Executive Engineer
O/o the EE PWD Bridges Division Kozhikode
Rehabilitation work to Pulikkayam bridge in Thivuvambady LAC in Kozhikode district
2026_PWD_876727_1
D1/EE/TN53
Open Tender
Civil Works - Bridges
Item Rate
180 days
Mananchira
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
6 Oct 2026
6 Oct 2026
16 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rehabilitation | |||||
| 1.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.04 | Hectare | - | - |
| 1.002 | OD184296/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 98.03 | sqm | - | - |
| 1.003 | OD184297/2025-2026:Rust remover/Rust Convertor:
Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as required to exposed reinforcement bar at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries complete as per detail specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface area containing the cleaned rebars shall be measured for payment. | 4.35 | sqm | - | - |
| 1.004 | OD184292/2025-2026:Anti Corrosive treatment to Steel:
Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars, after cleaning & removing scales and rust completely as specified in 1.4, Two component inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40 microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as per manufacturer?s specification in two coats at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, necessary surface preparation and necessary protection after and during work. The concrete surface area contianing the rebars where the treatment is carried out shall be considered for measurement. | 4.35 | sqm | - | - |
| 1.005 | OD184290/2025-2026:New/Additional steel Reinforcement:
Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing with old existing reinforcement which was reduced to 15 % or more of its original diameter as required as provided in original structure and additional steels as directed by EIC and/ or consultant as required tying with 16 gauge annealed binding wire complete as per drawing and specifications for all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant (TMT BARS of various size as required) | 55.94 | kg | - | - |
| 1.006 | OD184298/2025-2026:Polymer Modified Mortar (Pre-Packed):
Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturer?s specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification . Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant.
(Payment to be made in Sq.M for thickness upto 50mm of PMM for patch area repaired) | 135.81 | sqm | - | - |
| 1.007 | OD184291/2025-2026:Microconcrete Reinstatement for thickness more than 50mm for RCC members:-
Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items) | 20.1 | sqm | - | - |
| 1.008 | 14.9:Drainage Spouts complete as per drawing and Technical specification | 24 | no | - | - |
| 1.009 | OD184293/2025-2026:Providing and fixing hanging platform for inspection of repair works using steel hollow sections
and maintaining it in a serviceable condition for the required duration as approved and
removing it there after. The scaffolding system shall be equipped with accessibility provisions
with ladders and the same shall be stiffened with bracings, runners, connection with the bridge
deck etc. at required location with essential safety features for the workmen etc. complete as per
directions and approval of Engineer- in Charge. The horizontal area of the scaffolding shall be
measured for payment purpose. The payment will be made once irrespective of duration of
scaffolding | 438.75 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1489295.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .