Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC CHITTATHARA HOUSE MANAKKAPPADY KARUMALLOOR P O | L1 | Accepted-AOC First lowest | |
| 2 | L2₹3.0 L+₹15,319.15 (5.38%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
₹3.0 L
EMD Value
₹7,500
Closing Date
6 Mar 2026, 11:00 amClosed
Executive Engineer TDB,Kottayam
Office of the Executive Engineer, TDB, Kottayam- 686001
Perincherymadom Devaswom-Paravur group-Annual maintenance to the temple structures in connection with festival in 1201M. -General Civil Work
2026_TDB_842447_1
TDB/EEK/ET-166/2025-26
Open Tender
Civil Works - Others
Percentage
20 days
Paravur
Please refer Tender documents.
4 documents required · 4 mandatory
₹708
₹7,500
5 Oct 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
6 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1annual maintenance | |||||
| 1.01 | Removing white or colour wash by scrapping and sand papering and preparing the
surface smooth including necessary repairs to scratches etc. complete. | 1,200 | M2 | 20.48 | ₹24,576 |
| 1.02 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two
or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface | 1,850 | M2 | 139.96 | ₹2,58,926 |
| 1.03 | Painting with synthetic enamel paint of approved brand and manufacture of required
colour to give an even shade :One or more coats on old work | 75 | M2 | 108.55 | ₹8,141.25 |
| 1.04 | Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set
including conveyance to site and erection,cost of fuel, lubrication oil and other stores,
pay of staff etc complete | 6 | Hrs | 455.83 | ₹2,734.98 |
| 1.05 | Labour charges cleaning the well after bailing out water , by removing water weeds,
over growth , slush, silt, any other waste materials if any : man coolie engaged | 2 | Nos | 1,082.18 | ₹2,164.36 |
| 1.06 | Providing and fixing single scaffolding system on the exterior side, upto 5m height
made with 40 mm dia M.S. tube, 1.5 m centre to centre, horizontal & vertical
tubes joining with M.S. clamps and M.S. staircase system in the scaffolding for
working platform etc.and maintaining it in a serviceble condition for the required
duration as approved and removing it there after. | 50 | M2 | 64.9 | ₹3,245 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1421785.xls
BOQ • 0.38 MB
1preagmntformat.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .