Notice Inviting Tender for RENOVATION OF CANTEEN AT KOTA TOP The Bharat Petroleum Corporation Limited Kota TOP invites bid for RENOVATION OF CANTEEN AT KOTA TOP
14779
1000413135
Limited Tender
Works
Kota TOP
29 Dec 2023
14 Dec 2023
29 Dec 2023
14 Dec 2023
29 Dec 2023
14 Dec 2023
18 Dec 2023 - 27 Dec 2023
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
SUBJECT: TENDER FOR RENOVATION OF CANTEEN AT KOTA TOP - SCOPE OF WORK and SPECIAL
TERMS & CONDITION
Note: Bidders must read these conditions carefully and comply strictly while submitting their bids.
Rates once quoted shall be firm and final, no revision of rates shall be permitted.
Dismantling Work:
1. Dismantling of Old kitchen cabinet including wooden shutters, granite slab, sandstone slabs
2. Dismantling of old Kota TOP flooring tiles
3. Dismantling of window
1. Supply and fixing of Kota Stone for floorings.
2. Supply and fixing of Sandstone for cabinet and shelves.
3. Supply and fixing of wooden shutter including handles.
4. Supplying and fixing of ceramic tiles on walls.
5. Brick Masonry Work
6. Cement Plaster 12mm
7. Supply and fixing of Granite slabs.
8. Emulsion Paint of Room
9. Application of Putty wherever required.
Material Supply and Installation Work:
1. Supply of 4 Door Steel and Glass Almirah
2. Height Adjustable 5-Shelves Heavy Duty Rack - Black Chrome Finish (Steel)
3. Supply, Installation, and commissioning of Industrial Exhaust system
4. Supply, Installation, and commissioning of Exhaust Chimney
5. Supply, Installation of Industrial Burner with 2 Gas Stoves
6. Supply, installation of Stainless steel 2 Stove gas burner with Glass top
7. Supply, installation of 36 W circular ceiling lights
8. Supply, Installation of Kitchen Sink with workbench
9. Supply, Installation of Kitchen Sink without workbench
Detailed Scope of Work:
S.No Detailed Description of Work
Dismantling Work
a. Dismantling of Old kitchen cabinet including wooden shutters, granite slab,
sandstone slabs. The vendor has to stack the material and dispose of unserviceable
at place (inside the premises) designated by Engineering Incharge.
b. Dismantling of old Kota TOP flooring tiles. The vendor has to stack the material and
dispose of unserviceable at place (inside the premises) designated by Engineering
c. Dismantling of window including frame and stacking at place designated by
Engineering Incharge
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
1. Supply and fixing of Kota Stone
Supplying and laying 25mm thick Kota stone slab flooring over and including 20mm thick
base of 1:4 (1 cement : 4 coarse sand ) laid over and jointed with grey cement slurry mixed
with pigment to match the shade of the slab including rubbing and polishing to granolithic
finish complete.
2 Supply and fixing of SandStone Stab
Supplying and laying 25 – 30 mm thick Sandstone slab flooring over and including 20mm
thick base of 1:4 (1 cement : 4 coarse sand ) laid over and jointed with grey cement slurry.
2 Supply and fixing of Wooden Shutter
Shutters of the cabinets below counter shall be made out of 16 mm thick ISI branded 'Marine
plywood' of BWP grade conforming to IS 710. Each shutter shall be fixed to the frame work
using two number of best quality EURO type Slip-in Hinges and provided with approved
quality and profile brush finished SS handle (minimum 100mm long) of approved make.
Frame work is in vendor scope. Cost of frame work has to be considered by bidder in this
line item only. No additional work order will be issued for frame work cost. All exposed
surfaces of the plywood used in the work shall be laminated on both sides with 0.80 mm
thick laminate of approved make and shade (by factory pressing using laminates of approved
make and shade and approved quality and make synthetic resin based adhesives.
3 Supply and Fixing of tiles (Wall Dadoing)
Providing and fixing glazed screen ceramic printed tiles conforming to IS 15622 of minimum
thickness 8mm of approved desigh; colour, size and shade in dados on 12mm thick cement
plaster 1:3( 1 cement :3 coarse sand ) jointed with white cement slurry mixed with matching
pigment including cleaning finished surface with Oxalic acid, wax polishing,etc . complete.
4 Supply and fixing of tiles (for Cabinet)
"Supplying and laying vitrified ceramic tiles with water absorption less than 0.08% and
conforming to IS : 15622, of approved make, colour and design at all levels and locations
using approved first quality tiles inflooring with or without spacers, laid over abedding of
cement mortar bed of mix 1:4 to achieve overall flooring thickness as 50mm and a backcoat
of white cement slurry and joints filled with white cement mixed with matching pigment
complete with all bye works like covering with plaster of paris, curing etc. at all leads and
lifts and as perspecification / instructions of the Engineer Incharge."
5 Brick Masonry Work
BRICK MASONRY ABOVE PLINTH
Supplying and laying Brick work in superstructure aboveplinth level including supplying and
laying good quality bricks conforming to BIS std., satisfying efflorescene, water absorbtion
and dimension test as per IS code) in superstructure using Cement Mortar 1:5(1part cement
: 5 part coarse sand) including raking out joints, curing, soaking of bricks, providing recesses,
openings ,staging, curing, raking out joints etc. complete as directed
6 Cement Plaster work 12 mm
Providing cement plaster finished including cleaning, hacking of base surfaces, curing,
finishing etc. all complete for all heights as per specifications and directions of Engineer-in-
charge including grooves, bands, drip moulder where ever required as specified.
7 Supply and fixing of Granite
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
Supply and fixing of jet black Granite top of minimum 17 mm thickness for the work surface
(not more than two pieces of the “L” shape counter). The granite shall have 60 cms
clear width and the back edge should be inserted into 25mm deep groove in the
wall. The front edge of the granite countertop shall be bull nosed and polished. Necessary
puncture shall be made in the slab for accommodating hole for LPG hose.
8 Painting of Room
Preparing surface and painting 2 coats of Plastic Emulsion Paint of approved make, shade
and quality in all heights of walls, ceiling, sun sheds fins etc. incl. providing scaffolding, pitting
in plaster to be made good, cleaning with coir brush & sand paper, curing and supply of all
materials and labour complete. The finished surface shall be even and uniform. The
application of paint shall conform to Manufacturer's recommendation and as per the
directions of Enginner-in-Charge.
9 Application of Putty (wherever required)
Preparing surface and pasting of putty for uniform finish of approved make incl. providing
scaffolding and supply of all materials and labour complete.
Supply and Installation of Material
1 Supply of Stainless Steel 4 Glass Door Almirah
The almirah dimensions range is as following
Height – 190-200 cm
Width – 85 -120 cm
Depth – 45 – 60 cm
The sheet gauge shall be min 22 gauge. The almirah shall have Min 4 compartments.
Illustrative Photo:
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
2 Supply and fixing of Steel Open Rack
Supply and fixing of height adjustable 5 shelves Heavy Duty Steel Rack (Back Chrome
The rack dimension shall be approx.
Depth – 35 – 45 Cm
Width – 90 -100 Cm
Height – 180 – 200 Cm
Each rack should be able to hold atleast 150 Kg weight.
Illustrative Photo:
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
3 S/I/C of Industrial Kitchen Exhaust System
Supply, Installation and Commissioning of industrial exhaust ventilation system consisting
1. Stainless Steel rectangular Hood
2. Suction motor – single phase 220V, suction power atleast 2000 M3/Hr
3. Mounting type – wall mounted
5. Stainless steel outlet tube – wall hole making is also in line item scope only.
Illustrative Photo:
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
4 S/I/C of Kitchen Exhaust Chimney
Supply, Installation and Commissioning of Kitchen Exhaust Chimney:
a. Mounting type – Wall mounted
b. suction - min. 1000 m3/hr
c. Function type – Auto cleaning
d. Filter type - Filter less
e. Finish – Black color
f. Warranty – 2 year on product and 8 year on motor
Completed installation including exhaust pipe, holes making on wall, SS sheets are in this
item scope only and to be done by vendor.
Illustrative Photo:
5 S/I/C of Commercial type Double Burner Gas Stove
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
No of Burners 2 Nos
Usage/Application Commercial kitchen
Number Of Knob 4 Nos
ISI Certified Yes
Control Type Knob
Ignition Type Manual
Burner Type High Power Burner
Is It Portable Yes
Size 4 feet x 2 feet
Material Stainless Steel
Illustrative Photo:
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
6 Supply of 2 Burner Gas Stove
Top – Glass top
Body – Stainless Steel
Ignition – Manual
ISI Certified – Yes
Illustrative Photo
7 S/I of LED Lights 36 W Ceiling Light
Supply and Installation of 36-Watt LED lights mounted on ceiling. Wiring connection
including switches is in vendor scope. Vendor has to include the cost of wiring, conduit
casing, switch in this line item only
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
8 S/I of Commercial Sink with Workbench
Supply and Installation of Stainless Stell Commercial Sink
Mounting type - Floor mounting Free Standing Type, Adjustable feet
No of Bowls – Single bowl
Workbench/Operating Station – Yes
Towel Bar – Yes
Faucet and Pipeline connection from existing water supply – In Vendor scope
Sewer connection – In vendor scope
Storage shelf below the Sink – Yes
Height – 82 – 90 cm
Length – 110 – 120 cm
Width – 40 – 50 cm
Sink Size – Length – 45 – 50 cm
Width – 35 – 40 cm
Depth – Min 20 cm
Body of material – Stainless Steel
Corners shall be rounted
Drain in basin shall have cover
Illustrative Photo
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
9. S/I of Commercial Sink without Workbench
Supply and Installation of Stainless Stell Commercial Sink
Mounting type - Floor mounting Free Standing Type, Adjustable feet
No of Bowls – Single bowl
Workbench/Operating Station – No
Towel Bar – Yes
Faucet and Pipeline connection from existing water supply – In Vendor scope
Sewer connection – In vendor scope
Storage shelf below the Sink – NA
Height : 75 – 85 cm
Width – 45 – 50 cm
Length – 65 – 72 cm
Sink size : Length – 62 – 70 cm
Width – 40 – 45 cm
Depth – Min 20 cm
Body of material – Stainless Steel
Corners shall be rounted
Drain in basin shall have cover
Illustative Photo
Note : All product supply shall be under two year Warranty period.
The scope of the tender is not limited to the work described above. The quantities are tentative and
may vary at site. Hence, Vendor must take into consideratio n all the work at site during site visit
and quote accordingly. Tenderer in his own interest is advised to visit the site prior to submitting
Any clarification regarding the work can be had from our department before submission of the tender
or you may contact.
Mr. Hemant Sharma, Manager Ops, BPCL Kota TOP, Mob. No.
Mr. Devesh Singh, Manager HSSE, BPCL Kota TOP, Mob No.
Mr. Mohd Ibran, Chief Manager Ops I/C, BPCL Kota TOP, Mob. No.
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
SPECIAL TERMS & CONDITIONS
1. These special terms and conditions is also a part of General Conditions of the Tender.
2. The rates quoted by the tenderer should be inclusive of all taxes, levies, fees etc. BPCL will
not pay any amount towards other taxes, levies, fees and the successful tenderer will have to
adhere to all Govt. rules & regulations etc.
3. The Contractor and his workmen should follow rules and regulations of our Plant.
4. The contractor should follow the safety norms, as applicable in the plant and as directed by
the Corporation from time to time.
5. The contractor has to ensure overall safety of all the workmen employed by him/her and
should provide safety shoes and helmet etc. The contractor shall also ensure that the safety
shoe, helmet, uniforms is regularly worn by all his workmen. Officer may instruct for stoppage
of work if the safety norms are not complied with.
6. The contractor has to ensure one supervisor’s presence during the job and will be responsible
to ensure safety of the labours working under him.
7. The Contractor will be required to collect all waste / scrap materials generated during the
work in the plant and deposit it at designated places on daily basis & disposed off the same at
designated place on regular basis as per advice of Engineering incharge.
8. You would be required to engage adequate number of manpower so as to carry out all the
work satisfactorily. The persons employed should be of suitable age for brisk working and
should have knowledge about the work, inside the plant. No person above the age of 60 years
or below 18 years shall be employed by you in the plant.
9. The Contractor shall provide all tools, tackles, and consumables etc. that are required to
complete the subject job. In no case, fire water is to be used for cleaning purpose.
10. Tenderer is supposed to visit the site before quoting for the job for acquaints him with the job
Schedule and available facilities at the location. If the Vendor does not visit the site, then it is
presumed that vendor has visited the site and understood all the items of the job thoroughly.
11. Successful tenderer shall also be responsible for and pay the expenses for providing medical
treatment to any of their employees who may suffer bodily injury as a result of any accident.
12. All the taxies, duties, if any or any other extra cost will be borne by the successful tenderer.
13. The payment will be made to the party on basis of actual measurement, wherever applicable.
14. The total landed lowest cost will be considered and any dispute on this term will not be
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
15. The quantities indicated are approximate and may vary at the time of execution. The
corporation will exercise absolute discretion for operating all or some items of the schedule.
16. Contractor has to remove all the debris from the site of execution and dispose them at suitable
places shown by the Engineer or his authorized representative at site.
17. The contractor shall have to deploy all plant & machineries require to carry out the work
without any additional cost to BPCL.
18. Custody of Materials/Machineries/tools and other spares to be used for the jobs (as per
tender scope of works) will be in the scope of the vendor. BPCL is not liable for any damage
or loss till completion of works.
19. Time being essence of contract and work to be executed in operating location. The job should
be completed within 5 weeks from the date of LOI. Liquidity damages for delayed work period
will be charged as 0.5 % of contract amount per week of delay of work completion in all
aspects including clearing of site.
20. The vendor shall after paying the requisite security deposit, commence work within 15 days
from the date of receipt of the intimation of intent from the BPCL informing that the contract
is being awarded. The date of intimation shall be the date/day for counting the starting
day/date and the ending day/date will be accordingly calculated. Penalty, if any, for the delay
in execution shall be calculated accordingly.
21. A Letter of Intent is an acceptance of offer by the BPCL and it need not be accepted by the
vendor. But the vendor should acknowledge a receipt of the purchase order within 15 days of
mailing of Purchase Order and any delay in acknowledging the receipt will be a breach of
contract and compensation for the loss caused by such breach will be recovered by the BPCL
by forfeiting earnest money deposit/bid bond.
22. Subject to the provisions of this contract, the vendor shall if ordered in writing by the
Engineer- in-Charge/Site-in-Charge for reasons recorded suspend the works or any part
thereof for such period and such time so ordered and shall not, after receiving such, proceed
with the work therein ordered to suspended until he shall have received a written order to re-
start. The Vendor shall be entitled to claim extension of time for that period of time the work
was ordered to be suspended. Neither the BPCL nor the Vendor shall be entitled to claim
compensation or damages on account of such an extension of time.
In case of suspension of entire work, ordered in writing by Engineer-in-Charge/Site-in-Charge,
for a period of 60 days, the BPCL shall have the option to terminate the Contract as provided
under the clause for termination.
The Vendor shall not be at liberty to remove from the site of the works any plant or materials
belonging to him and the Employer shall have lien upon all such plant and materials.
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
The contract shall, in case of suspension have the right to raise a dispute and have the same
arbitrated but however, shall not have the right to have the work stopped from further
progress and completion either by the BPCL or through other vendor appointed by the BPCL.
23. The Engineer-in-Charge/Site-in-Charge and Officers from Central or State Government will
have full power and authority to inspect the works at any time wherever in progress, on the
site. The Vendor shall, at all times during the usual working hours and at all other times at
which reasonable notice of the intention of the Engineer-in-Charge/Site-in-Charge or his
representative to visit the works shall have been given to the Vendor, either himself be
present to receive orders and instructions, or have a responsible agent, duly accredited in
writing, present for the purpose. Orders given to the Vendor's agent shall be considered to
have the same force as if they had been given to the Vendor himself. In the event of breach
of above, the same shall be uncovered at Vendor's expense for carrying out such
measurement and/or inspection.
24. No material shall be removed and dispatched by the Vendor from the site without the prior
approval in writing of the Engineer-in-charge. The vendor is to provide at all times during the
progress of the work and the maintenance period proper means of access with ladders,
gangways, etc. and the necessary attendance to move and adapt as directed for inspection or
measurements of the works by the Engineer-in-Charge/Site-in-Charge.
25. Vendor shall be responsible for making good to the satisfaction of the BPCL any loss of and
any damage to all structures and properties belonging to the BPCL or being executed or
procured by the BPCL or of other agencies within the premises of the work of the BPCL, if such
loss or damage is due to fault and/or the negligence or willful acts or omission of the Vendor,
his employees, agents, representatives or sub vendors.
26. The Vendors shall indemnify and keep the BPCL harmless of all claims for damage to BPCL's
property arising under or by reason of this contract.
27. If it shall appear to the Engineer-in-Charge/Site-in-Charge that any work has been executed
with bad, imperfect or unskilled workmanship, or with materials, or that any materials or
articles provided by the Vendor for execution of the work are not of standards
specified/inferior quality to that contracted for, or otherwise not in accordance with the
contract, the VENDOR shall on demand in writing from the Engineer-in-Charge/Site in-Charge
or his authorised representative specifying the work, materials or articles complained of,
notwithstanding that the same may have been inadvertently passed, certified and paid for,
forthwith rectify or remove and reconstruct the work so specified and at his own charge and
cost and expenses and in the event of failure to do so within a period of 15 days of such
intimation/information/knowledge, the Vendor shall be liable to pay compensation
equivalent to the cost of reconstruction by the BPCL. On expiry of 15 days period mentioned
above, the BPCL may by themselves or otherwise rectify or remove and re-execute the work
or remove and replace with others, the materials or articles complained of as the case may be
at the risk and expenses in all respects of the Vendor. The decision of the Engineer-in- Charge/
Site-in- Charge as to any question arising under this clause shall be final and conclusive and
shall not be raised as a dispute or shall be arbitrable.
REF: KOTA/RENOVATION/2023-24/03 DATE: 11.12.2023
28. The Vendor shall at his own expenses arrange for the Safety provisions as may be necessary
for the execution of the work or as required by the Engineer-in-Charge in respect of all labours
directly or indirectly employed for performance of the works and shall provide all facilities in
connections therewith. In case the vendor fails to make arrangements and provide necessary
facilities as aforesaid, the BPCL shall be entitled to do so and recover the cost thereof from
29. From the commencement to the completion of the works, the vendor shall take full
responsibility for the care thereof and of all the temporary works (defined as meaning all
temporary works of every kind required in or for the execution, completion or maintenance
of the works). In case damage, loss or injury shall happen to the works or to any part thereof
or to temporary works or to any cause whatsoever repair at his (Vendor's) own cost and make
good the same so that at the time of completion, the works shall be in good order and
condition and in conformity in every respect with the requirement of the contract and
Engineer-in-Charge's instructions.
30. While carrying out the job of fixing of toughen glasses of any area, the vendor has to complete
the job within the time frame of 2 days from the date of removal of old glasses from that area.
And during these two days, if required by BPCL, vendor has to provide partition or temporary
arrangement to avoid entrance of insects, dust, water in the offices.
31. In respect of all labour, directly or indirectly employed in the work for the performance of the
Vendor's part of this agreement, the vendor shall at his own expense arrange for all the safety
provisions as per relevant Safety Codes of C.P.W.D Bureau of Indian Standards, the Electricity
Act/I.E. Rules. The Mines Act and such other Acts as applicable.
32. The Vendor will be fully responsible for complying with all relevant provisions of the Contract
Labour Act and shall pay rates of Wages and observe hours of work/conditions of employment
according to the rules in force from time to time.
33. The Vendor will be fully responsible for complying with the provision including documentation
and submission of reports on the above to the concerned authorities and shall indemnify the
Corporation from any such lapse for which the Government will be taking action against them.
BPCL shall on a report having been made by an inspecting Office as defined in the Contract Labour
Regulations have the power to deduct from the money due to the Vendor any sum required or
estimated to be required for making good the loss suffered by a worker(s) by reasons of non-
fulfillment of conditions of contract for the benefit of workers no-payment of wages or of deductions
made from his or their wages which are not justified by the terms of contract or non-observance of
the said vendor's labour Regulation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
14779.pdf
pdf • 1.68 MB
BUDGETDOC_14779.pdf
pdf • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .