Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.1 L+₹26,111 (9.15%)Rejected-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹3.1 L+₹26,111 (9.15%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 L+₹27,901 (9.78%)Rejected-Finance | ₹3.1 L+₹27,901 (9.78%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 L+₹31,296 (11.0%)Rejected-Finance | ₹3.2 L+₹31,296 (11.0%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.2 L+₹31,706 (11.1%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | ₹3.2 L+₹31,706 (11.1%) | L5 | Rejected-Finance L5 |
Tender Value
₹3.7 L
EMD Value
₹7,500
Closing Date
9 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Restoration of rian damages on Circlular road around NAC Ghumarwin Court complex Tekri to Kulahru km 0/00 to 2/00 SH Providing and laying cement concrete pavement at Km 1/715 to 1/795
2026_PWD_133042_14
16181-87dt. 31/3/2026
Open Tender
Civil Works
Percentage
30 days
GHUMARWIN
AS PER SBD
13 documents required · 13 mandatory
₹350
₹7,500
28 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
2 Apr 2026 - 9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and MORD technical specification 2014 clause 305 ( Three zero five ) and as per direction of the Engineer-in-Charge .The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per cubic metre | - | - |
| - | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per cubic metre | - | - |
| - | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation complete as per drawing and MORD tecnical specification clauses 802, 803, 1202 & 1203. Nominal Mix 1:4:8 (one cement is to four sand is to eight crushed graded stone aggregate) 40mm (forty millimeter) as per direction of Engineer-in-Charge including carriage of materials with with in all leads and lifts and other incidental. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per Cubic metre | - | - |
| - | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5:3(One cement is to one point five coarse sand is to three graded stone aggregate 20 mm (twenty milimetre) nominal size as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per cubic metre | - | - |
| - | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required (In gratings. frames, guard bar, ladder, railings, brackets, gates and similar works including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other construction work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per Kilogramme | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
SBD14.pdf
Tender Documents • 3.43 MB
BOQ_196818.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .