Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | L1 | Accepted-AOC Accepted,BeingL-1 | |
| 2 | L2₹12.1 L+₹20,462.47 (1.73%)Rejected-Finance 0 STATION ROAD PARICHHA PARICHHA NEAR BANK OF INDIA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | L2 | Rejected-Finance Rejected,BeingL-2 | |
| 3 | L3₹12.3 L+₹44,767.60 (3.78%)Rejected-Finance | L3 | Rejected-Finance Rejected,BeingL-3 | |
| 4 | Rejected-Technical 16 RAZMAN BAZAR BC CANT LUCKNOW LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | UTTAR PRADESH | 226001 | - | Rejected-Technical Being Non Responsive |
| Sl No | Description | Qty | Unit | MEENU PARVAJURF L1 | PURNAGIRI CONSTRUCTION CO. PVT. LTD. L3 | M/S SINGH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorney jungle without uprooting as per directed by Engineer in charge. | 2,400 | Sqm | 5.01 ₹12,024 | 5 ₹12,000 Lowest | 5.1 ₹12,240 |
| 2.00 | Earth work in silt clearance including lift up to 1.50m and lead up to 30.00 mincluding ramming and dressingby manual labour or mechine.The earth from silt clearance to be used in side imbankment or to be disposed off at spoil bank or as per directed by Engineer in charge | 2,298 | M3 | 90.91 ₹2,08,911.18 | 90 ₹2,06,820 Lowest | 92.45 ₹2,12,450.1 |
| 3.00 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30m initial lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge | 22.95 | M3 | 68.32 ₹1,567.94 Lowest | 70 ₹1,606.5 | 69.5 ₹1,595.03 |
| 4.00 | Laying C.C.(1:3:6) with P.C.C. Cement, coarse sand and Stone ballast 20 to 40mm also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge. | 3.15 | M3 | 6,275.26 ₹19,767.07 Lowest | 6,600 ₹20,790 | 6,381 ₹20,100.15 |
| 5.00 | Class 10 brick work in 1:4 cement and sand mortar up to 3 m. lift and 60 m lead of material also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge. | 13.9 | M3 | 5,603.28 ₹77,885.59 Lowest | 5,900 ₹82,010 | 5,697.75 ₹79,198.73 |
| 6.00 | Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar up to 3 m. hight including cost of all labour, material and T & P etc. | 48.9 | Sqm | 166.36 ₹8,135 Lowest | 175 ₹8,557.5 | 169.15 ₹8,271.44 |
| 7.00 | Random rubble masonary work in (1:4) with Cement, coarse sand and boulder also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge. | 29.1 | M3 | 5,680.48 ₹1,65,301.97 Lowest | 5,900 ₹1,71,690 | 5,776.25 ₹1,68,088.88 |
| 8.00 | Supplying & laying dry stone boulder (Size 20-40 kg) in 8 S.W.G. G.I. double knot G.I. Wire crate size 5.0x0.50x0.50m mesh size 15cm.x15cm. including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge. | 28 | M3 | 4,757.05 ₹1,33,197.4 Lowest | 5,000 ₹1,40,000 | 4,837.26 ₹1,35,443.28 |
| 9.00 | Supplying and laying Dry stone pitching hand packed also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge. | 161 | M3 | 2,761.49 ₹4,44,599.89 Lowest | 2,900 ₹4,66,900 | 2,808.1 ₹4,52,104.1 |
| 10.00 | Providing & Dumping boulder 20 to 40 kg. in scoured portion. including cost of materials labour Tools and Plants etc as required for proper completion of work. | 43.1 | M3 | 2,387.02 ₹1,02,880.56 Lowest | 2,500 ₹1,07,750 | 2,427.25 ₹1,04,614.48 |
Tender Value
₹12.5 L
EMD Value
₹26,000
Closing Date
12 Jan 2026, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Hardoi Shakha Nahar ke km. 34.711 per Sthit Drainage Saifan ke Saaf-Safai Avm surkshatmak Karya.
2025_UPIDC_1103075_1
E-Tender Notice No 06/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
30 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹26,000
Yes
3 Feb 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Cleaning thick bushes and thorney jungle without uprooting as per directed by Engineer in charge.
Earth work in silt clearance including lift up to 1.50m and lead up to 30.00 mincluding ramming and dressingby manual labour or mechine.The earth from silt clearance to be used in side imbankment or to be disposed off at spoil bank or as per directed by Engineer in charge
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30m initial lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge
Laying C.C.(1:3:6) with P.C.C. Cement, coarse sand and Stone ballast 20 to 40mm also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge.
Class 10 brick work in 1:4 cement and sand mortar up to 3 m. lift and 60 m lead of material also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge.
Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar up to 3 m. hight including cost of all labour, material and T & P etc.
Random rubble masonary work in (1:4) with Cement, coarse sand and boulder also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge.
Supplying & laying dry stone boulder (Size 20-40 kg) in 8 S.W.G. G.I. double knot G.I. Wire crate size 5.0x0.50x0.50m mesh size 15cm.x15cm. including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge.
Supplying and laying Dry stone pitching hand packed also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Providing & Dumping boulder 20 to 40 kg. in scoured portion. including cost of materials labour Tools and Plants etc as required for proper completion of work.
Finishing walls with water proofing cement paint of approved made such as super snowcem, Durrocem, Robiacem Guttucem, supermen quality of required shade on uncoated wall surface (two coat) over one coat white cement primer to give even shades after throughly brushing the surface of remove all dirt and remains of loose powdered material also including all cost of material, labour & T&P etc. for proper completion of work as per directed by Engineer in charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2034123.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .