Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹21.7 L
EMD Value
₹50,000
Closing Date
25 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer Roads Division Kollam
GENERAL-RM 2022-23 /Cluster 2/ One Year RC/Anchal/KLM-RM 2022-23 Zone 1 - One Year Running Contract for Various PWD Roads Under Roads Section Anchal in Kollam District - 4 road stretches for a length of 13.16 Km-WORK-General Civil Work
2023_PWD_562102_2
126/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
360 days
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
20 Jun 2023
18 Mar 2023
27 Mar 2023
18 Mar 2023
25 Mar 2023
18 Mar 2023
Amount
Appendix-A Reactive Maintenance(Initial Rectification work)
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD20391/2022-2023:Providing laying and rolling of MSS/close graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type A) aggregates using viscosity grade bitumen (VG 30) to the required line, grade and level to serve as wearing course on previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80- 100 KN capacity and finishing to required level and grade By manual means
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
Appendix-B Pre-monsoon works
OD20399/2022-2023:Engaging mazdoor for lowering side berms, clearing side berms, clearing side drains, removing silt from culverts, cutting earthen drains, diverting blocked water, ,removing the branches of trees leaned towards the road threatening pedestrians and traffic and removal of fallen trees or branches on the road clearing traffic blockage , stack the wood at suitable place and various works as directed by engineer in charge etc.
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD20400/2022-2023:Engaging Hydraulic Excavator of 1 cum bucket for various works as directed by the Officer in charge.
OD20401/2022-2023:Engaging tipper for conveying materials, debris to places as directed by departmental officers in charge.
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
Appendix-C Proactive/Preventive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
OD20393/2022-2023:Providing laying and rolling of MSS/close graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type A) aggregates using viscosity grade bitumen (VG 30) to the required line, grade and level to serve as wearing course on previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80- 100 KN capacity and finishing to required level and grade By manual means
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
5.6.1.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - I ( 19 mm nominal size )
OD20394/2022-2023:Filling up pot holes with instant repair pre-mix bituminous compound (25 kg bag) and compacting by ramming to get a compact surface including laying charges, transportation to site etc all complete - Department supply
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
OD20396/2022-2023:Engaging mazdoor for lowering side berms, clearing side berms, clearing side drains, removing silt from culverts, cutting earthen drains, diverting blocked water, cutting dangerous trees, branches of trees leaned towards the road threatening pedestrians and traffic and removal of fallen trees or branches on the road clearing traffic blockage , stack the wood at suitable place and various works as directed by engineer in charge etc.
OD20398/2022-2023:Engaging labour with passenger car not less than 1000cc for Conducting and reporting routine inspections upto 20 km per day for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officer at site. Additional Routine Inspection may be required in response to reports or complaints from the police , other authorities and the public as a result of major incidents, typhoon or flooding damages etc. and not measurable/payable. A promotion on the RI should be carried out either during or immediately following a period of wet weather.
Appendix-D Emergency works
OD20390/2022-2023:Engaging mazdoor for various emergency works as directed by the departmental Officer in charge.
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
Abhijith Surendran
Baby Varghese
Bidder Name
Baby Varghese
SHIJU.C.RAJU
Abhijith Surendran
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_837635.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .