Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance BHIWANI | BHIWANI | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.3 LAdmitted-Finance | ₹2.3 L | L2 | Admitted-Finance |
| 3 | L3₹2.4 LAdmitted-Finance MURUD MURUD BK NEAR BY CHATRAPATI SHIVAJI MAHARAJ CHOUK MURUD LATUR MAHARASHTRA 413510 | LATUR | MAHARASHTRA | 413510 | ₹2.4 L | L3 | Admitted-Finance |
| 4 | L4₹2.4 LAdmitted-Finance | ₹2.4 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | arun sales corporation L4 | balaji machinery store L3 | TECHNOFEB ENGINEERS L1 | R.B.ENGINEERING WORKS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Rewinding of 03 phase, 415V 985 RPM induction motor inclusive of material with credit of brunt scrap having capacity 150 HP
Rewinding works includes-
1. Dismantling of electric motor and old burnt material take off.
2. Cleaning the slots by air/petrol pressure.
3. Framing of coils with new electrolytic copper conductor as per original shape and size & providing new copper coil of as per existing gauge of BIC mark with 'F' class insulation.
4. Providing and fixing of epoxy glass slot wedges tying and lacing of coils with glass tape.
5. Silver brazing of connection joints and the formation of 03 phase connection leads and fixing the same with thimbles.
6. Varnishing and baking of motor with Dr. Beck Varnish, Backtole spring and drying of stator winding with complete testing.
7. Cleaning of rotor by Material take off and varnishing & baking alongwith dynamic balancing of rotor, checking & refixing of both end bearings and greasing the same (complete job),
The above rates are inclusive of credit of the old burnt copper coils in Motors at present market rate. | 3 | Nos. | 80,500 ₹2.4 L | 79,900 ₹2.4 L | 77,317 ₹2.3 L | 78,300 ₹2.3 L |
Tender Value
₹2.4 L
EMD Value
₹4,860
Closing Date
5 May 2026, 11:00 amClosed
Executive Engineer LWS Mech Div Charkhi Dadri
Executive Engineer LWS Mech Div Charkhi Dadri
Rewinding of 03 Nos. 3 phase 415V 985 RPM electric motors of capacity 150 HP for Pump House No. 1 and 2 of Badhwana System
2026_HRY_518140_5
DNIT No. 2091-2109/37-A dated 28.04.2026
Open Tender
Supply, Erection and Commissioning
Charkhi Dadri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹4,860
Yes
26 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Rewinding of 03 phase, 415V 985 RPM induction motor inclusive of material with credit of brunt scrap having capacity 150 HP
Rewinding works includes-
1. Dismantling of electric motor and old burnt material take off.
2. Cleaning the slots by air/petrol pressure.
3. Framing of coils with new electrolytic copper conductor as per original shape and size & providing new copper coil of as per existing gauge of BIC mark with 'F' class insulation.
4. Providing and fixing of epoxy glass slot wedges tying and lacing of coils with glass tape.
5. Silver brazing of connection joints and the formation of 03 phase connection leads and fixing the same with thimbles.
6. Varnishing and baking of motor with Dr. Beck Varnish, Backtole spring and drying of stator winding with complete testing.
7. Cleaning of rotor by Material take off and varnishing & baking alongwith dynamic balancing of rotor, checking & refixing of both end bearings and greasing the same (complete job),
The above rates are inclusive of credit of the old burnt copper coils in Motors at present market rate. | 3 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.07 MB
BOQ_597029.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid