CORRUGATED CEMENT SHEETS WITH POLYPROPYLENE FIBRE IN NATURAL GREY FINISH COLOUR, 6MM THICK AND CONFIRMING TO IS STANTARDS AND FIXING IN ROOF, MONITOR, CLADDING IN VERTICAL / LOUVERS, ETC., COMPLETE FROM +0M TO +10M LEVEL INCLUDING CUTTING TO SIZE AND SHAPE WHEREVER REQUIRED. WORK INCLUDES NECESSARY SCAFFOLDING ARRANGEMENTS IN MS PIPES WITH CLAMPS, SAFETY MEASURES, LABOUR CHARGES, CONSUMABLES, REQUIRED FASTENERS WITH ANTI CORROSIVE POLYMER COATED HOOKS/BOLTS, TRANSPORTATION, LOADING, UNLOADING, ETC., COMPLETE. | 75 | SQM | 1,850 ₹1,38,750 Lowest |
| 1.05 | PROVIDING TEMPORARY PLATFORM BY USING PIPES / SCAFFOLDING MATERIAL AND LAYING OF WOODEN PLANKS TO REQUIRED HEIGHT PROVIDE TARPAULIN OVER THE PLATFORM TO AVOID FALLING OBJECT ABOVE THE MACHINERY, ALSO REMOVE THE TEMPORARY PLATFORM AFTER COMPLETION OF THE WORK AS PER ENGINEER INSTRUCTION AT ALL LEVELS. | 175 | SQM | 1,550 ₹2,71,250 Lowest |
| 1.06 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. | 10 | HR | 1,400 ₹14,000 Lowest |
Tender Value
Refer Docs
Closing Date
20 Aug 2026, 3:00 pmClosed
CGM (Production and Project Co-Ordination)
PMD Office, TNPL Unit I, Kagithapuram.
Civil and Structural work for the South side wall and cladding damaged in fire accident in WIP godown at TNPL Unit I
2026_TNPL_693558_1
TNPL/PMD/CIV/CB/UNIT I/ 262713003217
Open Tender
Civil Works
Item Rate
20 days
TNPL Unit I, Kagithapuram, Karur District
Not Applicable
1 document required · 1 mandatory
₹0
Exempted
21 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +7.00 MTR TO +14.00 MTR | 1 | CUM | - | - |
| 1.02 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR, 12MM THICK IN CM 1:4 INCLUDING NECESSARY SCAFFOLDING AND CURING ETC., COMPLETE FROM +5.00 TO +10.00 MTR LEVEL. | 25 | SQM | - | - |
| 1.03 | SUPPLY OF STRUCTURAL STEEL WITHOUT ANY BENDS AS DIRECTED FOR COLUMN, BEAM, ROOF TRUSS & ROOF MONITOR, PURLIN, ETC., INCLUDING COST OF TRANSPORTATION TO SITE, LOADING, UNLOADING, LABOUR CHARGES ETC., COMPLETE. | 1 | MT | - | - |
| 1.04 | SUPPLYING OF NON ASBESTOS CORRUGATED CEMENT SHEETS WITH POLYPROPYLENE FIBRE IN NATURAL GREY FINISH COLOUR, 6MM THICK AND CONFIRMING TO IS STANTARDS AND FIXING IN ROOF, MONITOR, CLADDING IN VERTICAL / LOUVERS, ETC., COMPLETE FROM +0M TO +10M LEVEL INCLUDING CUTTING TO SIZE AND SHAPE WHEREVER REQUIRED. WORK INCLUDES NECESSARY SCAFFOLDING ARRANGEMENTS IN MS PIPES WITH CLAMPS, SAFETY MEASURES, LABOUR CHARGES, CONSUMABLES, REQUIRED FASTENERS WITH ANTI CORROSIVE POLYMER COATED HOOKS/BOLTS, TRANSPORTATION, LOADING, UNLOADING, ETC., COMPLETE. | 75 | SQM | - | - |
| 1.05 | PROVIDING TEMPORARY PLATFORM BY USING PIPES / SCAFFOLDING MATERIAL AND LAYING OF WOODEN PLANKS TO REQUIRED HEIGHT PROVIDE TARPAULIN OVER THE PLATFORM TO AVOID FALLING OBJECT ABOVE THE MACHINERY, ALSO REMOVE THE TEMPORARY PLATFORM AFTER COMPLETION OF THE WORK AS PER ENGINEER INSTRUCTION AT ALL LEVELS. | 175 | SQM | - | - |
| 1.06 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. | 10 | HR | - | - |
stage.html
html • 0.02 MB
finance_833895.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_833895.xls
BOQ • 0.31 MB
BidDocument_262713003217.pdf
Tender Documents • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].