| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | ₹12.7 L | L1 | Accepted-AOC Admitted |
| Sl No | Description | Qty | Unit | SURESH KUMAR M G L1 |
|---|---|---|---|---|
| 1.00Retaining wall gate and Arch | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 14.27 | cum | 359.72 ₹5,133.20 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.48 | cum | 7,932.89 ₹11,716.88 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.27 | cum | 10,488.77 ₹86,689.68 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.8 | cum | 12,772.18 ₹22,989.92 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.69 | cum | 13,442.14 ₹49,641.82 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,147.7 | kilogram | 110.43 ₹2.4 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 20.22 | sqm | 386.16 ₹7,809.70 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 24 | sqm | 1,008.55 ₹24,205.20 |
| 1.01 | 5.9.21:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumers and cantilevers with water proof ply 12 mm thick. | 17.4 | sqm | 877.1 ₹15,261.54 |
Tender Value
₹12.7 L
EMD Value
₹31,779
Closing Date
15 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer,Pwd Buildings subdivi
Office of the Assistant Executive Engineer,Pwd Buildings subdivision Chengannur
LAC-ADS-2025-26- Chengannur LACConstruction of new entrance gate and arch at Rest House, Chengannur-General Civil Work
2025_PWD_797976_2
PWD/BLDG/TR/14636/2024_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
Chengannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,779
Yes
7 Jan 2026
7 Oct 2025
18 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1343272.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid