| # | Company | Amount |
|---|---|---|
| 1 | ₹45.6 Cr |
Tender Value
₹52.1 Cr
EMD Value
₹62.1 L
Closing Date
11 Mar 2026, 3:00 pmClosed
Dhananjay Kumar Sinha
SE, Buxar
Flood Control Circle, Buxar
EJAZ KALIM
CE, Patna
Anti Erosion work on right bank of river Ganga in front of 58 .00 KM to 59.20 km of BKGE near village Gangapur, Bhusawala, Nandpur & Damodarpur (Jawainiya) AGENDA NO-244/38/2026
126803
NIT-02/2025-26/FCD, BUXAR
Open Tender
CIVIL
Buxar
• REGISTRATION NUMBER
• Legal Status of Bidder
• Principal place of Business
• Power of attorney of signatory Bid
• Total value of civil engineering construction work performed in F.Y. - 2020-21
• Total value of civil engineering construction work performed in F.Y. - 2021-22
• Total value of civil engineering construction work performed in F.Y. - 2022-23
• Total value of civil engineering construction work performed in F.Y. - 2023-24
• Total value of civil engineering construction work performed in F.Y. - 2024-25
• Work Experience of Similar nature Satisfactory completed at least one similar work of value not less than 10% of estimated value of contract 520.85 (Rs in Lakhs)
• Minimum Quantities of work done as prime contractor in any one year during last five years.
Earth work (Excavation, filling, back filling in cum) - 28067.00
Protection works (Pitching/ Crating/ Soling with Boulder/Brick/Geobag/E.C.bag/ Nylon crates/ Gabians etc. combined quantities in cum) - 37050.70
Cement Concrete (P.C.C., R.C.C., P.S.C, etc. combined quantities in cum) - 59.62
• Availability of key items of Contractor's Equipment
Type of Equipment Nos. Max. Age
Pocklain / Excavator / Front End Loader 6 8
Tractor / Tipper / Dumper 30/15/15 5/6/6
Concrete Mixes with Integral Weigh Batching Facility 1 5
• Key Personnel
"Project Manager / BE Civil + 10 years experience (5years as manager) or retired EE" - 1
Site Engineer / B.E. Civil + 07 Years Exp. (3 years in Irrigation works) or retired A.E. - 4
"Quantity Surveyor / BE Civil + 5 years experience or Dip. civil +07
years exoerience" - 2
"Survey Engineer / BE Civil + 3 years experience or Dip. civil +07
years experience" - 2
Site Supervisor / Fresh Graduate in Civil or Diploma Civil + 03 Years Exp. Or retired I.T.I. Holder - 4
• Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.- 1302.11 (Rs in Lakhs)
• Regarding statements made in the required attachments are true and correct.
• Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
• Annual Financial Turn Over usually not less than 50% of the estimated annual payments under the contract (Rs in Lakhs)- 2604.220
• Evidence of accesses to Financial Resources
• Proposed methodology and programme of construction.
• Litigation History
• Affidavit
• Undertaking
• Time of Completion
• I.T. & G.S.T. Registration & clearance Certificate
• Labour License
• Character Certificate
• Bidding Capacity
• Existing commitments and ongoing works
• Work for which Bid already submitted
• Bid Security
• Bid Validity
• NOC for Debar (If required)
CIVIL
PERCENTAGE
L1
1
22 documents required · 22 mandatory
₹10,000
Processing Fee: 5900
₹62.1 L
Office of the Chief Engineer, Flood Control & Drainage, WRD, Patna
31 May 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
11 Mar 2026
6 Mar 2026
7 Mar 2026
Technical Sheet
Name of Work Anti Erosion work on right bank of river Ganga in front of 58 .00 KM to 59.20 km of BKGE near village Gangapur, Bhusawala, Nandpur & Damodarpur (Jawainiya) AGENDA NO-244/38/2026 Cost of Work as per BOQ(Rs in Lakhs) 0.37600 Date of Completion 15.05.2026 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sactioned Amount Rs. 5208.42659 Lakhs Date of Sanction Last Date of Uploading Tender 11.03.2026
Sl No. Items Requirement Requirement Cl. No. Name of the contractor
Address of Contractor
1 Bid Validity Bids shall remain valid for a period not less than 120 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 120 Days 15.1 Page/19 Bid validity periods In days
2 Bid Security (A) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement. Amount To be entered (Rs in Lakhs)
(B) Earnest Money can be paid through Internet Payment Gateway (Credit/Debit Card), Net Banking, NEFT/RTGS in online mode.
Bid Security Amount - (Rs. In Lakhs) 62.085 Bid Security Amount - (Rs in Lakhs)
3 (i) Legal Status of Bidder. 4.3(a) Page-12
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-12
4 Total value of civil engineering construction work performed in last five years. 1. Annual Financial Turn Over usually not less 50% of the estimated annual payments under the contract (Rs in Lakhs) 4.5(A) (a) & 4.3 (f)
2020-21 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17
2024-25 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08
5 Work Experience of Similar nature Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs) Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done as prime contractor in any one year during last five years. Items Unit Quantity 4.5A( c) Page-13
Earth Work (Excavation, Filling, Back Filling etc. combined quantities in M3) M3 28067 Value to be entered in unit cum
Protection works (Pitching/ Crating/ Soling with Boulder/ Brick/ Geobag/ E.C.bag/ Nylon crates/Gabians etc. combined quantities in M3) M3
Cement Concrete (P.C.C., R.C.C., P.S.C, etc. combined quantities in M3) M3 59.62
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period 4.7 Page- 14
(a) Existing commitments and ongoing works Page - 35 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 35 Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment Nos. Max. Age 4.5(B) (a) Page-13,31 Nos./ Max. Age
Pocklain / Excavator / Front End Loader 6 8
Tractor / Tipper / Dumper 30 / 15 / 15 5 / 6 / 6
Concrete Mixes with Integral Weigh Batching Facility 1 5
9 Key Personnel Personnel/Qualification/Contract Package Size 4.5(B) (b) Page-13,32 Name of the Personnel and Experince in years
Project Manager / BE Civil + 10 years experience (5years as manager) or retired EE 1
Site Engineer / B.E. Civil + 07 Years Exp. (3 years in Irrigation works) or retired A.E. 4
Quantity Surveyor / BE Civil + 5 years experience or Dip. civil +07 years exoerience 2
Survey Engineer / BE Civil + 3 years experience or Dip. civil +07 years experience 2
Site Supervisor / Fresh Graduate in Civil or Diploma Civil + 03 Years Exp. Or retired I.T.I. Holder. 4
10 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 4.2(i) Page-11 & 39 Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) 4.3(l) Page-12
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) 4.3(j) Page-12, P40
13 Affidavit Regarding statements made in the required attachments are true and correct. Page-40
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 4.2(ii) Page-11, Page - 40
15 Time of Completion Upto 15.05.2026 To be entered in months
16 Registration No.
17 I.T. & G.S.T. Registration & clearance Certificate
18 Labour License
19 Character Certificate
20 NOC for Debar (If required)
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed (cum) @ Remarks
Cement Concrete (including RCC & PCC) Masonry Earth works WBM WMM Bituminous Work Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 COST OF BOQ & BID SECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK (E/W, GSB, WMM, BITUMINOUS WORK, PCCetc) EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 LABOUR LICENSE
18 CHARACTER CERTIFICATE
19 IT & ST REGISTRATION and CLEARANCE CERTIFICATE
20 NOC FOR DEBAR
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
Bill of Quantity Anti Erosion work on right bank of river Ganga in front of 58 .00 KM to 59.20 km of BKGE near village Gangapur, Bhusawala, Nandpur & Damodarpur (Jawainiya) AGENDA NO-244/38/2026
Last Date & Time of Uploading Tender :- 11.03.2026 upto 3.00 PM
Estimated Cost:- 520842659
Earnest Money :- 6208500
Date of Completion :- 15.05.2026
Cost of BOQ :- 10000
Beltron Bid Processing Fee :- 5900
Sl. No. Item Quantity Unit Rate Amount (Rs)
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) 65092.5 M3
2 Supply of new bag and NC with labour for filling new EC bag with local sand ( volume of filled bag 1.20 cft and weight 50 Kg ) stiching on two lines by approved nylon thread with stiching machine & generator ,stacking the bags and placing in nylon crate of size ( 1.20 mX1.00mX1.00m ) with a lead of 150 m including supply of nylon thread, carraige of local sand filled EC bag by boat from lead 1/2 Km & royalty of local sand. All complete as approved design,specification and direction of E/I. 41688 No 1830.3
3 Supply of new bag with labour for filling new EC bag with local sand( volume of filled bag 1.20 cft and weight 50 Kg ) stiching on two lines by approved nylon thread with stiching machine & generator ,stacking the bags and placing with a lead of 150 m including supply of nylon thread etc including carraige of local sand filled EC bag by boat from lead 1/2 Km & royalty of local sand. All complete as approved design,specification and direction of E/I. 52100 % Nos 7058.5
4 Providing and Labour charge for pitching above water in appron and slope of bank with boulder in mechanically woven double twisted hexagonal shape wire mesh gabion boxes/crates of required sizes , mesh size 10 cm x12 cm havilly zinc coated meshwire dia 8 to 10 SWG, mechanically edged /salvaged with partion at every one mtr interval as per IS 16014- 2012 of specified size 3.00 m x 1.50 m x 0.60 m (material within 50 mtr lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire , cost of G.I wire all complete, Cost of boulder of size 150mm to 300 mm with carriage from Mirzapur as per approved design , specification and direction of E/I 23100 No 13054.7
5 Providing and Labour charge for pitching above water in appron and slope of bank with boulder in mechanically woven double twisted hexagonal shape wire mesh gabion boxes/crates of required sizes , mesh size 10 cm x12 cm havilly zinc coated meshwire dia 8 to 10 SWG, mechanically edged /salvaged with partion at every one mtr interval as per IS 16014- 2012 of specified size 3.00 m X 1.50 m X 0.30 m ( material within 50 mtr lead and all lifts ) including boxing and tying the crates with 12 to 14 gauge G.I wire, cost of G.I wire all complete , Cost of boulder of size 150mm to 300 mm with carriage from Mirzapur as per approved design , specification and direction of E/I 4436 No 7578.8
6 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I 20670 M2
7 Providing and Labour charge for pitching work on appron slope of bank with stone boulder duly packed (Uncreated complete job ) materials withing 50 m lead with all lifts, all complete including cost of Boulder of size 150mm to 300mm with carriage from Mirzapur as per approved design , specifications and direction of E/I 733.54 M3
8 Earth work in filling in foundation trenches and back filling of structures in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finaly dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable prpfile within a lead of 30 mtr and lift of 1.5 mtr. complete job as per specifications and direction of E/I. 5075 M3 151.1
9 Construction of RCC (1:1.5:3) Porcupine 6 legs of size 3.0m x 0.1m x 0.1 each having 4 no of 8mm dia tor steel (TMT FE-500), 6mm strirrups @0.15m c/c spacing with aggregate of 20mm to 10 mm size, OPC 43 Grade cement and quality sand having FM-2 and carriage to work site and placing, fitting, fixing with MS nuts and bolt in proper position all taxes, royality and including carriage of Stone chips from Mirzapur as per approved design, specifications and direction of E/I 828 Per set 7914.9
Add Seignorage Fee
Seignorage Fess 10% Royalty of Local sand 37206.200000000004 M3 7.5
Seignorage Fess 10% Royalty+ cost of Boulder 55420.54 M3 71.15
Seignorage Fess 10% Royalty + cost of Coarse sand M3 59.811
Seignorage Fess 10% Royalty + cost of Stone Chips M3 93.715
Executive Engineer, Flood Control Division, Buxar
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
order_0200.pdf
NIT • 0.38 MB
letter_1015.pdf
NIT • 0.82 MB
letter_0599_m.pdf
NIT • 0.44 MB
letter_00124_m.pdf
NIT • 0.25 MB
LETTER NO.274.doc
NIT • 0.34 MB
Letter No. 686.pdf
NIT • 5.86 MB
Letter no. 536.pdf
NIT • 3.33 MB
LETTER NO. 204.doc
NIT • 0.54 MB
DOC-20231107-WA0081..pdf
NIT • 1.19 MB
NIT 02 2025-26.pdf
NIT • 8.67 MB
TechnicalBid NIT-02.xls
NIT • 0.14 MB
SBD NIT-02.doc
NIT • 1.50 MB
BOQcumFinancialBid NIT 02.xls
NIT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .