Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹27.4 L+₹1.3 L (4.95%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹27.6 L+₹1.5 L (5.61%)Admitted-Fee/PreQual/Technical/Finance M K ENGINEERS AND CONTRACTORS PARASSALA TVPM | PARASSALA | THIRUVANANTHAPURAM | KERALA | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹28.0 L+₹1.9 L (7.16%)Admitted-Fee/PreQual/Technical/Finance PUTHALATHU KIZHAKKRTHARA PADA S | KOTTAYAM | KERALA | 686001 | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹28.1 L+₹2.0 L (7.72%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | CITIZENS LABOUR FORCES DEVELOPMENT CO OPERATIVE SOCIETY LTD NO T 2185 L8 | S. SYAM L6 | RAVI S L5 | MANOJ KUMAR S (M.K.Engineers And Contractor) L3 | ABDUL MAHROOF C Z L7 | SURESH KUMAR.M L1 | RADHAKRISHNAN R L4 | ANIL KUMAR P L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Compoundwall | |||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 77 | cum | 356.69 ₹27,465.13 | 285 ₹21,945 | 304 ₹23,408 | 150 ₹11,550 Lowest | 300 ₹23,100 | 172.91 ₹13,314.07 | 303.37 ₹23,359.49 | 297.12 ₹22,878.24 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9 | cum | 7,865.9 ₹70,793.1 | 6,420 ₹57,780 | 6,730 ₹60,570 | 4,750 ₹42,750 Lowest | 6,800 ₹61,200 | 7,998.07 ₹71,982.63 | 6,690.07 ₹60,210.63 | 6,552.22 ₹58,969.98 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.72 | cum | 9,157.98 ₹89,015.57 | 7,460 ₹72,511.2 Lowest | 7,836 ₹76,165.92 | 8,000 ₹77,760 | 8,600 ₹83,592 | 9,338.34 ₹90,768.66 | 7,789.01 ₹75,709.18 | 7,628.51 ₹74,149.12 |
| 1.00 | OD146365/2026-2027:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 54 | cum | 7,157.22 ₹3,86,489.88 | 7,378.54 ₹3,98,441.16 | 6,123 ₹3,30,642 | 6,650 ₹3,59,100 | 6,800 ₹3,67,200 | 5,897.06 ₹3,18,441.24 Lowest | 6,087.3 ₹3,28,714.2 | 5,961.86 ₹3,21,940.44 |
| 1.00 | OD146367/2026-2027:Random rubble masonry with hard stone in foundation and plinth (department rubble) including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 54 | cum | 5,488.6 ₹2,96,384.4 | 5,658.35 ₹3,05,550.9 | 4,696 ₹2,53,584 | 4,100 ₹2,21,400 | 3,700 ₹1,99,800 Lowest | 4,176.87 ₹2,25,550.98 | 4,668.14 ₹2,52,079.56 | 4,571.95 ₹2,46,885.3 |
| 1.01 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 120 | cum | 6,283.5 ₹7,54,020 | 6,477.83 ₹7,77,339.6 | 5,375 ₹6,45,000 | 6,500 ₹7,80,000 | 7,300 ₹8,76,000 | 5,644.5 ₹6,77,340 | 5,344.21 ₹6,41,305.2 | 5,234.09 ₹6,28,090.8 Lowest |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 218.79 | kg | 185.46 ₹40,576.79 | 148 ₹32,380.92 Lowest | 178 ₹38,944.62 | 160 ₹35,006.4 | 180 ₹39,382.2 | 186.63 ₹40,832.78 | 157.74 ₹34,511.93 | 154.49 ₹33,800.87 |
| 1.01 | 16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire | 150 | metre | 24.41 ₹3,661.5 | 20 ₹3,000 Lowest | 20 ₹3,000 Lowest | 300 ₹45,000 | 150 ₹22,500 | 25.16 ₹3,774 | 20.76 ₹3,114 | 20.33 ₹3,049.5 |
| 1.01 | 13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand) | 2,400 | sqm | 366 ₹8,78,400 | 270 ₹6,48,000 Lowest | 312 ₹7,48,800 | 290 ₹6,96,000 | 320 ₹7,68,000 | 283.57 ₹6,80,568 | 311.29 ₹7,47,096 | 304.87 ₹7,31,688 |
Tender Value
₹33.9 L
EMD Value
₹50,000
Closing Date
7 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Buildings Division Thiruvananthapuram
Deposit Sree Chithra Home Thiruvananthapuram Re-construction and maintenance of boundary wall and other allied works inside Sree Chitra Home compound Civil work
2026_PWD_884348_1
TR/5082/2022_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
12 Nov 2026
31 Oct 2026
11 Nov 2026
31 Oct 2026
7 Nov 2026
31 Oct 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Compoundwall | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 77 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9 | cum | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.72 | cum | - | - |
| 1.004 | OD146365/2026-2027:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 54 | cum | - | - |
| 1.005 | OD146367/2026-2027:Random rubble masonry with hard stone in foundation and plinth (department rubble) including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 54 | cum | - | - |
| 1.006 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 120 | cum | - | - |
| 1.007 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 218.79 | kg | - | - |
| 1.008 | 16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire | 150 | metre | - | - |
| 1.009 | 13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand) | 2,400 | sqm | - | - |
stage.html
html • 0.03 MB
finance_1506683.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1506683.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .