Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A5 SECTOR 22 MEERUT ROAD INDUSTRIAL AREA GHAZIABAD GHAZIABAD UTTAR PRADESH 201003 | GHAZIABAD | UTTAR PRADESH | 201003 | Admitted-Finance |
| 2 | Admitted-Finance 121004 | Admitted-Finance |
| 3 | Admitted-Finance FARIDABAD | HARYANA | 121004 | Admitted-Finance |
| 4 | Admitted-Finance 101 PRIDE KUMAR SENATE BUILDING SENAPATI BAPAT ROAD SENAPATI BAPAT ROAD PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | Admitted-Finance |
| 5 | Admitted-Finance 0 601 RUNWAL ANTHURIUM TOWER NO 5 OPP VEENA NAGAR L B S MULUND WEST MUMBAI MAHARASHTRA 400080 | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
13 Sept 2021, 3:00 pmClosed
R.Govindarajan
Technip India Limited, No19, Velachery main Road, Guindy, Chennai-600032
Design, Engineering, Manufacturing, Inspection including inspection by TPIA, testing at manufacturers work, Packing, Supply of API 610 Centrifugal Pumps
2021_REFHQ_138983_1
TP/077154C001/603/0910-001/012
Limited
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
240 days
IOCL Gujarat Refinery
5 documents required · 5 mandatory
Exempted
7 Feb 2022
30 Jul 2021
14 Sept 2021
30 Jul 2021
13 Sept 2021
25 Aug 2021
30 Jul 2021 - 7 Sept 2021
Design, Engineering, Manufacturing, Procurement of Materials and Bought out Components, Assembly at Shop, Testing at Manufacturer's Works, Inspection by TPIA (Bidder to arrange TPIA including all TPIA charges), Packing, Supply of the following Pumps as specified in the document, including Supply of all Commissioning Spares (Please refer Note-3) & Special Tools and Tackles, all Auxiliaries & Documentation as per the enclosed Standard Specifications, Job Specification, Data Sheets etc. and other Codes and Standards attached or referred in Material Requisition.
LCN SPLITTER REFLUX PUMPS: 603-P-14 A/B (N)
SECOND STAGE HDS FEED PUMPS: 603-P-15 A/B (N)
SECOND STAGE HDS REACTORS QUENCH PUMPS: 603-P-16 A/B (N)
SECOND STAGE HDS STABILIZER REFLUX PUMPS: 603-P-17 A/B (N)
BENZENE REMOVAL BOTTOM PUMPS: 603-P-18 A/B (N)
BENZENE REMOVAL REFLUX PUMPS: 603-P-19 A/B (N)
C6 REMOVAL BOTTOM PUMPS: 603-P-20 A/B (N)
C6 REMOVAL REFLUX PUMPS: 603-P-21 A/B (N)
BENZENE RECOVERY FEED PUMPS: 603-P-22 A/B (N)
C6 FRACTIONATOR REFLUX PUMPS: 603-P-23 A/B (N)
FIRST STAGE HDS LEAN AMINE PUMPS: 603-P-25 A/B (N)
FIRST STAGE HDS RICH AMINE BOOSTER PUMPS: 603-P-26 A/B (N)
CONDENSATE TRANSFER PUMPS: 603-P-28 A/B (N)
Supervision at Site:
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Per diem charges for upto 8 hours work on normal working days
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour beyond normal 8 Hours work on normal working days
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .