Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.8 L+₹13,224 (5.02%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹2.4 L
EMD Value
₹6,009
Closing Date
14 Dec 2022, 2:00 pmClosed
Assistant Engineer
Thalayazham Assistant Engineer Office
Annual Plan-THALAYAZHAM GP2022-23 Pro no 03/23 Construction of Orumuttu-no 03/23in ward1112-General Civil Work
2022_LSGD_536439_1
LSGD//TR/63608/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Thalayazham
Please refer Tender documents.
6 documents required · 6 mandatory
₹555
Yes
₹6,009
Yes
30 Jan 2023
5 Dec 2022
16 Dec 2022
5 Dec 2022
14 Dec 2022
5 Dec 2022
Amount
Construction of orumuttu
OD106659/2022-2023:Putting up earthern bund having a top width of 1.00m,bottom width of 2.00m and height 2.50m using 1/2 split coconut post 4 rows;driving down 60cm centre to centre and 1.50m below GL tying with coir yarn and 1/2 split coconut horizontal piece 4 rows on both sides,cross ties 1.00m apart and struts on both sides at 2.00m apart and screening with 1/3 split arrecanut reepers 30 cm square mesh and with double new coconut cadjan and all tying properly with GI fencing wire and filling inside with stiff clay of approved quality as water proof layer etc.complete
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD225938/2022-2023:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
ARATHY CONSTRUCTIONS
Bidder Name
T P PHILIPOSE
ARATHY CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_779508.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .