Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | L1 | Accepted-AOC Low | |
| 2 | L2₹13.0 L+₹8,618.54 (0.67%)Accepted-AOC | L2 | Accepted-AOC High |
| Sl No | Description | Qty | Unit | S VETTRISELVAN L1 | S KILLIVALAVAN L2 |
|---|---|---|---|---|---|
| 1.00 | Strengthening of the Road from Mariyamman Kovil to Erikkadu - A.K. Salakkadu Road in Pillapalayam Km 0/0-0/450. Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 450 | Sqm | 21.84 ₹9,828 Lowest | 25 ₹11,250 |
| 2.00 | Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content | 81 | Cum | 336.06 ₹27,220.86 Lowest | 340 ₹27,540 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 206.25 | Cum | 2,107.95 ₹4,34,764.69 Lowest | 2,120 ₹4,37,250 |
| 4.00 | Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,375 | Sqm | 83.55 ₹1,14,881.25 Lowest | 85 ₹1,16,875 |
| 5.00 | Providing and laying Tack coat over WMM surface using 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.marea including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 1,375 | Sqm | 19.8 ₹27,225 Lowest | 20 ₹27,500 |
| 6.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 41.25 | Cum | 11,493.01 ₹4,74,086.66 Lowest | 11,500 ₹4,74,375 |
| 7.00 | Provision for HM Stone | 2 | Nos | 780 ₹1,560 Lowest | 790 ₹1,580 |
| 8.00 | Provision for Name Board etc complete. | 1 | Nos | 4,500 ₹4,500 Lowest | 5,000 ₹5,000 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,96,932 ₹1,96,932 Lowest | 1,98,247 ₹1,98,247 |
Tender Value
₹13,030
EMD Value
₹13,030
Closing Date
7 Aug 2025, 3:00 pmClosed
Block Developement Officer (B.P)
Panchayat Union Office
Strengthening of the Road from Mariyamman Kovil to Erikkadu - A.K. Salakkadu Road in Pillapalayam Km 0/0-0/450
2025_RDTN_587675_1
A3/1611/2025 Pillapalayam
Open Tender
Civil Works
Fixed-rate
Pillapalayam
Please refer Tender documents.
5 documents required · 5 mandatory
₹1
Yes
₹13,030
Yes
8 Aug 2025
1 Aug 2025
7 Aug 2025
1 Aug 2025
7 Aug 2025
1 Aug 2025
Amount
Strengthening of the Road from Mariyamman Kovil to Erikkadu - A.K. Salakkadu Road in Pillapalayam Km 0/0-0/450. Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface using 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.marea including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM Stone
Provision for Name Board etc complete.
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
S KILLIVALAVAN (BID ID -1422417)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .