Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹63.2 LAdmitted-Finance | +26.00% | ₹63.2 L | H1 | Admitted-Finance |
| 2 | H2₹56.8 L−₹6.5 L (10.2%)Admitted-Finance | +13.14% | ₹56.8 L−₹6.5 L (10.2%) | H2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
₹35.9 Cr
EMD Value
₹36.9 L
Closing Date
28 Aug 2025, 5:00 pmClosed
CHIEF MECHANICAL ENGINEER
Chief Mechanical Engineer, Mechanical Electrical Engineering Department, 2nd Floor, Administrative Office Building, Visakhapatnam Port Authority, Visakhapatnam 530 035.
Up-gradation Development of Infrastructure Facilities in Ship Repairs activity at existing ORS Dry Dock and Slipway of Visakhapatnam Port Authority from the eligible shipbuilding yards / ship repairers operating Dry Docks / Major Ship repairing wo
2025_VPT_244141_1
45/2025-26/IMEE/MOF/ DRY DOCK/ Dt.06.08.2025
Open Tender
Marine Works
Works
5475 days
VISAKHAPATNAM PORT AUTHORITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Yes
₹36.9 L
Yes
CHIEF MECHANICAL ENGINEER CONFERENCE HALL
1 Oct 2025
6 Aug 2025
29 Aug 2025
6 Aug 2025
28 Aug 2025
6 Aug 2025
18 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | ORS DRY DOCK Charges from 1st day to 7th day for Foreign going Vessels | 1 | Day | 4,031 | ₹4,031 |
| 1.02 | ORS DRY DOCK Charges from 8th day to 14th day for Foreign going Vessels | 1 | Day | 6,046 | ₹6,046 |
| 1.03 | ORS DRY DOCK Charges from 15th day onwards for Foreign going Vessels | 1 | Day | 8,061 | ₹8,061 |
| 1.04 | ORS DRY DOCK Charges from 1st day to 7th day for Coastal Vessels | 1 | Day | 2,02,891 | ₹2,02,891 |
| 1.05 | ORS Dry Dock Charges from 8 th to 14 th
day for Coastal Vessels | 1 | Day | 3,04,337 | ₹3,04,337 |
| 1.06 | ORS DRY DOCK Charges from 15th day onwards for Coastal Vessels | 1 | Day | 4,05,783 | ₹4,05,783 |
| 1.07 | Dock Block preparation charges for Flat Bottom vessels (Composite Rate) upto 50 m length of vessels | 1 | Day | 3,06,000 | ₹3,06,000 |
| 1.08 | Dock Block preparation charges for Flat Bottom vessels (Composite Rate) above 50 m length of vessels | 1 | Day | 3,82,500 | ₹3,82,500 |
| 1.09 | Dock Block preparation charges for Flat Bottom vessels (Composite Rate) above 100 m length of vessels | 1 | Day | 4,59,000 | ₹4,59,000 |
| 1.1 | Dock Block preparation charges for Shaped vessels (Composite Rate) upto 50 m length of vessels | 1 | Day | 5,32,200 | ₹5,32,200 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_278903.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .