Loading…
Loading…
Tender Value
₹30.2 L
EMD Value
₹60,383
Closing Date
27 Jul 2026, 6:00 pmDue tomorrow
UNIT HEAD RIICO JODHPUR
MINI UDHYOG BHAWAN, NEW POWER HOUSE ROAD, JODHPUR
Maintenance of Fire Station at Ind. Area Basni Ph-II, Jodhpur
2026_RIICO_575455_1
08/2026-27/2
Open Tender
Civil Works
Percentage
90 days
IND AREA BASNI PH-II
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
RIICO
₹60,383
17 Jul 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | In cement mortar. | - | Cum | 751 | - |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge., In cement mortar. | 1 | Cum | 538 | ₹537.46 |
| 3 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead. | - | Kg | 2 | - |
| 4 | Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres | - | Kg per Mtr. | 0.5 | - |
| 5 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge., 1: 3: 6 or richer mix. | - | Cum | 637 | - |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | - | Cum | 175 | - |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size). | - | Cum | 4,544 | - |
| 8 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:, Cement Mortar 1:4 ( 1-Cement : 4-Sand). | - | Cum. | 3,182 | - |
| 9 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 1 | Cum | 4,934 | ₹4,929.07 |
| 10 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. M20 grade Nominal Mix / Design Mix | - | Cum | 5,609 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1023350.xls
BOQ • 0.39 MB
add_doc_NEW2025.pdf
Other Document • 1.05 MB
TD.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].