Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
10 Aug 2026, 2:00 pm
Superintending Engineer, C-III, RB, KMDA
Superintending Engineer, C-III, RB, KMDA
Repair and Renovation of various roads under Ward No 31 Bhatpara Municipality under Pathashree Urban II .( List of 01 no roads are attached in Annexure I) (PART B)
2026_KMDA_5016638_17
64/SE/C-III/RB/KMDA of 2026-27 Dt.- 10 /07/2026
Open Tender
CIVIL WORKS
Percentage
60 days
Bhatpara
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5.8 L
17 Jul 2026
17 Jul 2026
12 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | - | %Cu.M | - | - |
| 2 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (c) By mechanical means (without milling machine) : Cold milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under laying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-charge. (i) For depth upto 100mm | - | Sq.m | - | - |
| 3 | Fine Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. | - | Cu.M | 1 | - |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | Sqm | - | - |
| 5 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A) PCC Grade M20 ( I) Using concrete mixer | - | Cu.M | 1 | - |
| 6 | Supplying, fitting and placing un-coated HYSD Bar reinforcement in Bridge Foundation includin initialstraightening, straightening of coils bars, removal ofloose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1mm in size and conforming to IS 280 at everyintersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading,carriage of all steel materials complete as perdrawing and technical specifications and direction of Engineer-in-Charge . | 1 | MT | 0.6 | ₹0.6 |
| 7 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. | - | Sq.M | - | - |
| 8 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials. a) In 1:4 proportion. | - | Cu.M | - | - |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (ii) With 1:4 cement mortar (a) 20 mm thick plaster | - | Sqm | - | - |
| 10 | Supplying, fitting and fixing in position FRP/GRP/COMPOSITE UV stabilizer Manhole Cover with high abrasion surface of 7mm top thicknesswith density of 2KG/m³ - approved make with rim of approved make (Heavytype) (iv) 5 MT load bearing capacity round manhole cover provided with twolifter hooks fitted with matching frame of size Frame: 762 mm (30") | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.88 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.21 MB
Tendernotice_5.pdf
PDF • 3.18 MB
Tendernotice_6.pdf
PDF • 1.19 MB
BOQ_5086628.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].