| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | -5.99% | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 LAdmitted-Finance | -4.99% | ₹8.0 L | L2 | Admitted-Finance |
| 3 | L3₹8.4 LAdmitted-Finance | -1.00% | ₹8.4 L | L3 | Admitted-Finance |
| 4 | L3₹8.4 LAdmitted-Finance | -1.00% | ₹8.4 L | L3 | Admitted-Finance |
| 5 | L4₹10.2 LAdmitted-Finance | +21.00% | ₹10.2 L | L4 | Admitted-Finance |
Tender Value
₹10.0 L
EMD Value
₹9,980
Closing Date
2 May 2026, 5:00 pmClosed
Executive Officer Barbil Municipality
Executive Officer Barbil Municipality
Construction of Bathing ghat at Karrow River near Pump house, Chatei hutting, Ward No.14, Barbil Municipality
2026_ORULB_128192_14
BBLM-1/2026-27
Open Tender
Civil Works - Others
90 days
Barbil
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹9,980
Yes
14 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
2 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in stony earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed including all cost. | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 2 | Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete. | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 3 | Plain cement concrete (1:4:8) using 40 mm. size hard crusher broken granite stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 4 | Cement concrete of M-20 grade with 20 mm and down grade black hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalties & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete with Centring and shuttering. | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 5 | Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tying the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties, taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge | - | qtl | - | - | BI01010001010000000000000515BI0100001119 |
| 6 | Cement concrete of M-20 grade with 20 mm and down grade black hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalties & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete . | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 7 | 6 mm thick CP in CM(1:4) including watering and curing cost, conveyance, royalties & taxes of all & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. | - | Sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 8 | Neat cement punnlng for skirting including watering and curing cost, conveyance, royalties & taxes of all & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. | - | Sqm | - | - | BI01010001010000000000000515BI0100001122 |
| 9 | Cost for Dewatering during execution of work including all cost as directed by Department, | - | nos | - | - | BI01010001010000000000000515BI0100001123 |
| 10 | Provision of photographs at different stage of execution of the work with all cost. | - | nos | - | - | BI01010001010000000000000515BI0100001124 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
DTCN.pdf
Tender Documents • 0.73 MB
BOQ_588098.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid