Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹353.80 (0.19%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,724
Closing Date
25 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
C/O B Path With p Bund from H/O Syed Gulab Shah to onwards w4 under ADP (PRI) for year 2026-27 ,P/H DACHI , Block- Paranpillan
2026_RDPR_319384_3
181/Xen/Rew/Bla/2026-27 Dated 04/08/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹3,724
3 Sept 2026
4 Aug 2026
26 Aug 2026
4 Aug 2026
25 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 39.6 | sqm | - | - |
| 2 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches excluding | 4.77 | cum | - | - |
| 3 | Providing and laying in position plain cement concrete 1:4:8 mix ratio M 7.5 using 20 mm nominal size agg excluding cost of shuttering i/c curing | 2.48 | cum | 1 | ₹2.48 |
| 4 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M10 using 20 mm nominal size agg incl cost of shuttering i/c curing | 20.59 | sqm | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for foundation | 3.72 | sqm | - | - |
| 6 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) .incl all carraiges | 26.02 | sqm | - | - |
| 7 | Carriage of materials from the approved sources to work site by mechnical Transport. | 31.2 | cum | - | - |
| 8 | P/F of information sign board and site photographs. | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1057805.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1057805.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .