Tender Value
₹5.4 L
EMD Value
₹14,000
Closing Date
6 Aug 2026, 5:00 pm
AEE TCSD Meppayur
Office of the Assistant Executive Engineer, TC Sub Division, Meppayur, K.S.E.Board Ltd. Iringath(P.O), Kozhikode -673523
Construction of RR platform at 110kV Substation Chakkittapara
2026_KSEB_861473_1
TCSDM 01/26-27
Open Tender
Civil Works - Others
Percentage
60 days
110kV Substation Chakkittappara
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,298
₹14,000
20 Jul 2026
20 Jul 2026
11 Aug 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | - | m3 | 0.32 | - |
| 2 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | m3 | 0.24 | ₹0.24 |
| 3 | Filling with departmental earth ( excluding rock)in open areas in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1.5m as per direction of site engineer in charge | - | m3 | 1 | - |
| 4 | Filling using Contractors own earth in trenches, plinths, sides of foundations etc. in layers not exceeding 20 cm in depth,consolidating each deposited layer by rammming and watering,lead upto 50m and lift upto 1.5m | 1 | m3 | 0.16 | ₹0.16 |
| 5 | Supplying and filling quarry muck in trenches of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.50m | - | m3 | - | - |
| 6 | Centering and shuttering including strutting,propping etc. and removal of form for foundations,footing and base of columns | - | m2 | 0.76 | - |
| 7 | Providing and laying in position specified grade of Reinforced Cement concrete ,excluding the cost of centering,shuttering,finishing and reinforcement-All work upto plinth level. 1:1.5:3(1cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size) | - | m3 | 0.04 | - |
| 8 | Steel reinforcement for RCC work including straightening,cutting, bending,placing in position and binding all complete.Thermo-Mechanically Treated bars of grade Fe500D or more. | - | kg | 0.72 | - |
| 9 | Plastering using 12mm cement plaster of mix 1:4 (1 cement:4 fine sand) including all cost of materials,labour charges etc.complete For walls | - | m2 | 0.52 | - |
| 10 | Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) including cost of through stone and bond stone | 1 | m3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
conditions.pdf
Tender Documents • 0.87 MB
GSTSTATUS.pdf
Other Document • 0.13 MB
BOQ_1456945.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].