Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹46.2 L
EMD Value
₹47,000
Closing Date
5 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, panchayat, R & B Division, Surat.
CDP-5 2024-25 [1]PROPOSED CONSTRUCTION OF PANCHAYAT BHAVAN AT KIM TA: OLPAD, DIST: SURAT.
357365
10 OF 2026-27
Open
Civil Works - Buildings
Works
Surat
5 documents required · 5 mandatory
₹1,500
Executive Engineer, panchayat R & B Division, surat
₹47,000
21 Oct 2026
21 Oct 2026
21 Oct 2026
5 Nov 2026
21 Oct 2026
180 days
Name of Work:-CDP-5 2024-25 [1]PROPOSED CONSTRUCTION OF PANCHAYAT BHAVAN AT KIM TA: OLPAD,
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) Figures
1 Excavation for foundation upto 1.5 m depth 173.50 Cum. 122.93
including sorting out and stacking of useful
materials and disposing off the excavated stuff upto
50 Meter lead. (A) Loose or soft soil
2 Excavation for foundation upto 1.5 m to 3.0 m depth 98.50 Cum. 136.47
including sorting out and stacking of useful
materials and disposing off the excavated stuff upto
50 Meter lead. (A) Loose or soft soil
3 Filling available excavated earth (Including rock in 232.00 Cum. 136.91
trenches plinth, sides of foundations etc. in layers
not exceeding 20 cm. in depth consolidating each
deposited layer by ramming and watering)
4 Providing & filling in plinth with murrum or yellow 40.50 Cum. 301.77
soil or selected soil in layers of 20 cm. Thickness. Incl.
watering, ramming & consolidation etc. complete.
5 Filling in plinth with sand under floors including 20.50 Cum. 481.80
watering ramming, consolidating and dressing
6 Providing and laying cement concrete 1:2:4 (1- 27.00 Cum. 3923.85
Cement : 2- coarse sand : 4- hand Machine crushed
stone aggregates 40 mmnominal size) and curing
complete including cost of formwork in (A) PCC
7 Providing and laying controlled cement concrete 27.00 Cum. 4494.50
M.250 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in foundation, footings
base of column and mass concrete. (A) Footing
8 Providing and laying controlled cement concrete 5.50 Cum. 8226.45
M.250 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Column
D) Column, Pillers, posts and struts , upto Plinth
9 Providing and laying controlled cement concrete 6.60 Cum. 8191.10
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Column
D) Column, Pillers, posts and struts, upto Ground
10 Providing and laying controlled cement concrete 5.20 Cum. 8232.05
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Column
D) Column, Pillers, posts and struts, upto First Floor
11 Providing and laying controlled cement concrete 2.50 Cum. 8354.92
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Column
D) Column, Pillers, posts and struts, upto Terrace
12 Providing and laying controlled cement concrete 11.05 Cum. 6440.77
M.250 and curing complete inculding the cost of
formwork but Excluding the cost of the cost of
reinforcement for reinforced concrete work in
Beams. (E) Beam, upto Plinth
13 Providing and laying controlled cement concrete 10.85 Cum. 6406.43
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of
Beams,(E) Beam, Ground Floor
14 Providing and laying controlled cement concrete 11.70 Cum. 6447.38
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of
Beams,(E) Beam, First Floor
15 Providing and laying controlled cement concrete 3.70 Cum. 6488.34
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of
Beams,(E) Beam, Terrace Floor
16 Providing and laying controlled cement concrete 15.50 Cum. 6351.89
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Slab,All
Thickness (C) Slab upto Plinth and Ground Floor
17 Providing and laying controlled cement concrete 14.00 Cum. 6392.84
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Slab,All
Thickness (C) Slab for First Floor
18 Providing and laying controlled cement concrete 2.20 Cum. 6433.80
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Types of Slab,All
Thickness (C) Slab for Second Floor
19 Providing and laying controlled cement concrete 8.00 Cum. 6758.92
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Thickness in Walls
PARDI Ground Floor
20 Providing and laying controlled cement concrete 4.00 Cum. 6799.87
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Thickness in Walls
PARDI First Floor
21 Providing and laying controlled cement concrete 3.50 Cum. 6840.83
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in All Thickness in Walls
PARDI Terrace Floor
22 Providing and laying controlled cement concrete 2.50 Cum. 5951.93
M.200 and curing complete inculding the cost of
formwork and Excluding reinforcement for
reinforced concrete work in All Types of Stair case
upto Ground Floor
23 Providing and laying controlled cement concrete 2.50 Cum. 5992.88
M.200 and curing complete inculding the cost of
formwork and Excluding reinforcement for
reinforced concrete work in All Types of Stair case
upto First Floor
24 Providing and laying controlled cement concrete 1.50 Cum. 5949.91
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in Lintel upto Ground
25 Providing and laying controlled cement concrete 1.00 Cum. 5990.86
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in Lintel upto First Floor
26 Providing and laying controlled cement concrete 0.20 Cum. 6031.80
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in Lintel upto Terrace
27 Providing and laying controlled cement concrete 3.50 Cum. 5738.82
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in Chajja. Upto Ground
28 Providing and laying controlled cement concrete 3.50 Cum. 5779.77
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in Chajja. Upto First
29 Providing and laying controlled cement concrete 0.50 Cum. 5820.74
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of reinforcement
for reinforced concrete work in Chajja. Upto Terrace
30 Providing and fixing TMT bars Fe-500D steel 18009.00 kg 77.82
reinforcement for R.C.C. work including binding,
bending and placing in position complete upto floor
two level ,Ground Floor, First Floor , Second Floor,
Third Floor, Terrace Floor (all floor).
31 Applying general insecticide pest control treatment 135.00 Sqmt 91.62
to floors, cupboards etc including labour material
etc. complete. Using Heptachloride 20 EC. As Per
6113_pests Consentration Weight 0.50 percent is
recommended one litre chemical emulsion dillute
32 Brick work using common brunt clay building bricks 11.50 Cum. 4214.32
having crushing strength not less than 35 kg/sqcm. in
foundation and plinth in cement mortar 1:6 (1
cement :6 fine sand) etc.comp. (B) Conventional
Ground floor upto Plinth
33 Brick work using common brunt clay building bricks 41.00 Cum. 4503.04
having crushing strength not less than 35 kg/sqcm. in
superstructure above plinth level upto floor two level
in cement mortar 1:6 (1 cement :6 fine sand)
etc.comp. (B) Conventional Ground Floor
34 Brick work using common brunt clay building bricks 30.00 Cum. 4545.16
having crushing strength not less than 35 kg/sqcm. in
superstructure above plinth level upto floor two level
in cement mortar 1:6 (1 cement :6 fine sand)
etc.comp. (B) Conventional First Floor
35 Brick work using common brunt clay building bricks 18.00 Cum. 4587.27
having crushing strength not less than 35 kg/sqcm. in
superstructure above plinth level upto floor two level
in cement mortar 1:6 (1 cement :6 fine sand)
etc.comp. (B) Conventional Terrace Floor
36 Half brick masonry in common brunt clay building 9.00 Sqmt 685.65
bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -
coarse sand ) in (B) Conventional Ground Floor
37 Half brick masonry in common brunt clay building 24.00 Sqmt 741.48
bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -
coarse sand ) in (B) Conventional First Floor
38 Providing 15mm thick cement plaster in single coat 329.50 Sqmt 161.19
on Rough (Similar)side of single or Full/half brick
walls for interior plastering upto floor two level and
finished even and smooth in (ii) Cement mortar 1:4
(1-cement :4-sand) Ground Floor
39 Providing 15mm thick cement plaster in single coat 224.00 Sqmt 185.75
on Rough (Similar)side of single or Full/half brick
walls for interior plastering upto floor two level and
finished even and smooth in (ii) Cement mortar 1:4
(1-cement :4-sand) First Floor
40 Providing 15mm thick cement plaster in single coat 92.50 Sqmt 210.32
on Rough (Similar)side of single or Full/half brick
walls for interior plastering upto floor two level and
finished even and smooth in (ii) Cement mortar 1:4
(1-cement :4-sand) Terrace Floor
41 Providing & laying10 mm. thick cement plaster in 135.00 Sqmt 148.31
single coat on fair side of ceilings for interior
plastering upto floor two level and finishing with
smooth mala plaster.(i) Cement mortar 1:4 (1
cement : 4 sand) Ground Floor
42 Providing & laying10 mm. thick cement plaster in 121.50 Sqmt 170.71
single coat on fair side of ceilings for interior
plastering upto floor two level and finishing with
smooth mala plaster.(i) Cement mortar 1:4 (1
cement : 4 sand) First Floor
43 Providing & laying10 mm. thick cement plaster in 12.50 Sqmt 193.10
single coat on fair side of ceilings for interior
plastering upto floor two level and finishing with
smooth mala plaster.(i) Cement mortar 1:4 (1
cement : 4 sand) Terrace Floor
44 20mm thick sand faced cement plaster on walls upto 388.00 Sqmt 315.68
height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3-
sand) and 8mm thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete. Upto Ground Floor
45 Providing throating or plaster drip and moulding to 90.00 RMT 44.27
R.C.C. Chhajja.
46 Providing and laying polished Granite Slab 18mm 18.50 Sqmt 2377.54
thick in Flooring laid 20mm thick Cement Mortar 1:4
(1-Cement : 4-Coarse Sand) and jointed with Grey
Cement Slurry including full molded round front
edges , rubbing and polishing etc. complete.
47 Providing and laying polished Granite Slab 18mm 76.50 Sqmt 2408.85
thick in Risers of steps Dedo, window sill, jembs and
pillars laid 10 mm thick Cement Mortar 1:4 (1-
Cement : 4-Coarse Sand) and jointed with Grey
Cement Slurry including full molded round edges
48 Providing and laying Vitrified tiles 8 to 10 mm thick , 208.00 Sqmt 1120.36
24'' x 24'' in flooring treads of steps and landing laid
on a bed of 12mm thick cement mortar 1:3 (1-
cement : 3-coarse sand ) finishing with flush pointing
in white cement.Soluble Salt PVT. Tiles in All Rooms.
49 Providing and laying Vitrified tiles 8 mm thick , 24'' x 75.00 Sqmt 1195.02
24'' in skrting risers of steps and dedo on 10mm thick
cement plaster 1:3 (1-cement : 3-coarse sand) and
jointed with white cement slurry Soluble Salt PVT.
Tiles in All Rooms.
50 Providing and fixing 37 mm thick flush door both 22.00 Sqmt 3767.30
sides laminated andshutter fabricated from 35 mm
thick solid core malemine faced three layered pre
laminated flat pressed wood based exterior grade
bonded BWP/BWR synthetic resin having stamped IS
51 Providing and fixing FRP frame size 125x65 mm and 10.50 Sqmt 2615.04
35mm thick FRP shutter having extra reinforcement
on sides & edges in polish finish. The core of the
shutter & frame is to be filed up with injected
polyurethene foam done in situ alongwith embedded
wooden pieces for stiffening & also taking hinges &
fintures. The whole FRP frame & shutter is to be
water proof weather proof, termite proof &
resistance to mild acid/alkali. Rates are to be
inclusive of S.S hinges with necessary screws &
alluminium S.S fixtures & fastenings & fastener
52 Providing and fixing window having extruded 49.50 Sqmt 1583.95
aluminum Colour anodized section frame main outer
size 95mm x 24mm x 1.17mm @ wt.of 0.738 Kg/mt
horizontal Three track member size 92mm x
31.75mm x 1.30mm,@ Wt.1.07 Kg/mt , vertical
member of size 92mm x 31.75mm x 1.50mm @ Wt.
1.06 Kg/mt with two sliding shutters of horizontal
member size 40 mmx18mm x1.29mm @ wt.of
Kg/mt, vertical member of size 40mm x 18mm x
mm @ wt.of 0.456Kg/mt/ with one mosquito net
with 5 mm thick transparent bronze colour tinted
float glass with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass fixing to
frame as per details etc
53 Providing and fixing standared extruded of 1.50 Sqmt 1175.55
alluminium section of size 63mm x 38.10mm x
1.2mm (Wt. 0.643 Kg/mt) with colour anodized
alluminium frame for ventilation with 5 mm thick
frosted glass as details etc complete for Ventilation
54 Providing and fixing M.S. grill of required pattern of 520.00 kg 117.16
windows etc. with M.S.. flats at required spacing and
frame alround square or round headed bolts and
nuts or by screws.including applying a priming coat
of red lead paint and two coats of oil painting
55 Applying two coats of Birla (white cement based) or 646.00 Sqmt 130.64
(acrylic lapy- putty) or equivalent & two coats of
primer of approved brand and manufacture on new
wall surface to give an even shade including
thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered
smooth. with Wall painting (three coats) with plastic
emulsion paint of approved brand and manufacture
on undecorated wall surface to give an even shade
including throughly brushing the surface free from
mortar droppings and other foreign matter and sand
papered smooth.
56 Applying two coats of Birla (white cement based) or 269.00 Sqmt 173.19
(acrylic lapy- putty) or equivalent & two coats of
primer of approved brand and manufacture on new
Ceiling surface to give an even shade including
thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered
smooth. Ceiling painting (three coats) with plastic
emulsion paint of approved brand and manufacture
on undecorated Ceiling surface to give an even shade
including throughly brushing the surface free from
mortar droppings and other foreign matter and sand
papered smooth.
57 Finishing wall with weather proof exterior emulsion 387.57 Sqmt 166.65
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the
surface to remove all dirt, and remains of loose
powdered materials.etc complete. Priming: Apply a
liberal coat of exterior acrylic primer and allow it to
dry for 4-5 hours. Application of putty is not
recommended. Minimum 4-6 hours duration is
required between each coat of weather shield max
58 Applying priming coat over new steel and other 6.50 Sqmt 128.62
metel surface after and including preparing the
surface by throughly cleaning, oil,grease, dirt and
other foreign matter and scoured with brushes fine
steel wood, scrapers and sand paper with ready
mixed priming paint brushing red lead. and Painting
two coats (excluding priming coat) on new steel and
other metal surface with enamel paint, brushing,
interior to give an even shade including cleaning the
surface an even shade including cleanicn the surface
of all dirt, dust and other foreign matter.
59 Steel work welded in built up sections, framed work 0.36 Quintal 9108.47
including cutting, hoisting, fixing in position and
applying a priming coat of red lead paint :-
(A) In beams and joints channels angles, column,
tees, flats with connecting plates or angle cleats as
60 Providing and laying integral cement based water 141.50 Sqmt 880.72
proofing treatment including preparation of surface
as required for treatment of roofs, balconies,
terraces etc. consisting of following operations.
(a) Applying and grouting a slurry coat of neat
61 Providing and fixing Stainless Steel railing having 50 19.50 RMT 3101.71
mm dia hollow stainless steel pipe as hand rail and
32 mm dia hollow stainless steel pipe with
combination of 10 cm long 16mm dia pipe as per
virtical supports 20 mm dia hollow stainless steel
62 Providing and fixing wash down water closet 4.00 Nos 4327.52
(European type, W.C. Pan) with integral P or S trap
including jointing the trap with soil pipe in Cement
Mortar 1:1 (1-Cement : 1-fine sand) (Seal and cover
to be measured and paid for separately)(A) vitreous
China Pattern :(i) in white colour, Providing and fixing
12.5 Litres low level flushing cistern with a pair, of
C.I. or Mild brackets, complete with fittings such as
lead valve less syphon, 15mm nom.nal size brass ball
valve with polythene float, C.P brass handle unions
and couplings for connections, with inlet, outlet and
overflow pipes, 40mm dia.porcelain enamelled flush
bend including cutting holes in walls and making
good the same connecting the flush bend with
cistern and closet (overflow pipe to be measured and
paid for separately)(A) Vitreous China (I) In white
colour, Providing and fixing plastic seat and cover for
wash down water closer with C.P. brass hinges and
rubber buffers. (B) Black plastic seal and cover, With
Jet spray heavy duty with S.S. Braided hose 60 cm
63 Providing and fixing washbasin with single hole for 4.00 Nos 2461.70
pillar tap with C.I. or M.S. brackets painted white
including sutting holes and making good the
Providing and fixing C.P. brass waste for washbasin
or sink. (A) 32mmdia.,Providing and fixing pillar tap,
64 Providing and fixing PVC SWR Nahni trap IS 14735 for 10.00 Nos 599.63
drain - 100 mm diameter with jali of the following
nominal diameter of self cleansing design with C.I
scread down or hinged grating including the cost of
cutting and making good the walls.
65 Providing and fixing screw down bib taps of following 10.00 Nos 186.82
size.(A) Brass screw down bib tap polished bright.
66 Providing & fixing of overhead shower 80 mm (3”) 2.00 Nos 1151.87
dia with 3 flow with Overhead Shower arm 200 mm
with wall flange complete (i) 15mm dia.,Providing
and fixing brass screw down stop tap.(A) 15mm dia.
67 Providing and fixing Kitchen sink with C.I. or M.S. 1.00 Nos 3204.92
brackets, painted white including cutting holes in
walls and making good the same (C) S.S. & Sink.(i)
600mm x 450mm x 150mm size with Providing and
fixing C.P. brass waste for washbasin or sink. (A)
68 Providing and fixing 600mm x 450mm bevelled edge 4.00 Nos 859.40
mirrror of superior glass mounted on 6mm thick A.C.
sheet or plywood sheet and fixing to wooden pluge
with C.P. brass screws and washers.
69 Providing and fixing C.P. brass towel rail comlete 1.00 Nos 616.42
with C.P. brass brackets fixed to wooden plugs with
C.P. brass scews.(B) 600mm x 20mm size.
70 Providing and fixing 600mm x 120mm glass shelf 1.00 Nos 544.51
with C.P.brass bracket and guard rail complete mixed
to wooden plug with C.P. brass screws
71 Providing and fixing Gun metal check or non-return 2.00 Nos 420.63
fullway wheel valve. 25mm. dia.
72 Providing and fixing Gun metal check or non-return 2.00 Nos 663.42
fullway wheel valve. 40mm. dia.
73 Providing and fixing chromium plated brass half turn 4.00 Nos 263.77
flush cock of approved quality including fixing in pipe
line etc. complete.(ii) 25mm dia.
74 Providing and fixing ball cock of approved. quality as 1.00 Nos 132.88
directed.(A) Copper Metal (A) 25mm. dia.
75 Providing laying and jointing in true line and level 48.00 RMT 72.64
15mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water
including fittings as approved by Engineer In Charge.
Pipe shall be fixed on the wall with the help of clamp
at every two metre C/C or shall be concealed as
directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all materials.
76 Providing laying and jointing in true line and level 46.00 RMT 91.83
25mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water
including fittings as approved by Engineer In Charge.
Pipe shall be fixed on the wall with the help of clamp
at every two metre C/C or shall be concealed as
directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all materials.
77 Providing laying and jointing in true line and level 10.00 RMT 195.66
50mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water
including fittings as approved by Engineer In Charge.
Pipe shall be fixed on the wall with the help of clamp
at every two metre C/C or shall be concealed as
directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all materials.
78 Providing, laying and jointing in true line and level 57.00 RMT 878.56
110 diametre U.P.V.C (Type B) conforming to IS
13592-1992 with one end plain and other end
socketed with rubber ring, & fittings conforming to
ISI 14735-1999 of approved make for drainage
system pipe line, pipe shall be jointed with each
other with rubber lubricant, pipe shall be fixed on
wall using of PVC clamp of the size 110 mm diametre
x 149 mm length x 145 mm heigh at every 2000 mm
center to center or shall be concealed in walls as
directed including necessary fittings such as bends,
shoes etc. including testing of pipes and joints and
jointed with adhesive solvent cement including cost
of all materials.
79 Providing and fixing S.W. gully trap with C.I. grating 2.00 Nos 1246.91
brick masonry chamber and water tight C.I. cover
with frame of 300mm x 300mm size (inside) with
standard weight.(i) Square mouth traps.(B) 150mm x
100mm size P or R type
80 Constructing Brick masonry road gully chamber 3.00 Nos 2017.19
500mm x 450mm x 600mm including 500mm x
450mm C.I. horizontal grating wih frame complete.
81 Constructing brick masonry chamber for 3.00 Nos 2932.92
underground C.I. Inspection chamber and bends with
bricks having crushing strength not less than
35Kg/Cm2 in C.M. 1:5 C.I. cover with frame (Light
duty) 455mm x 610mm intenal dimensions total
weight of cover with frame to be not less than 38Kg.
(Wt. of cover 23 Kg.) and Wt. of frame 15Kg. ) (R.C.C.
top slabe with 1:2:4 mix (1-cement :2- coarse sand :4-
graded stone aggregate 20mm size) foundation
concrete 1:5:10 inside plaster 15mm thick with
cement mortar 1:3 finished smooth with a floating
coat of neat cement on walls and bed concrete etc.
complete.(i) Inside dimensions 455mmx 610mm and
450mm deep for single pipe line.
82 Providing laying (to level or slopes) and jointing 12.00 RMT 257.18
reinforced concrete Light duty non-pressure pipes
I.S. class NP2 of the following internal diameter with
collars and butt ends prepared for collar joints
including testing of joints complete. (B) 150 mm d
83 Providing laying (to level or slopes) and jointing 10.00 RMT 359.84
reinforced concrete Light duty non-pressure pipes
I.S. class NP2 of the following internal diameter with
collars and butt ends prepared for collar joints
including testing of joints complete.(C) 250 mm di
84 Providing laying (to level or slopes) and jointing 10.00 RMT 678.02
reinforced concrete Light duty non-pressure pipes
I.S. class NP2 of the following internal diameter with
collars and butt ends prepared for collar joints
including testing of joints complete.(D) 300 mm di
85 Providing & fixing G.I. Rain water spout of 50 mm.dia 2.00 Nos 101.90
& 30 cm length etc.
86 Providing and fixing in position cowel went to 2.00 Nos 505.17
pipes.(C) 100mm dia
87 Providing erecting and fixing double coated PVC. (ISI) 2000.00 Lit 3.94
water tank of required capacity each with all
necessary fittings and connection etc. complete on
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed
by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt
G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore
in R.C.C. items where the reisa change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
Cement consumption gr.pdf
GST GR 1.pdf
GRs - SBD with Index_11zon (3).pdf
6SBD GR.pdf
CamScanner 04-09-2025 15.03.58.pdf
6.letter pad CE(P)AND AS.pdf
4.Test Schedule (2).pdf
8.tender booklet-1.pdf
3 A1 building booklet.pdf
2.0 GR For Building Work.pdf
5. GR Performance Bond and Bitumen date.pdf
Building Test schedule.pdf
Environment GR_11zon.pdf
DMO_2876_01-May-2025_273.pdf
SBD For VC AND SC.pdf
0.0SBD.pdf
01 GROUND FLOOR AND FIRST FLOOR PLAN.pdf
02 ELEVATION OLPAD.pdf
A5 BOQ Kim Panchayat.pdf
SEPARATE SHEET ATTACHED.pdf
A4 GR For Building Work_11zon.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .