Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.5 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.8 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JOSEPH V J L1 | M M THOMAS L3 | P T SEBASTIAN L2 | V P GOPI L4 | NIDHIN M A L6 | TIMEAHEAD CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Replacement of Acid/Oleum Drain Tank, Repair of Buffer Tank and repair/replacement of Pipe Rack supports at FACT-UC. | |||||||||
| 1.01 | Fabrication and erection of Acid/Oleum Drain Tank complete with all fittings and accessories as per attached Drawing No. PC-224 R0, including dismantling and removal of existing tank.
Material :SS 316L | 1 | NO | 1,48,000 ₹1,74,640 Lowest | 3,00,000 ₹3,54,000 | 1,69,000 ₹1,99,420 | 3,00,000 ₹3,54,000 | 3,85,000 ₹4,54,300 | 2,60,000 ₹3,06,800 |
| 1.02 | Repair/replacement of damaged portions of Buffer Tank at NAS Plant including fabrication, welding and painting as directed by Engineer-in-Charge.
Material: MS
Thickness:8-12mm
Plate height (to be repaired/replaced):100-200mm | 4 | M2 | 64,000 ₹75,520 | 72,000 ₹84,960 | 1,24,900 ₹1,47,382 | 40,800 ₹48,144 Lowest | 1,00,000 ₹1,18,000 | 60,000 ₹70,800 |
| 1.03 | Dismantling and removal of damaged supports and unused SS/MS pipes of various sizes from pipe rack near Scrap Yard at all elevations as directed by Engineer-in-Charge. | 25 | MT | 50,000 ₹59,000 Lowest | 62,500 ₹73,750 | 67,500 ₹79,650 | 50,000 ₹59,000 Lowest | 50,000 ₹59,000 Lowest | 1,50,000 ₹1,77,000 |
| 1.04 | Fabrication, painting and erection of new pipe supports for pipe rack near Scrap Yard as per site requirement and instructions of Engineer-in-Charge. | 2 | MT | 70,000 ₹82,600 | 24,000 ₹28,320 Lowest | 65,800 ₹77,644 | 80,000 ₹94,400 | 60,000 ₹70,800 | 30,000 ₹35,400 |
| 1.05 | Transportation of scrap materials from various locations within FACT-Udyogamandal Division to FACT Scrap Yard after weighment. | 26 | MT | 52,000 ₹61,360 | 65,000 ₹76,700 | 44,200 ₹52,156 | 78,000 ₹92,040 | 2,600 ₹3,068 Lowest | 78,000 ₹92,040 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
4 Jul 2026, 12:00 pmClosed
AGM(P and P)UC
ASSISTANT GENERAL MANAGER PROJECTS AND PLANNING PD ADMINISTARTION FACT
Replacement of Acid/Oleum Drain Tank, Repair of Buffer Tank and repair/replacement of Pipe Rack supports at FACT-UC
2026_FACT_913860_1
3012/2026-2027/E33731
Limited
Miscellaneous Works
Item Rate
90 days
UDYOGAMANDAL, FACT
As per tender documents
5 documents required · 5 mandatory
₹0
₹5,000
Yes
6 Jul 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacement of Acid/Oleum Drain Tank, Repair of Buffer Tank and repair/replacement of Pipe Rack supports at FACT-UC. | |||||
| 1.01 | Fabrication and erection of Acid/Oleum Drain Tank complete with all fittings and accessories as per attached Drawing No. PC-224 R0, including dismantling and removal of existing tank.
Material :SS 316L | 1 | NO | - | - |
| 1.02 | Repair/replacement of damaged portions of Buffer Tank at NAS Plant including fabrication, welding and painting as directed by Engineer-in-Charge.
Material: MS
Thickness:8-12mm
Plate height (to be repaired/replaced):100-200mm | 4 | M2 | - | - |
| 1.03 | Dismantling and removal of damaged supports and unused SS/MS pipes of various sizes from pipe rack near Scrap Yard at all elevations as directed by Engineer-in-Charge. | 25 | MT | - | - |
| 1.04 | Fabrication, painting and erection of new pipe supports for pipe rack near Scrap Yard as per site requirement and instructions of Engineer-in-Charge. | 2 | MT | - | - |
| 1.05 | Transportation of scrap materials from various locations within FACT-Udyogamandal Division to FACT Scrap Yard after weighment. | 26 | MT | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TermsandconditionsE33731.pdf
Tender Documents • 15.79 MB
BOQ_960389.xls
BOQ • 0.26 MB
Compliance.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].