| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | FRANCIS PINHERO L1 |
|---|---|---|---|---|
| 1.00Motor Overhauling Works | ||||
| 1.00 | OD56986/2025-2026:Dismantling the 25 HP motor into stator and rotor, cleaning the winding attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the winding , reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 8 | each | 4,524.02 ₹36,192.16 |
| 1.00 | OD56987/2025-2026:Dismantling the 40 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 1 | each | 6,392.65 ₹6,392.65 |
| 1.00 | OD56985/2025-2026:Dismantling the 50 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 1 | each | 6,392.65 ₹6,392.65 |
| 2.00Motor Lowering Works | ||||
| 2.00 | OD56984/2025-2026: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load. | 3 | each | 1,029.3 ₹3,087.90 |
| 2.00 | OD56983/2025-2026:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 6 | each | 4,360.52 ₹26,163.12 |
| 3.00Consumables and Supplies | ||||
| 3.00 | OD57004/2025-2026:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make. | 1 | each | 4,077.05 ₹4,077.05 |
| 3.00 | OD56990/2025-2026:Supply and Fixing of 200/5 A, 10 VA, accuracy class 1, Resin Cast Metering CT | 3 | each | 1,183.76 ₹3,551.28 |
Tender Value
₹4.0 L
EMD Value
₹10,061
Closing Date
11 Feb 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Chengal, Painkimala, Kannamkulam, Onamvely, Piraroor and Kodinjili LIS under Electrical Irrigation Section Kalady - Electrical General Electrical Work
2025_Irrig_811435_39
PWD/BLDG/10715/KLDY/2025-2026
Open Tender
Electrical Works
365 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹890
₹10,061
25 Mar 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Motor Overhauling Works
OD56986/2025-2026:Dismantling the 25 HP motor into stator and rotor, cleaning the winding attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the winding , reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD56987/2025-2026:Dismantling the 40 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD56985/2025-2026:Dismantling the 50 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD56984/2025-2026: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load.
OD56983/2025-2026:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD57004/2025-2026:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make.
OD56990/2025-2026:Supply and Fixing of 200/5 A, 10 VA, accuracy class 1, Resin Cast Metering CT
OD57001/2025-2026: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD56998/2025-2026:Supply and Installing 20 W LED Tube light.
OD56993/2025-2026:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD56992/2025-2026:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD56991/2025-2026:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
90.14.5:Supply and fabrication conveyance and installation of angle iron frame work for wall mounting panel board
90.16.3.3:Supply and clamping the following size of strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 X 3 mm GI flat duly painted or heavy duty GI spacer saddles spacing of clamps not exceeding 1 m, making good the damages, colour washing etc. as required ( for horizontal run)25 x 6 mm GI strip
OD57003/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 50HP motor / pump set as per the direction of Departmental staff at site.
OD57002/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6310 , SKF / FAG or equivalent, suitable for 25HP motor / pump set as per the direction of Departmental staff at site.
OD56996/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6313 , SKF / FAG or equivalent, suitable for 30 HP motor / pump set, as per the direction of Departmental staff at site.
OD56994/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6307 , SKF / FAG or equivalent, suitable for 25 HP motor / pump set, as per the direction of Departmental staff at site.
OD57005/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump as per the direction of Departmental staff at site.
OD56999/2025-2026:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 70 or equivalent suitable for 50 HP motor's fully automatic star delta starter
OD57006/2025-2026:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 70 or equivalent suitable for 40 HP motor's fully automatic star delta starter
OD56997/2025-2026:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 40 or equivalent suitable for 25 HP motor's fully automatic star delta starter
OD56988/2025-2026:Supply and fixing of L&T MN5 Overload relay for 50 HP Squirrel cage motor starter
OD56989/2025-2026:Supply of electronic timer for FASD(L&T ST 80329000 ) or equivalent
OD57000/2025-2026:Supply , Conveyance and fitting 315/400 A, HRC Fuse Base with suitable HRC Fuse
Motor AMC
OD57008/2025-2026:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 5 Motors, 12 months for Each Motor).
OD57007/2025-2026:Fully Comprehensive Annual Maintenance of 1 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through out the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed.
OD57011/2025-2026: Fully Comprehensive Annual Maintenance of 40 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD57012/2025-2026:Fully Comprehensive Annual Maintenance of 25 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total two motors, 12 months for each motor)
OD57010/2025-2026:Fully Comprehensive Annual Maintenance of 25 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch gears as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total six motors,12 months for each motor)
OD57009/2025-2026:Fully Comprehensive Annual Maintenance of 50 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Motor Lifting Works
OD56981/2025-2026: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD56982/2025-2026:Lifting the 25 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
Winding
OD127626/2025-2026:Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding. power greater than 25 HP,leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro Conveyance.including resetting, refitting, coupling with pump, giving connection, taking trial run with full load etc. complete
OD127634/2025-2026:Charges for rewinding the burnt rotor/stator - separate stater and rotor/stator, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new rotor/stator lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running(Less scrap copper)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1401452.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
BOQ_1401452.xls
BOQ • 0.33 MB
NIT.pdf
Tender Documents • 0.02 MB
SBD.pdf
Tender Documents • 1.63 MB
MAKE.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid