Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.0 LAccepted-AOC | ₹23.0 L | 1 | Accepted-AOC LOWEST BIDDER |
| 2 | 2₹24.2 L+₹1.1 L (4.99%)Rejected-AOC DOOR NO 5 155B KOTHARATHU BUILDING NEAR ALPHA PALIATIVE CARE VENGANELLUR CHEKKAKKARA THRISSUR KERALA 680586 | THRISSUR | KERALA | 680586 | ₹24.2 L+₹1.1 L (4.99%) | 2 | Rejected-AOC SECOND LOWEST |
| 3 | 3₹24.6 L+₹1.6 L (6.99%)Rejected-Finance | ₹24.6 L+₹1.6 L (6.99%) | 3 | Rejected-Finance Third lowest |
| 4 | 4₹25.1 L+₹2.1 L (9.04%)Rejected-Finance KADAYIL DEW 1ST FLOOR DOOR NO 1888 NH ROAD SREEKARYAM PO TRIVANDRUM 695017 | THIRUVANANTHAPURAM | KERALA | 695017 | ₹25.1 L+₹2.1 L (9.04%) | 4 | Rejected-Finance Fourth Lowest |
Tender Value
₹19.5 L
EMD Value
₹29,400
Closing Date
22 Jun 2022, 4:00 pmClosed
Assistant Engineer
Electrical Section, Vettukad P.O, Puthur (Thrissur), Thrissur 680014
SOP TO THE DIRECTOR ZOOLOGICAL PARK PUTHUR PART II-DRAWING 1.65 KM HT ABC ON TURNKEY BASIS under Electrical Section Puthur
2022_KSEB_488958_1
01/ES-PTR/2022-23/05.05.2022
Open Tender
Electrical Works
Turn-key
90 days
33kv Puthur Substation to Puthur Zoological park
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
Yes
₹29,400
Yes
13 Jul 2022
9 May 2022
24 Jun 2022
9 May 2022
22 Jun 2022
11 May 2022
Supplying and stringing of HT ABC of size 3x120 sqmm + 95 sqmm (insulated messenger wire) along the route length on existing PSC / A pole supports, anchoring of messenger wire on Eye Hooks/SS straps and suspension clamps, giving connections at existing AB/DT points using proper end termination materials, providing suitable extension arrangements to maintain the necessary clearances and sags with provisions for loops if found necessary, earthing, providing surge arrestors, testing and commssioning including supply of all accessories like Anchor Clamps/Dead End Clamps, Suspension Clamps, Cable End Terminations, MVTs, Cable Ties, SS Buckle and Strap, Pipe Earthing using 40mm Dia, 2.5m long GI pipe if found necessary, hire, frieght, insurance charges, all taxes, incidental charges, cutting and removing tree branches wherever necessary and 3 years warranty with fault repairs and spares supply on TURNKEY basis.
ITHAL ENGINEERING GROUPS
netconnecttechnology
Genisys Engineers and Contractors
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_702412.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .